Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 25, 2015 FBO #5145
AWARD

Z -- RECONFIGURE GSK JOHNSON HALL RELOCATE CW RESOURCES USCG ACADEMY, NEW LONDON, CT PROJECT #5795873

Notice Date
12/23/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Homeland Security, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit Providence, 475 Kilvert Street Suite 100, Warwick, Rhode Island, 02886-1379, United States
 
ZIP Code
02886-1379
 
Solicitation Number
HSCGG1-16-B-PFA002
 
Archive Date
1/6/2016
 
Point of Contact
Teresa L. Lamphere, Phone: 401-736-1785, Jean M Bretz, Phone: (401)736-1765
 
E-Mail Address
Teresa.L.Lamphere@uscg.mil, JEAN.M.BRETZ@USCG.MIL
(Teresa.L.Lamphere@uscg.mil, JEAN.M.BRETZ@USCG.MIL)
 
Small Business Set-Aside
N/A
 
Award Number
HSCGG1-16-C-PFA002
 
Award Date
12/22/2015
 
Awardee
SARAZIN GENERAL CONTRACTORS INC., 6 COMMERCE DRIVE<br />, NORTH WINDHAM, Connecticut 06256, United States
 
Award Amount
$141,725.00
 
Description
HSCGG1-16-B-PFA002 RECONFIGURE GSK JOHNSON HALL RELOCATE CW RESOURCES, PROJECT #5795873, U.S. COAST GUARD ACADEMY, NEW LONDON, CT Labor, materials, equipment, transportation, supervision and disposal necessary for the removal of the existing electrical receptacles, phone, and data outlet and removal of the existing railing system on the exterior ramp for Johnson Hall. Contractor shall remove, salvage, reconfigure, and reinstall one bay of storage rack, and provide additional storage racks as shown in GSK; provide mezzanine with access stair in CW resources office/work area; relocate and add sprinkler heads as required for revised area plan layout; verify and provide a report that existing pipe sizes and revised layout meet required code or provide hydronic calculations that revised system piping and layout meet code; patch and repair all holes in existing block walls within CW office/work area; extend existing domestic hot and cold water piping and sanitary drain piping into CW area for washer connection; provide new electrical wiring, conduit, receptacles, LED lighting with local switches, split system HVAC fan coil unit with local control for new office/work area and additional items noted on the drawings. The heater coil shall be connected to existing steam system. Contractor shall encapsulate lead based paint on walls, etc. with required primer and prepare and paint all walls with primer and 2 coats of interior latex paint; and provide new painted galvanized steel railing system at existing exterior ramp.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/USCGCEUP/Awards/HSCGG1-16-C-PFA002.html)
 
Record
SN03977489-W 20151225/151223234522-629aca8f33e6d15382519d9a0beb1893 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.