Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 11, 2015 FBO #5040
DOCUMENT

Y -- 632-15-4-5303-0262 | POLICE STORAGE BUILDING AND INSTALLATION 45' X 45' - Attachment

Notice Date
9/9/2015
 
Notice Type
Attachment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs;James J. Peters VA Medical Center;Network Contracting Office 3 (10N3NCO);130 West Kingsbridge Road;Bronx NY 10468-3904
 
ZIP Code
10468-3904
 
Solicitation Number
VA24315R1495
 
Response Due
9/23/2015
 
Archive Date
11/22/2015
 
Point of Contact
Joseph R Ercole
 
E-Mail Address
584-9000
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Police Storage Building at VAMC, Northport, 79 Middleville Road, Northport, NY, 11768. 632-15-3-6107-0128. Contractor shall supply all labor, tools, materials, equipment, supplies and supervision to perform all work for the erection of a Pre-Engineered metal building at the Department of Veterans Affairs Medical Center, 79 Middleville Rd. Northport, NY 11768 Erection of the Pre-Engineered metal building: work includes but not limited to general construction, electrical and mechanical work. The building is forty-five (45) feet by forty-five (45) feet with a 4-12 pitched roof with overhang; 2,025 sq. ft. It shall have two (2) insulated sectional garage type doors with operators. One (1) walk door 3'-0" by 7'-0". It shall be equipped with roof vents, roof insulation, wall insulation, gutters and downspouts. Construction methods and workmanship shall comply with VA requirements; see http://www.cfm.va.gov/til/spec.asp In addition manufacturer's specifications and generally accepted trade practices. Contractor shall remove, cut, alter, replace, patch, and repair existing work as necessary to install new work. Upon completion of contract contractor shall deliver work complete and undamaged. "Brand name or equal" shall be for security system meeting Casey Systems. Materials and equipment accruing from the work of the structure, or part thereof shall become property of the contractor and shall be removed by the contractor from the Medical Center, however any items that are recyclable (copper, steel, etc.) shall be properly disposed by recycling and shall be a credit to the VA government; proof of recycling with waste manifest shall be provided to the VA Contracting Officer. Prior to commencing work, general contractor shall provide proof of OSHA certified "competent person" with a 30-Hour safety certificate (cp)(29CFR 1926.20 (b) and shall maintain a presence at the work site whenever the general or sub-contractors are present and all other employees shall have a 10-Hour safety certificate issued by OSHA or other relevant competency training as determined by the D.V.A.M.C. All tools, materials, and personal property shall be secured at all times. The contractor shall be responsible for safety precautions, including warning signs and barricades during the erection of the Pre-Engineered building and have adequate personnel on hand to insure a safe working environment. The contractor is responsible for all debris and its removal from Government property. Work site shall be cleaned daily. All meetings, inspections and or work schedules must be coordinated and pre-approved prior to commencing by D.V.A.M.C. Representative. The contractor shall examine all of the work as specified to determine the full scope of work prior to any estimate given to the D.V.A.M.C. The proposal shall be in writing, original and one (1) copy. An itemized breakdown (i.e. number of hours by trade, task, and material) and each of the trade/areas listed as separate line items. All work shall be performed in a safe and reliable manner. All work shall be performed as described herein and as specified in the body of the contract documents and conforming to all local, state, federal, and D.V.A.M.C. codes and regulations. All work to be performed at the Department of Veterans Affairs Medical Center 79 Middleville Rd. Northport, New York 11768 It should be noted that this contract does not involve access to VA sensitive information and does not involve access and/or connection to the VA information system. 3. Performance Period: The contractor shall commence work within sixty (60) days following the contract award. Work shall complete within forty-five (45) days of commencement unless delayed by unforeseen circumstances. 4. Type of Contract: Firm-Fixed-Price. 5. Evaluation Criteria: Lowest Price-Technically Acceptable, price factor. 6. Place of Performance: VA Medical Center, 79 Middleville Road, Northport, NY 11768
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BroVANAP/VAMD/VA24315R1495/listing.html)
 
Document(s)
Attachment
 
File Name: VA243-15-R-1495 VA243-15-R-1495_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2307029&FileName=VA243-15-R-1495-001.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2307029&FileName=VA243-15-R-1495-001.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: VAMC Northport NY;79 Middleville Rd.;Northport NY
Zip Code: 11768
 
Record
SN03877312-W 20150911/150909235446-733dc0ccb351f9238482dafdb68c3fc5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.