AWARD
Y -- Design and Construction of an Addition and Alteration to an existing Army Reserve Center (ARC) facility located at Fort Wadsworth in Staten Island, New York
- Notice Date
- 3/7/2013
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Louisville, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2230
- ZIP Code
- 40202-2230
- Solicitation Number
- W912QR-13-R-0019
- Response Due
- 1/31/2013
- Archive Date
- 4/6/2013
- Point of Contact
- Sarah Ignacio, 502-315-6174
- E-Mail Address
-
USACE District, Louisville
(sarah.k.ignacio@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912QR-13-C-0009
- Award Date
- 3/6/2013
- Awardee
- MACNAK KORTE DESIGN BUILD LLC (078471693) <br> 2624 112TH ST S STE A1 <br> LAKEWOOD, WA 98499-0000
- Award Amount
- $14,338,486.00
- Line Number
- 0001
- Description
- This project will consist of the Design and Construction of an Addition and Alteration to an existing Army Reserve Center (ARC) facility located at Fort Wadsworth in Staten Island, New York. Primary facilities include an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with heating, ventilating, and air conditioning (HVAC) systems, plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including entry control points, maximum standoff distance from roads, parking areas, and vehicle unloading areas. Maximum stand-off distances may not be obtainable; therefore ATFP hardening of additions may be required. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 101 Tons). The project will contain the following options: 1) Operations and Maintenance Army Reserve (OMAR) Funded Equipment Items; 2) Bona-Fide need - OMAR Funded Equipment Items; 3) Re-Roof Building 208; 4) Re-Roof Building 356; 5) Install Terrazzo floor in lieu of VCT in hallways and assembly hall; 6) Remove current landscaping within unobstructed zone around buildings 208, 209, 356, 358 and replace with ATFP compliant landscaping; and 7) Remove existing asphalt and base as required to install new base and concrete paving in the existing MEP area.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-13-R-0019/listing.html)
- Record
- SN03006728-W 20130309/130307235036-8aede9d009603a2eb3642dc46647a439 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |