Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 08, 2016 FBO #5280
MODIFICATION

D -- Tier 1 Call Center - Attachment B - Microsoft Word Version

Notice Date
5/6/2016
 
Notice Type
Modification/Amendment
 
NAICS
561422 — Telemarketing Bureaus and Other Contact Centers
 
Contracting Office
Department of the Treasury, Comptroller of the Currency (OCC), Acquisition Management (AQM), 400 7th Street SW, Washington, District of Columbia, 20219, United States
 
ZIP Code
20219
 
Solicitation Number
CC16HQR0015
 
Response Due
5/9/2016 10:00:00 AM
 
Archive Date
5/13/2016
 
Point of Contact
Rodney V. McNeil, Phone: 2026496445, Darryle R Brown,
 
E-Mail Address
rodney.mcneil@occ.treas.gov, darryle.brown@occ.treas.gov
(rodney.mcneil@occ.treas.gov, darryle.brown@occ.treas.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
This is a Microsoft Word file of Attachment B. Attached to this posting is a Microsoft word version of Attachment B, Non-Disclosure Agreement. The word document clarifies a formatting issue in the pdf version of the attachment. Additionally, OCC received the following questions. Answers are provided in bold. 1. Do you know if a wage determination has been assigned to this solicitation? Answer: A wage determination has not been assigned because the OCC does not yet know the location of performance. The wage determination will ultimately be based on the location of the call center. 2. Under 5.4 PROPOSAL INSTRUCTIONS, Volume 1, Tab C, Technical Assumptions, on content table doesn't match with list on 5.4.3 VOLUME 1, TAB C- TECHNICAL CAPABILITY (EVALUATION FACTOR 2). Could the following statement in 6.6.2 TECHNICAL CAPABILITY (EVALUATION FACTOR 2) imply 'Technical Assumptions'?...shall address each functional element in the PWS in enough detail to clearly and fully demonstrate that the Offeror understands the requirements and the inherent challenges and risks. Answer: The above statement does not mean Technical Capability implies Technical Assumptions. However, assumptions that affect the Technical Capability narrative may be documented in the Technical Assumptions section of the response, for clarity purposes. The aforementioned statement refers to performance requirements in section 2.6 of the PWS.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/TREAS/OCC/ASDMS413/CC16HQR0015/listing.html)
 
Record
SN04108817-W 20160508/160506234429-0ee18c3c74af166d4882147aae88e658 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.