Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 23, 2015 FBO #5052
SOURCES SOUGHT

61 -- Battery, Storage - Market Research Spreadsheet

Notice Date
9/21/2015
 
Notice Type
Sources Sought
 
NAICS
335911 — Storage Battery Manufacturing
 
Contracting Office
Defense Logistics Agency, DLA Acquisition Locations, DLA Land and Maritime, P O Box 3990, Columbus, Ohio, 43218-3990, United States
 
ZIP Code
43218-3990
 
Solicitation Number
SPE7MX-15-R-0145
 
Archive Date
10/13/2015
 
Point of Contact
Pamela R. Baker, Phone: 6146926629
 
E-Mail Address
Pamela.Baker@dla.mil
(Pamela.Baker@dla.mil)
 
Small Business Set-Aside
N/A
 
Description
Market Research Questionnaire Market Research Spreadsheet *** LTC PID Packaging Consolidated Text *** - PLEASE SEE GLOSSARY AT THE END OF THE DOCUMENT FOR FULL TEXT OF THE ITEM DESCRIPTION AND PACKAGING REFERENCE NUMBERS CALLED OUT FOR EACH NSN. NSN:014634470 BATTERY, STORAGE REFERENCE NUMBER:ZD080 REFERENCE NUMBER:ZD071 REFERENCE NUMBER:ZD025 REFERENCE NUMBER:ZD072 SEALED LEAD-ACID, AGM SHELF LIFE TYPE I, 18 MONTHS REFERENCE NUMBER:CQSLK REFERENCE NUMBER:A0003 REFERENCE NUMBER:CS241 REFERENCE NUMBER:CA071 EXCEPTION DATA: ALL BATTERIES SUPPLIED FOR THIS NSN MUST ADHERE TO DIMENSIONS OF 908A, USING ONLY DIMENSIONS SPECIFIED IN SPEC SPEC NEMA-C18.1M PART 1 O.D. DIMENSIONS REQUIRED PER SPEC SPEC NEMA-C18.1M PART 1 AS FOLLOWS: ACCEPTABLE DIMENSIONS:,,,, LENGTH: 2 5/8" (+/- 1/16") WIDTH: 2 5/8" (+/- 1/16") HEIGHT (NOT INCLUDING TERMINALS): 3 13/16" (+/- 1/16") CRITICAL APPLICATION ITEM REMY BATTERY COMPANY, INC. DBA 06LA0 P/N UB5-6S POWER-SONIC CORPORATION, THE 0WJ05 P/N PS-650LS BATTSCO, LLC DBA 5VRN0 P/N UN5-6S PREP FOR DELIVERY LINE ITEM 00001 TYPE OF COVERAGE: DLA DIRECT, CONUS PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999 QUP:001 PRES MTHD:10 CLNG/DRY:1 PRESV MAT:00 WRAP MAT:XX CUSH/DUNN MAT:JC CUSH/DUNN THKNESS:D UNIT CONT:E5 OPI:M INTRMDTE CONT:XX INTRMDTE CONT QTY:XXX PACK CODE:U MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129. SPECIAL MARKING CODE:32 -32 Type I, shelf life PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008 SHELF LIFE TYPE I, 12 MONTHS THIS SHELF LIFE ITEM IS NON-EXTENDABLE, CODE H, WITH A TOTAL SHELF LIFE OF TWELVE MONTHS. MATERIAL FURNISHED UNDER THIS CONTRACT/ORDER SHALL HAVE AT LEAST 85% (10 MONTHS). Package iaw appropirate UN requirements according the applicable mode of transportation. ************************************************************************************************************ GLOSSARY ************************************************************************************************************ PACKAGING TEXT THE FOLLOWING PARAGRAPH APPLIES TO ALL PACKAGING CALLED OUT IN THIS DOCUMENT: ITEM DESCRIPTION TEXT REFERENCE NUMBER ZD080 SAMPLING: IF THE APPLICABLE (OEM OR MILITARY) DRAWING, SPECIFICATION, STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES AN ACCEPTABLE QUALITY LEVEL (AQL), IT MAY BE USED TO ESTABLISH THE AUTHORIZED SAMPLE SIZE. HOWEVER THE SAMPLING ACCEPTANCE NUMBER SHALL BE REDUCED TO ZERO (0). EVEN THOUGH THE ACCEPTANCE LEVEL IS ELIMINATED, THE SAMPLE SIZE REMAINS THE SAME. UNLESS OTHERWISE SPECIFIED IN THE OEM OR MILITARY DRAWING, SPECIFICATION, STANDARD, OR QUALITY ASSURANCE PROVISIONS (QAPs) CHARACTERISTICS CLASSIFIED AS CRITICAL, MAJOR AND MINOR SHALL HAVE AN ASSIGNED AQL OF 0.10, 1.0, AND 4.0 RESPECTIVELY. ASQ H1331 TABLE 1 OR MIL-STD-1916 SHALL TAKE PRECEDENCE OVER MIL-STD-105 AND ASQ Z1.4. THESE PLANS ACCEPT ON ZERO DEFECTS AND REJECT THE ENTIRE LOT ON ONE DEFECT. A ZERO BASED SAMPLING PLAN SHALL BE USED, UNLESS OTHERWISE SPECIFIED BY CONTRACT. REFERENCE NUMBER ZD071 Configuration Change Management - Engineering Change Proposal, Requests for Variance (Deviation or Waiver) February 2015 1. Requirements A. