Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 28, 2015 FBO #4844
SOLICITATION NOTICE

A -- Net Zero Planner Enhancement Synopsis

Notice Date
2/26/2015
 
Notice Type
Presolicitation
 
NAICS
541511 — Custom Computer Programming Services
 
Contracting Office
USACE CERL, Champaign, P O Box 9005, Champaign, IL 61826-9005
 
ZIP Code
61826-9005
 
Solicitation Number
W81EWF-5009-1950
 
Response Due
3/20/2015
 
Archive Date
4/27/2015
 
Point of Contact
Wanda L. Huber, (217) 373-6730
 
E-Mail Address
USACE CERL, Champaign
(wanda.l.huber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Defense installations are required by law - in particular, by the Energy Policy Act of 2005 (EPACT 2005), and the Energy Independence and Security Act of 2007 (EISA 2007) - to eliminate fossil fuel use in new and renovated facilities by 2030 and to reduce overall facility energy usage by 30% by 2015. Army policy is to achieve five (5) Net Zero Energy (NZE) installations by 2020 and twenty-five (25) by 2030. Design of Net Zero Energy installations is a complex undertaking however, that requires an optimal mix of demand reduction, system integration on a community scale, use of renewable sources, and storage technologies. Installation planners lack the ability to analyze and optimize performance of complex non-linear dynamically coupled systems needed to achieve NZE goals in a timely and cost-effective manner. Prior work developed early versions of a Net Zero planning tool (Net Zero Planner) which assists installation planners to develop an optimized path towards a Net Zero Energy installation. This tool needs further development and enhancement to incorporate additional capabilities. This is not a request for proposal and in no way obligates the Government to award any contract. The associated North American Industry Classification System (NAICS) code is 541511 which has a size standard of $27.50M. This is a small business set a-side. Major Requirements: The Contractor shall provide necessary manpower and equipment to accomplish the following six tasks: Task 1: Implement full HVAC system coverage across all models. Task 2: Add four (4) new residential housing facility types. Task 3: Upgrade to most recent version of EnergyPlus. Task 4: Implement comprehensive ASHRAE 90.1-2004 modeling for calculating the EPAct baseline energy consumption. Task 5: Generate EISA baseline source energy use intensity (EUI) reference values for each facility type and climate zone. Task 6: Update documentation and User Guide for Params. Period of Service: All work to be performed under this contract shall be completed not later than three hundred (300) days from contract award. Estimate of when solicitation will be issued: April 16, 2015 Point of Contact (POC): Wanda Huber, Wanda.L.Huber@usace.army.mil, (217) 373-6730. Alternate POC: Andrea Thomas, (217) 373-6746, Andrea.J.Thomas@usace.army.mil.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/330/W81EWF-5009-1950/listing.html)
 
Place of Performance
Address: USACE CERL, Champaign P O Box 9005, Champaign IL
Zip Code: 61826-9005
 
Record
SN03653140-W 20150228/150226234957-4f139b6d52f71733298e35ce55e19572 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.