Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 22, 2016 FBO #5355
SOLICITATION NOTICE

Y -- CA FTNP YOSE 14(5) & 219(2), South Entrance Wawona Road & Mariposa Grove Road

Notice Date
7/20/2016
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6816B00023
 
Archive Date
10/20/2016
 
Point of Contact
Agnes Rysz, Fax: 7209633360, Joe Wilson, Fax: 7209633360
 
E-Mail Address
CFLCONTRACTS@DOT.GOV, cflcontracts@dot.gov
(CFLCONTRACTS@DOT.GOV, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS AUGUST 4, 2016. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. Project Description: This project will consist of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 2.8 miles of roadway on the CA FTNP YOSE 14(5) & 219(2) project in Yosemite National Park, Mariposa County, California. Work is included on 0.9 miles Wawona Road at the South Entrance, and 1.9 miles of Mariposa Grove Road from the South Entrance to the Lower Grove. The estimated price range is between $ 5,000,000 and $8,000,000. The anticipated advertisement date is July 2016. Construction is anticipated from October 2016 to May 2017. Mariposa Grove Road will remain closed to the public during construction. Principle work items include 10,000 tons of hot asphalt concrete pavement, 8,000 tons of aggregate base, 5,000 cubic yards of roadway excavation, 2,700 cubic yards of subexcavation, 2.7 miles of full depth reclamation (pulverizing), 4,000 square feet of rockery, 3,100 square feet of mechanically stabilized earth wall (with stone masonry facing) and 14,000 feet of concrete curb. Work also includes roundabout construction at the intersection of Wawona Road and Mariposa Grove Road and drainage and site improvements. All of the work is occurring in cultural and natural resource sensitive areas. Construction phasing, temporary traffic control, and timely completion of construction will be very important to minimize disruptions to park visitors throughout construction. Temporary traffic control will need to accommodate vehicles, bicycles, and pedestrians. Construction Duration: Construction is anticipated from October 2016 to May 2017. Mariposa Grove Road will remain closed to the public during construction. The contracting range for this project is $5,000,000.00 to $8,000,000.00
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00023/listing.html)
 
Place of Performance
Address: Yosemite National Park, Groveland, California, 95321, United States
Zip Code: 95321
 
Record
SN04189386-W 20160722/160720234626-67eb28b48e9e154cbff4947af91328f5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.