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for Configuration Control of material purchased under this contract. B. Furnished item(s) shall conform to the approved configuration requirements/revision specified, unless a Pre-Production Request for Variance (deviation) or a Post-Production Request for Variance (waiver), is processed and approved as provided by Paragraph 3. in this Standard Text Object (STO). Hereafter, the term #Request for Variance (RFV)# will also include Requests for Deviations and Waivers. 2. The definitions from EIA-649-1 apply to items being procured under this solicitation/contract, with the following clarification of Deviation & Waiver: A. Pre-Production RFV (previously known as deviation) requests permission to produce a product that does not conform to contract requirements/documentation for a limited amount of time and for specified effectivity. (A deviation differs from an engineering change in that an approved engineering change requires corresponding revision of the item's current approved configuration documentation, whereas a deviation does not.). B. Post-Production RFV (previously known as waiver) requests approval of product found during manufacture, or after having been submitted for Government inspection or acceptance, that departs from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 3. Contractor responsibilities. A. An Engineering Change Proposal (ECP) is used to make permanent changes in the Government technical data package (TDP). Pending approval of an ECP, contractual relief should be requested in writing by the Contractor using a RFV. B. Refer to FAR Part 48 Value Engineering for cost saving improvements to the Technical Data Package (TDP). C. All ECPs submitted by the Contractor will be deemed routine. If the Contractor considers an ECP as an emergency or urgent; they shall include in their ECP submittal an explanation and all applicable supporting documentation. All ECPs will be reviewed for a determination on criticality, and, if concurred to be an emergency, the appropriate processing time-frame negotiated with the ESAs will be followed and the Contractor will be notified of anticipated response time. D. For ECPs, Specification Change Notices (SCNs) or RFV, the Contractor must submit the applicable documentation listed in sub-paragraphs D.(1) through D.(4)to the Administrative Contracting Officer(ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV without processing. (1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2 (RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the latest revision of EIA-649-1. (2) DD Form 1692 (current revision) for ECP. (3) DD Form 1694 (current revision) for RFV. (4) DD Form 1695 (current revision) for NOR. 4. DLA#s responsibilities: A. Upon receipt of the ECP or RFV, the PCO will ensure that the applicable product specialist receives the copy from DCMA. B. Within five (5) working days from the date of receipt of the Contractor's ECP or RFV from DCMA, the PS must submit the requests and any supporting documentation via a 339 to the appropriate Engineering Support Activity (ESA), when applicable. C. Routine ECPs will be processed within 90 days from receipt by the ESA. RFVs will be evaluated and processed within 30 days from receipt by the ESA or as negotiated with the ESA. (1) The contractor will be notified in writing of approval by the return of an approved copy of the ECP or RFV. Approval will be reflected by signature of the contracting activity or a review activity specifically identified in the contract. (2) The contractor will be notified in writing of disapproval including reason(s) for disapproval. 