FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 15, 2015 FBO #5013
MODIFICATION

Y -- Replacement of Wasteway Structures 1 & 2- Ysleta to Fabens levee Reach, El Paso County, TX - Solicitation 1

Notice Date
8/13/2015
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
International Boundary and Water Commission, Acquisition Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
 
ZIP Code
79902
 
Solicitation Number
IBM15B0003
 
Response Due
9/11/2015 1:00:00 PM
 
Archive Date
9/26/2015
 
Point of Contact
Fabiola Palma-Trujillo, Phone: 9158324715
 
E-Mail Address
fabiola.trujillo@ibwc.gov
(fabiola.trujillo@ibwc.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
J.16 WAGE DETERMINATION TX150052 (IBM15B0003) J.15 YSLETA TO FABENS DESIGN DOCUMENT REPORT (IBM15B0003) J.14 TR 03-04 REPORT 2 VI COND ASS IBWC LEVEE (IBM15B0003) J.13 K-2C SLIDING GATES AS-BUILTS FOR INFORMATION (IBM15B0003) J.12 K-2C GEOTECHNICAL LAB RESULTS (IBM15B0003) J.11 K-2C FENCE SOW FOR INFORMATION (IBM15B0003) J.10 K-2C DESIGN ANALYSIS REPORT (IBM15B0003) J.9 IBM15B0003 SPECS J.8 IBM15B0003 RECTIFICATION FINAL EA J.7 IBM15B0003 IBWC WASTEWAYS 1 & 2 FINAL DDR J.6 IBM15B0003 DRAWINGS J.5 FABENS GEOTECH REPORT SUPPLEMENTAL (IBM15B0003) J.4 MINIMUM QUALIFICATION QUESTIONNAIRE_(IBM15B0003) J.3 IBWC FORM 117_(IBM15B0003) J.2 IBWC FORM 116_(IBM15B0003) J.1 IBWC FORM 110_ (IBM15B0003) SOLICITATION IBM15B0003 (SF 1442) THE SOLICITATION IBM15B0003 IS NOW POSTED 8/13/2015. THIS IS A SMALL BUSINESS SET ASIDE. Please reference the SF 1442 and Section L.01 of IBM15B0003 for information on the prebid conference and site visit. Replacement of Wasteway Structures 1 and 2 within the Ysleta to Fabens Levee Reach, El Paso County, Texas General Description of the Work - The work for this project generally consists of removal and replacement of two drainage structures crossing the Rio Grande Levee, reconstruction of adjacent levee sections amounting to a total of 1,250 linear feet (LF), removal and reinstallation of border fence, and reconstruction of four (4) ramps. The project is situated within the levee reach between the Ysleta and Fabens International Ports of Entry in El Paso County, Texas. The work is localized at Wasteways 1 and 2, which are respectively located in Socorro and San Elizario, Texas. Major Construction Tasks -(1) Preparation of right of way (clearing and grubbing); (2) excavation, backfilling, and grading of embankment material; (3) Improvement of existing top of levee to include installation of flexible base; (4) Erosion control; (5) Removal and reinstallation of Department of Homeland Security's border fence; (6) Demolition and reconstruction of two wasteway structures (eight box culverts); (7) Placement and establishment of vegetation for erosion control on the side slopes of the levee (seeding); (8) Installation of temporary retaining structures; and (9) Installation of slide gates and hardware on structures. The proposed work shall be limited by constraints on when construction can occur on the wasteways and constraints on the removal and replacement of border fence. Constraints include working during the non-irrigation season and outside of the migratory bird nesting season, which extends from October 1 to February 28. Due to current hydrologic drought conditions in the Rio Grande Basin, the non-irrigation season may be extended beyond February 28. However, any work between March 1 and September 30 will require additional precautionary activities for compliance with the Federal Migratory Bird Treaty Act. Only work that does not impact on the irrigation system's ability to convey water through the wasteways (i.e. staging, construction/restoration of berms, fences, grounds, vegetation, etc.) may continue into the irrigation season. Proposed construction will affect infrastructure owned by the El Paso County Water Improvement District No. 1 and Department of Homeland Security. Solicitation, plans and specifications are expected to be posted on or about July 2, 2015. All responsible sources may submit a bid which will be considered by the agency. Performance Period - All work shall be completed within three-hundred (300) calendar days. All flood control levee and structure work, excluding maintenance of seeding, shall be completed within, one-hundred eighty (180) calendar days. All maintenance of seeding shall be completed within one-hundred twenty (120) calendar days of completion of all other levee work.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/IBM15B0003/listing.html)
 
Place of Performance
Address: el paso, Texas, United States
 
Record
SN03838535-W 20150815/150814000528-8088904be12eab2112d332c8b9b89415 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.