Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 13, 2015 FBO #5133
SOLICITATION NOTICE

Y -- Riley Pass Bluffs F, G, and I Removal Actions

Notice Date
12/11/2015
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Forest Service - R-1 Northern Region
 
ZIP Code
00000
 
Solicitation Number
AG-0343-S-16-0003
 
Archive Date
2/15/2016
 
Point of Contact
Dale R. Reckley, Phone: 406-329-3525
 
E-Mail Address
dreckley@fs.fed.us
(dreckley@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
The Riley Pass Uranium Mine Site (Site) is located in North Cave Hills of the Custer Gallatin National Forest in Harding County, South Dakota. Bluffs F, G and I are located in Township 22 North, Range 5 East, Sections 35 and 36, Black Hills Meridian. The Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota which is approximately 5 miles to the east of the Site. The Site can be accessed by turning west off US Highway 85 onto the Tufte Road, 2 miles north of Ludlow; then turning left on the South Cave (Riley Pass) Road which turns into Forest Service Road (FSR) #3120 at the National Forest boundary. The main access roads to the Site are FSR #3120 and #3130 and also the Welch Fire Trail road just south of Ludlow. A portion of FSR #3130 is closed to public travel. The work under this contract will consist of the excavation of contaminated waste from bluff areas, the placement of excavated wastes into the Bluff I Repository, and the regrading of the repository and spoils material left in place on the sides of the bluffs. Regrading of the spoils will require the use of equipment suited for working on steep slopes. All equipment used for regrading and finishing to final grade must be equipped with GPS receivers configured to work with digital electronic (AutoCAD) files and is a requirement of this contract. The finished grade of the regraded spoils and repository top contains complex topography. The Contractor should be aware of this and should anticipate additional time over that required for more normal regrading and finish grading. All disturbed areas will be covered with a cover system consisting of soil from an on-site borrow source supplemented with compost, fertilized and seeded. The depth of cover soil on the Bluff I repository will be a minimum of 18 inches, while the depth of cover on the remainder of the disturbed areas will be 12 inches. Work also includes development of the on-site borrow source and upon project completion, reclamation of the borrow area which will consist of spreading salvaged topsoil, seeding, fertilizing, placement of erosion control mat and fencing. Weather permitting, a pre-bid tour is scheduled for January 12, 2016 at 10:00 am Mountain Standard Time. Interested contractors shall meet at the Ludlow Community Center on the east side of US Highway 85 behind the Ludlow School. Contractors must sign up to attend the pre-bid tour by sending an email to the contracting officer. If weather does not allow an on-site visit, the tour will be cancelled a minimum of 3 days in advance by posting an announcement on the Federal Business Opportunities website.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/343/AG-0343-S-16-0003/listing.html)
 
Place of Performance
Address: Riley Pass Mine Site, Ludlow, South Dakota, United States
 
Record
SN03967477-W 20151213/151211234028-d859ab2bd106933b3f50a37d804fdfdc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.