5. For an approved RFV or an approved ECP, when the request affects the Contract, a modification will be issued to the contract incorporating the applicable requirement changes. Only a Contracting Officer is authorized to issue a modification incorporating the approved RFV and/or ECP. 6. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. 7. The submission of an ECP or RFV by the Contractor does not affect the required delivery date of the contract. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. 8. The period of time for evaluation and approval/disapproval of an ECP and/or a RFV, as specified in Paragraph 4. C., shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract. (End) REFERENCE NUMBER ZD025 MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS; AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA. PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR MERCURY COMPOUND. (IAW NAVSEA 5100-003D). REFERENCE NUMBER ZD072 Hazard Communication Standard Notice: Effective June 1, 2015, Federal Standard No. 313-E, Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities, establishes the requirement for preparation and submission of Safety Data Sheets (SDS) in lieu of Material Safety Data Sheets (MSDS) by suppliers who provide hazardous materials to government activities. The Occupational Safety and Health Administration (OSHA) has modified its Hazard Communication Standard (HCS) to conform to the United Nations Globally Harmonized System of Classification and Labeling of Chemicals. As a result of this change, GSA revised Federal Standard No. 313-E requiring Safety Data Sheets for classifying chemicals and communicating the applicable information on labels. In accordance with the revised standard after June 1, 2015: 1. Suppliers will be required to submit, to the contracting officer for review and approval prior to award, safety data sheets consistent with the requirements found at 29 C.F.R. 1910.1200 for hazardous materials delivered to the Government. 2. Suppliers will also be required to submit, to the contracting officer for review and approval prior to award, hazardous warning labels in accordance with 29 C.F.R. 1910.1200 for hazardous materials delivered to the Government. 3. Finally, suppliers must train their employees on the new safety data sheets, hazardous warning labels, and requirements of 29 C.F.R. 1910.1200. For more information on SDS, refer to OSHAs website, available at: https://www.osha.gov/dsg/hazcom/ghs-final-rule.html. For information on 29 C.F.R. 1910.1200, refer to the below link: http://www.gpo.gov/fdsys/pkg/CFR-2009-title29-vol6/pdf/CFR-2009-title29- vol6-sec1910-1200.pdf. REFERENCE NUMBER CQSLK THIS SHELF LIFE ITEM IS NON-EXTENDABLE, CODE K,, WITH A TOTAL SHELF LIFE OF EIGHTEEN MONTHS., MATERIAL FURNISHED UNDER THIS CONTRACT/ORDER, SHALL HAVE AT LEAST 85% (15 MONTHS) OF THE SHELF, LIFE REMAINING AT TIME OF DELIVERY., REFERENCE NUMBER A0003 MIL-STD-130N(1) DATED 16 NOV 2012. IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY REFERENCE NUMBER CS241 NOTE: THIS IS A RESTRICTED SOURCE ITEM AND REQUIRES ENGINEERING SOURCE APPROVAL BY THE GOVERNMENT DESIGN CONTROL ACTIVITY. REFERENCE NUMBER CA071 COMMERCIAL OFF THE SHELF ITEM. ADEQUATE CATALOG DATA IS AVAILABLE AT THE PROCUREMENT AGENCY TO EVALUATE ALTERNATE OFFERS.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DLA/J3/DSCC/SPE7MX-15-R-0145/listing.html)
 
Record
SN03897004-W 20150923/150922000333-7dea2247ee84c264b31360bc9f9abdcf (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.