Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 01, 2015 FBO #5030
AWARD

Z -- Upgrade Annex Net at Building 277 Kirtland Air Force Base, NM

Notice Date
8/30/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP-15-T-0123
 
Archive Date
9/29/2015
 
Point of Contact
Glenda Kohlieber, 575-652-4135
 
E-Mail Address
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP-15-P-0083
 
Award Date
8/28/2015
 
Awardee
ALMS, LIMITED COMPANY (620117833) <br> 11 ESPEJO AVE <br> MORIARTY, NM 87035
 
Award Amount
$149,980.32
 
Line Number
0001
 
Description
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. a. Demolition 1. Contractor shall remove existing door, frame and hardware, as indicated on drawings. 2. Contractor shall remove existing rubber wall base, as indicated on drawings. 3. Contractor shall remove existing comm, as indicated on drawings. b.Construction 1. Contractor shall provide and install new layers of gyp. bd. to existing walls, as indicated on drawings. 2. Contractor shall install new infill wall, as indicated on drawings. 3. Contractor shall provide and install new door, frame and hardware, as indicated on drawings. 4. Contractor shall patch, tape, texture and paint, as indicated on drawings. 5. Contractor shall provide and install new rubber wall base, as indicated on drawings. 6. Contractor shall provide and install new HVAC split system, as indicated on drawings. 7. Contractor shall provide and install sound attenuation insulation above lay-in ceiling, as indicated on drawings. 8. Contractor shall provide and install new comm, as indicated on drawings. 9. Contractor shall provide and install new phone punch down block, as indicated on drawings. 10. Contractor shall provide and install new patch panels, as indicated on drawings.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-15-P-0083.html)
 
Record
SN03862895-W 20150901/150830233316-a9842891df1f32cb3dbd1af81fcaccf8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.