Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 11, 2013 FBO #4309
MODIFICATION

Y -- Artificial Sports Turf - Solicitation 1

Notice Date
9/9/2013
 
Notice Type
Modification/Amendment
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
Department of the Navy, Naval Facilities Engineering Command, NAVFAC Midwest, 201 Decatur Avenue, Building 1A, Great Lakes, Illinois, 60088-5600
 
ZIP Code
60088-5600
 
Solicitation Number
N40083-13-Q-3127
 
Archive Date
10/18/2013
 
Point of Contact
Belinda D Trout, Phone: 847-688-5395 ext 246
 
E-Mail Address
belinda.trout@navy.mil
(belinda.trout@navy.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Wage Determination Base Access Form SF1442 Solicitation A base pass is required for this site visit. Please fill out base application attached and return no later than September 11, 2013 to belinda.trout@navy.mil. The work includes furnishing all labor, transportation, supervision, necessary design, material, and equipment and performing all operations in connection with the Task of installing a synthetic/artificial sports turf over an existing indoor hardwood gym floor. Materials and General Requirements: The following tasks are to be completed to satisfy the requirements of the Contract: 1. General Requirements: Tailor and install a 32 ft X 111 ft synthetic/artificial sports turf product and foam pad over existing hardwood gym floor. Installation to the floor shall be in such a manner that the turf can be removed and reinstalled by owner on an as needed basis. Velcro Seams are preferred; however, alternate methods will be considered. We do not want this product glued to the floor. Minimum characteristics of the product: Fiber: Monofilament Poly Yarn Infill: No Color: Green Pile height: ½" minimum Face Weight: 30oz minimum Foam pad: 4-5mm thickness Warranty: 5 year Gym access from the street is available through double doors. Staging area will be made available upon request to the contracting officer. Scheduling Note: Coordinate any shut down of Equipment of utility outages with Construction Manager at least 15 days in advance.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68950/N40083-13-Q-3127/listing.html)
 
Place of Performance
Address: The work shall be performed at Building 80H, located on 4th St at Naval Station Great Lakes., Great Lakes, Illinois, 60088, United States
Zip Code: 60088
 
Record
SN03180154-W 20130911/130909235531-3e0f394741bd726e4c038b928beb6a87 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.