MODIFICATION
Y -- Seawall Partner's Point, AZ CANCELLED: POSTED UNDER L13PS00581
- Notice Date
- 7/11/2013
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- BLM OC-NOC CONST A&E SEC(OC664)DENVER FEDERAL CENTERBLDG. 50POB 25047DENVERCO80225US
- ZIP Code
- 00000
- Solicitation Number
- L13PS00302
- Response Due
- 6/28/2013
- Archive Date
- 7/28/2013
- Point of Contact
- Jacqueline Carter
- E-Mail Address
-
jecarter@blm.gov
(jecarter@blm.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- CANCELLED: POSTED UNDER L13PS00581 PROJECT DESCRIPTION: The Bureau of Land Management (BLM) requires Design/Build construction contract documents including, specifications, and drawings depicting existing conditions and proposed construction, a finalized construction cost estimate and construction of the approved drawings and specifications for construction of a boat dock/loading/offloading area at Partners Point on Lake Havasu. The work requires furnishing transportation, labor, equipment and materials to design and construct foundations, seawall, retaining wall, and improvements including associated earthwork, erosion control and surface drainage and ramps, railings and security fencing/gate required to provide a safe and functioning area for loading and offloading materials and personnel from boats alongside the shoreline of Lake Havasu in Arizona. The Concept Drawings and Outline Specifications represent a solution which requires furnishing transportation, labor, equipment and materials to design and construct a concrete retaining wall and seawall comprised of interlocking steel sheet-piles along the shoreline of Lake Havasu. This work includes site survey for contours, design planning and development, preparation of specifications and drawings, construction layout, sheet pile installation backfilling and compaction, tie-back anchor installation, concrete slab and decking, temporary and permanent security fencing and gates, concrete retaining wall, pipe railing, concrete caps, erosion control and surface drainage. The project area is approximately 0.2 acres, not including a potential additional stockpile/staging area that is located northerly from the project site, approximately 300 feet away, alongside the project site access road. The work requires design and construction personnel with knowledge of wave action and river flows. LOCATION: Travel 0.26 miles west on Sweetwater Avenue to the BLM Lake Havasu Field Office, which is located at 2610 Sweetwater Avenue, Lake Havasu City, AZ. 86406; thence 1.16 miles south on an unnamed road to the Partners Point work yard.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BLM/NCR/L13PS00302/listing.html)
- Record
- SN03113997-W 20130713/130711235344-dafc43077b794679ea0d2e85f418880b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |