Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 16, 2013 FBO #4375
MODIFICATION

Z -- This requirement is for all labor, tools, equipment, material, supervision and transportation to prepare surface and apply slurry seal at Fort McCoy, WI in accordance with the scope of work, specifications and drawings.

Notice Date
11/14/2013
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
MICC - Fort McCoy (RC - North), Building 2103, 8th Avenue, Fort McCoy, WI 54656-5153
 
ZIP Code
54656-5153
 
Solicitation Number
W911SA13B0010
 
Response Due
12/31/2013
 
Archive Date
1/30/2014
 
Point of Contact
Melissa Larson, 608-388-5535
 
E-Mail Address
MICC - Fort McCoy (RC - North)
(melissa.larson@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
**11/14/13 Change: The presolicitation number for this requirement has now changed to W911SA-13-B-0001. Please see the new pre-solicitation notice for updated details on this future project.*** Prepare surface and apply slurry seal to all areas indicated on the delivery order documents. The Contractor shall furnish all labor, equipment, material, supplies, signage, traffic control, and other incidentals necessary to provide a Slurry Seal. Slurry Seal shall consist of a mixture of an approved emulsified asphalt, mineral aggregate, water, and specified additives, proportioned, mixed and uniformly spread over a properly prepared asphalt surface. The completed Slurry Seal shall leave a homogeneous mat, adhere firmly to the prepared surface, and have a skid-resistant surface texture throughout its service life. The Contractor shall submit a site-specific safety plan and activity hazard analysis to the Contracting Officer and both shall be approved prior to any work commencing. All work, operations, and activities shall comply with all appropriate OSHA and USACOE EM 385-1-1 regulations and standards pertaining to the type of work being performed. REMOVAL WORK: Remove all items indicated on the drawings and in the specifications and dispose of off post at the Contractor's expense including but not limited to: 1. Removal work associated with patching. NEW WORK: Perform the work under this contract including but not limited to: 1. Clean, route, and seal cracks in asphalt and concrete pavements. 2. Prepare roads, parking lots, and other pavements identified for Slurry Seal. 3. Perform shallow depth and/or full depth pavement patching at locations designated on the delivery order. 4. Install pavement marking, parking lot markings, and paint symbols. REPAIR WORK: Contractor shall repair any damages caused by this construction, including but not limited to: 1. Repair any damaged existing construction or property. 2. Repair any landscaping including trees, shrubs, flowers, and grass. 3. Repair vehicle ruts. Level the ruts, place topsoil, and seed the disturbed areas according to the specifications.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/7d2ef52e7d25eee6844379ab3fe10bb1)
 
Place of Performance
Address: MICC - Fort McCoy (RC - North) 1108 South R St. Fort McCoy WI
Zip Code: 54656-5142
 
Record
SN03233849-W 20131116/131114235735-7d2ef52e7d25eee6844379ab3fe10bb1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.