MODIFICATION

Y -- BAER - South Hughes Creek Stabilization (Manti LaSal National Forest) - Amendment 1

Notice Date
11/7/2012
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 Utah Acquisition Support Center, 2222 West 2300 South, Salt Lake City, Utah, 84119, United States
 
ZIP Code
84119
 
Solicitation Number
AG-84N8-S-13-0002
 
Point of Contact
Tamera Draper, Phone: 801.975.3370
 
E-Mail Address
tdraper01@fs.fed.us
(tdraper01@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Attachment #2 - Project Specifications (37 pages) Amendment #01 - Site Visit notes and adds Project Specifications This is a combined synopsis/solicitation prepared for a post fire emergency contract to be issued under Federal Acquisition Regulation 6.302-2, and 41 U.S.C.253(c)(2) Unusual and Compelling Urgency, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes/offerors are being requested and a written solicitation is also provided. The USDA Forest Service /Utah Acquisition Support Center in Salt Lake City, Utah is soliciting quotes/offerors for the following requirement: AG-84N8-S-13-0002 BAER - South Hughes Creek Stabilization on the Manti LaSal National Forest. Bids are due no later than November 13, 2012 by 1:00 p.m. (local time) and shall be submitted to: USDA/Forest Service Utah Acquisition Support Center- 2nd floor 2222 W. 2300 S. Salt Lake City, Utah, 84119 The Synopsis/solicitation document and attached solicitation documents provide information on the above referenced solicitation. Offerors must be registered an in active status in the System for Awards Management (SAM) database at the time award is made. Following is the partial Schedule of Items (refer to solicitation package for complete Schedule of Items), and Specifications for the South Hughes Creek Stabilization (reference attached solicitation package for full project description, details and drawings). Facsimile is accepted and can be faxed to 801-975-3483, ATTN: Tamera Draper. For technical clarifications, contact Seth Wallace, Forest Service Engineer at 435.636.3533. SOUTH HUGHES CREEK STABILIZATION Ferron District, Manti-La Sal National Forest B.1 SCHEDULE OF ITEMS ITEM Description 151.01 Mobilization 203.01 Removal & Dispose Existing Culvert 204.11 Disposal Area Embankment Construction & Road Reconstruction, Compaction Method C 204.12 Channel Excavation & Backfill: Channel Length as Staked, Approx. 150lf, Sloped 1.5: 1 (H:V), Reshape Slope at Culvert Outlet, and Channel Backfilling 5', Compaction Method C 251.01 Placed Riprap, Class 6 601.01 Grout Riprap Surface Voids 602.01 CMP Culvert Pipe Arch 71" x 42" 12 GA Furnish, Deliver and Install CQ=Contract Quantity, AQ=Actual Quantity PROJECT LOCATION The project is located in the Ferron Ranger District of the Manti-La Sal National Forest, Emery County, State of Utah. The South Hughes Creek Stabilization project is located approximately 24 miles from Huntington, Utah on the east side of State Route 31. PRE-BID SITE VISIT A pre-bid site visit is planned for November 5, 2012 at 1:00 p.m. Interested parties should plan to meet at Hughes Campground, Huntington Canyon. START DATE and CONTRACT TIME The anticipated start date will be 10 days (or as soon as possible) after notice to proceed with 30 calendar days to finish contract performance. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS. (FAR 36.204) The Government Estimate for this Construction Project is: Between $25,000 and $100,000 Amendment #01 - Posted November 7, 2012 This amendment adds notes taken at the Site Visit held on November 5, 2012 as well as adds the Project Specifications (37 pages) there were not included as part of the original solicitation posting. The closing dates for quote submittal has not been extended. Offerors are required to include a signed copy of this Amendment with any quote submitted for this project.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/84N8/AG-84N8-S-13-0002/listing.html)
 
Place of Performance
Address: The project is located in the Ferron Ranger District of the Manti-La Sal National Forest, Emery County, State of Utah. The South Hughes Creek Stabilization project is located approximately 24 miles from Huntington, Utah on the east side of State Route 31., Huntington, Utah, 84528, United States
Zip Code: 84528
 
Record
SN02926083-W 20121109/121107235044-52f4d119aefc7c608d1e91530a25afa8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.