Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 20, 2015 FBO #5049
AWARD

61 -- Design,manufacture,delivery,installation & testing of hydroelectric digital governor systems & control systems & retrofitted hydroelectric mechanical to digital governor control systems, Jones Bluff & Millers Ferry Powerhouses,AL

Notice Date
9/18/2015
 
Notice Type
Award Notice
 
NAICS
333611 — Turbine and Turbine Generator Set Units Manufacturing
 
Contracting Office
USACE District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-15-R-0058
 
Response Due
8/28/2015 2:00:00 PM
 
Archive Date
10/20/2015
 
Point of Contact
Sophia M Chin, 2516903349
 
E-Mail Address
USACE District, Mobile
(sophia.m.chin@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91278-15-C-0020
 
Award Date
9/18/2015
 
Awardee
L & S ELECTRIC, INC. (053088829) <br> 5101 MESKER ST <br> SCHOFIELD, WI 54476
 
Award Amount
$3,521,686.00
 
Line Number
0001-0004
 
Description
Furnish all design, manufacture, delivery, installation and testing of complete hydroelectric digital governor systems and control systems and retrofitted hydroelectric mechanical to digital governor control systems at Jones Bluff Powerhouse, Selma, AL, and Millers Ferry Powerhouse, Camden, AL. The scope of the work will consist of the Contractor furnishing all supervision, engineering, labor, materials, paint, and equipment to convert and commission existing mechanical or analog governors to digitally controlled governors and to repair and/or modify existing digital governors. Other work included will be integrating existing and new digital and analog inputs and outputs with the existing SCADA and future GDACS (by others) systems, inspection of gate and blade distributing valves, replacement of pump unloaders, replacement of governor air compressors, and providing governor plc control of the oil level inside the accumulators. The governors are controlling hydroelectric turbine generator sets. The contractor shall be responsible for field verifying existing drawings and creating as-built drawings. Work will be performed on all main unit governor systems at Jones Bluff Powerhouse in Selma, AL, and Millers Ferry Powerhouse in Camden, AL, along with optional work at West Point Powerhouse, West Point, GA, and Jim Woodruff Powerhouse in Chattahoochee, FL.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-15-R-0058/listing.html)
 
Record
SN03893045-W 20150920/150918234949-109ef33dfff0fcfed697a7c04f895715 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.