Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 03, 2013 FBO #4270
SOLICITATION NOTICE

J -- Wash Rack Upgrade

Notice Date
8/1/2013
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
333318 — Other Commercial and Service Industry Machinery Manufacturing
 
Contracting Office
Department of the Navy, United States Marine Corps, Marine Corps Base Camp Lejeune - RCO, PO Box 8368, MCB Camp Lejeune, North Carolina, 28547-8368
 
ZIP Code
28547-8368
 
Solicitation Number
M6700113Q2008
 
Archive Date
9/16/2013
 
Point of Contact
Howard D. Bouldin, Phone: 2296396250
 
E-Mail Address
howard.bouldin@usmc.mil
(howard.bouldin@usmc.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
CLASSIFICATION CODE: J- Maintenance, repair & rebuilding of equipment NAICS: 333 - Commercial and Service Industry Machinery Manufacturing / 333318 - Other Commercial and Service Industry Machinery Manufacturing This is a combined solicitation/synopsis for commercial products and services prepared in accordance with FAR 16.603. The Marine Corps Logistics Base, Contracts Dept. Albany, GA has a requirement to upgrade an Wash Rack System, which will include all necessary products, materials and installation services. This will be a Total Small Business Aside. All interested vendors should email their quotes to Howard.Boudlin@usmc.mil not later than September 1, 2013. You must include all contact information, CAGE Code, Tax identification Number and best delivery schedule with your quote. Please address any questions or concerns via email. 1. NSN: N/A 2. DESCRIPTION: Provide all labor and materials necessary for the upgrade and improvement of the High Pressure Wash Rack located at Garrison Mobile Equipment. The upgrade of the Wash Rack System currently in use will consist of the following : Install 1-6 gallon 3,000 PSI hot water pressure washer, natural gas fired Remote start-stop and auto shutdown switch 3 phase 230volt 15hp. pump Install 1-5 gallon 3000 PSI cold water pressure washer, wall mount with auto shutdown 3 phase 230 volt 10hp. pump Remove and install 2 hose reels Install 1 hose trolley kit Install 2 high pressure downstream injectors Replace 2 dual lance wands Remove and install 4 100' high pressure hoses Install 1 foamer Install 1 vent pipe for the hot water washer The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the MCLB Albany/CISD via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil. All on-site work will be performed on MCLB Albany. The contractor shall follow Occupational Safety and Health Administration (OSHA) safety standards. Contractor access onto the base will be during normal duty hours, between 0700 and 1630, Monday through Friday.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/USMC/M67001/M6700113Q2008/listing.html)
 
Place of Performance
Address: Garrison Mobile Equipment, 814 Radford Blvd, Bldg 5400, Albany, Georgia, 31704, United States
Zip Code: 31704
 
Record
SN03135065-W 20130803/130802000353-e549b6dfb2bf077aa4ad85731aaad89e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.