SOLICITATION NOTICE
38 -- NV PFH 11-1(5) Kyle & Lee Canyon Roads
- Notice Date
- 6/4/2013
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-13-B-00008
- Point of Contact
- Jason J Longshore, Phone: 7209633354
- E-Mail Address
-
jason.longshore@dot.gov
(jason.longshore@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- Location: Nevada Forest Highway (FH) 11 and 20 are located in Clark County in southern Nevada near Las Vegas. The FH11 route is also designated as State Route 157 (SR-157) and is also known as the Kyle Canyon Road. The FH 20 route is also designated as State Route 156 (SR-156) and is also known as the Lee Canyon Road The Kyle Canyon Road begins at the west end of the route near Cathedral Rock Picnic Area and proceeds easterly 21.25 miles on SR-157 to a junction with US-95 northwest of Las Vegas. This project is between milepost 3.6 to 21.25. The Lee Canyon Road starts at the Las Vegas Ski and Snowboard Resort and proceeds easterly 17.5 miles to SR-156 to the junction with US-95 northwest of Las Vegas. This project is at milepost 1.5. Significant items and quantities: The project will involve three sections of work. The first section is the full reconstruction of the Kyle Canyon Roadway at milepost 4.4 to 5.2 including two roundabouts and a median. The second section involves the construction of a multi-use shoulder from milepost 3.6 to 21.25 (Deer Creek Highway to US-95). The third section involves the construction of a roundabout on Lee Canyon Road at milepost 1.5 (Foxtail and Old Mill facilities). Work will include excavation, drainage, asphalt paving, concrete work, waterline, survey, erosion control, permanent and temporary traffic control, and revegetation. Major approximate quantities include: - 158,000 cubic yards of Excavation - 95,000 tons of Aggregate Base - 27,000 tons of HACP Pavement - 14,000 ton of Open Graded Friction Course - 7,500 square yards of Reinforced Rigid Concrete Pavement - 900 linear feet of Culverts - 12,000 linear feet of Curb and Gutter - 6,700 linear feet of PVC Waterline, 2 inch Work along this route will take place within environmentally sensitive areas and will require interactions with the Forest Service (FS), Nevada Department of Transportation (NDOT), and the travelling public. Traffic control during construction will be very important and will be coordinated with FHWA and NDOT. The FS will also be constructing the Middle Kyle Complex Visitor's Center and the Foxtail/Old Mill recreation sites adjacent to this project during this time period. Close coordination with contractor's from those projects will be necessary. Project will be bid with A+B bidding with a range of 300 to 400 days. Invitation for bid will be posted on or about June 10, 2013. This will be advertised on a unrestricted full and open basis. The anticipated cost range is $15,000,000 to $20,000,000.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-13-B-00008/listing.html)
- Record
- SN03078811-W 20130606/130604235341-d6f69d648c3114a46a6c6a658a9d716c (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |