FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 01, 2015 FBO #5030
AWARD

Z -- Building 499, Repair of RVKD Offices, at Kirtland Air Force Base, NM

Notice Date
8/30/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP-15-T-0126
 
Archive Date
9/29/2015
 
Point of Contact
Glenda Kohlieber, 575-652-4135
 
E-Mail Address
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP-15-P-0082
 
Award Date
8/28/2015
 
Awardee
DESERT SAND BUILDERS, INC. (938102142) <br> 52 BERTA DR <br> EDGEWOOD, NM 87015
 
Award Amount
$125,510.03
 
Line Number
0001
 
Description
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. Demolition a. Abatement of all floors and wall base is required in all areas within scope of work. b. Existing wall steam heat to remain. c. Existing surface mounted phone and LAN port, wire molding and cable to remain. d. Existing power to remain. e. Existing window to remain. Contractor shall protect wood trim finish during duration of construction. f. Contractor shall patch and prep existing wall for new paint. g. Contractor shall remove existing surfaced mounted phone, LAN port, and wire molding. Contractor shall salvage cable for relocation. h. Contractor shall remove existing transition strip. i. Contractor shall remove existing flooring and wall base in their entirety. Contractor shall abate flooring and prep floor for new material as indicated on new floor plan drawing # 2 this sheet. j. Contractor shall remove existing surface mounted wire mold and phone jack in their entirety. Contractor shall remove cable for re-use in same location; refer to drawing # 2 this sheet. k. Contractor shall remove existing surface mounted conduit, electrical duplex, j-box and wire for re-use in same location refer to drawing # 2 this sheet. l. Contractor shall remove existing surface mounted conduit, electrical duplex, and j-box in their entirety. Contractor shall remove wire and salvage for re-location. m. Contractor shall remove existing surface mounted wire mold, phone, and LAN port in their entirety. Contractor shall remove cable for re-use in same location; refer to drawing # 2 this sheet. n. Contractor shall remove existing surface mounted wire mold and LAN port in their entirety. Contractor shall remove cable for re-use in same location; refer to drawing # 2 this sheet. o. Contractor shall remove existing door, frame, header and prep wall for new 1 hour rated 3' x 7' door and frame. p. Existing door and frame to remain. q. Contractor shall remove existing wall covering and prep wall board for new paint surface. r. Existing cased opening to be filled in, refer to drawing # 2 this sheet. s. Contractor shall remove this portion of wall and prep for new framing. Contractor shall be careful not to damage existing wall fabric on corridor side of wall. t. Contractor shall remove existing marker board and salvage to user. u. Contractor shall remove existing ceiling grid, ceiling tiles, HVAC diffusers, heat detectors, and ceiling fan. Contractor shall salvage duct work, ceiling fan, j-box & wiring and heat detectors, j-box and wiring for reuse. v. Contractor shall remove existing light switches, and face plate, existing wiring and j-box to remain, prep for new switch see drawing # 2 this sheet. w. Existing electrical elbows to remain. x. Contractor shall remove existing door header and prep area for new header. y. Contractor shall remove existing light switch, j-box and face plate, contractor shall salvage existing wiring for re-location. Refer to drawing # 2 this sheet for new location. New Construction a. Contractor shall provide and paint wall surfaces (p-1), refer to material schedule on sheet a-101. b. Contractor shall provide and install surface mounted wire molding (color to match wall color), provide and install new surface mounted rj45 three (3) port with two (2) LAN and one (1) new phone,. Contractor shall reuse existing salvaged phone and LAN lines for termination. c. Contractor shall provide and install new surface mounted j-box, conduit with new surface mounted rj45 phone port face plate ; contractor shall reuse existing phone cable for termination, mount at exact same height, patch and paint wall (p-1)where damaged to match, refer to material schedule on sheet a-101. d. Contractor shall provide and install new surface mounted j-box, wire mold, and receptacle with new stainless steel cover plate. Contractor shall re-use existing power wire and circuit. e. Contractor shall provide and install new sheet flooring (sflr-1) refer to materials schedule sheet a-101. f. Contractor shall provide and install new surface mounted j-box, wire mold with new surface mounted rj45 two (2) LAN port face plate; contractor shall reuse existing LAN cable for termination, mount at exact same height, patch and paint wall (p-1) where damaged to match, refer to material schedule on sheet a-101. g. Contractor shall provide and install new 3-5/8 quote mark double header for new one (1) hour rated hollow metal frame and new one (1) hour rated solid core wood door (dr), refer to door schedule sheet a-101. Contractor shall repair wall to match existing conditions. h. Contractor shall provide and install new transition strip, refer to material schedule sheet a-101. i. Contractor shall provide and install new surface mounted j-box, new surface mounted wire mold, new surfaced mounted one (1) phone and two (2) LAN rj45 port face plate, mounted at exact same height; contractor shall re-use existing phone and LAN cables for termination, contractor shall patch and paint wall (p-1) where damaged. j. Contractor shall provide and install one (1) new surface mounted j-box, wire mold and two (2) rj45 LAN port face plate, contractor shall reuse existing LAN cables for termination. Contractor shall patch and paint wall (p-1) where damaged. k. Contractor shall provide and install new, rubber wall base (rb-1), where there is wood base apply over the wood. Contractor shall provide and install new carpet tiles (cpt-1), refer to materials schedule sheet a-101. l. Contractor shall provide and install new surface mounted j-box, wire mold, three (3) port rj45 face plate, one (1) phone port and two (2) LAN ports. Mounted at same height as existing ports. Contractor shall reuse existing cable for new phone and LAN termination. m. Contractor shall provide and install new surface mounted j-box, wire mold and electrical 110/120v duplex, with new stainless steel cover plate. Contractor shall reuse existing wire and circuit. n. Contractor shall provide and install new 3-5/8 quote mark 20 ga. Mtl. Stud. With 3 quote mark sound attenuation insulation up to deck with 5/8 quote mark type quote mark x quote mark gyp. bd. Full height and per ibc one hour construction and ul # u404. Wall board shall be taped floated textured and painted. o. Contractor shall provide and install new supply HVAC diffuser, color to be white. p. Contractor shall attach new diffuser to existing duct work. Contractor shall inspect existing ducting for leaks and repair as required. q. Contractor shall re-wire and remount existing heat detector in location as indicated. r. Contractor shall provide and install new switches, color to be white and stainless steel face plate. s. Contractor shall provide and install new 3-5/8 quote mark dbl. 20 ga. mtl. Stud header for new door. t. Contractor shall cut new ceiling tiles to fit around existing elbows. Contractor shall provide clean smooth cut edges on ceiling tile. u. Contractor shall provide and install new recessed j-box, conduit, new led switch with stainless steel face plate. v. Contractor shall provide and install new 2' x 2' ceiling tile (act-1) and grid (acg-1) refer to materials schedule this sheet. Contractor shall place new ceiling at exact same height as existing. w. Contractor shall provide and install new 2' x 2' led light (led-1) on exis ing circuit, switch as indicated. Refer to lighting schedule this sheet for light type. x. Contractor shall provide and install new return air 2' x 2' egg crate ceiling diffuser, color to be white. y. Contractor shall re-hang existing ceiling fan in location as indicated. z. Contractor shall provide and install new supply HVAC diffuser, color to be white. Contractor shall attach new diffuser to existing duct work. Contractor shall inspect existing ducting for leaks and repair as required. aa. Contractor shall re-wire and remount existing heat detector in location as indicated. bb. Contractor shall provide and install new switches, color to be white and stainless steel face plate. cc. Contractor shall provide and install new 3-5/8 quote mark dbl. 20ga mtl. Stud header for new door. dd. Contractor shall cut new ceiling tiles to fit around existing elbows. Contractor shall provide clean smooth cut edges on ceiling tile. ee. Contractor shall provide and install new recessed j-box, conduit, new led switch with stainless steel face plate.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-15-P-0082.html)
 
Record
SN03862893-W 20150901/150830233315-a5b63e4bdd7f081b36cc22a965cccb3e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.