Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 27, 2016 FBO #5360
MODIFICATION

J -- BIA-DOT-FAS-SVC-INSTALL GUARDRAIL, ANCH

Notice Date
7/25/2016
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
BIA NAVAJO 00009 301 WEST HILL ROOM 346 Contracting Office Gallup NM 87301 US
 
ZIP Code
00000
 
Solicitation Number
A16PS00833
 
Response Due
8/11/2016
 
Archive Date
8/26/2016
 
Point of Contact
Johnson, Mary Jane
 
E-Mail Address
maryjane.johnson@bia.gov
(maryjane.johnson@bia.gov)
 
Small Business Set-Aside
Indian Small Business Economic Enterprises
 
Description
Installation of Guardrails at Cottonwood Arizona, 30 miles west of Chinle Arizona, on the Navajo Nation Reservation. PLEASE NOTE THIS IS A BUY INDIAN SET ASIDE, ONLY BUY INDIAN PROPOSALS WILL BE ACCEPTED. Amendment No.: 0001 is for Solicitation No.: A16PS00833 is as follows: To extend the response date to August 11. 2016 at 12:00 p.m. To respond to questions received: 1. Reference Section B.4 of the ¿Construction Clauses ¿ document on Page 6 of 89. Please provide the Unit Price Schedule referenced in this section. Government Response: Will be provided at a later date. 2. Please provide drawings for this scope of work, including plan locations for the guardrail and details. Government Response: Approved drawings, plans, supplemental specifications etc. can be obtained from the Navajo Region Design Bureau Chief. 3. Please indicate if there are any site-specific modifications to the FP-03 Standard Specifications for this project. Government Response: The only change to be noted is the end treatment, the plans call for 'SKT-350" end terminals. 4. Please confirm that flared out subgrade and asphalt paving at the guardrail end treatment is provided complete by others. Government Response: There is no asphalt paving, all subgrade preparation will be complete prior to installation. 5. Please confirm that all traffic control is provided complete by others. Government Response: Force Account Section does provide all traffic control 6. Please confirm that all survey and layout work is provided complete by others. Government Response: All survey work will be in place per FP-03 requirements 7. Please confirm that the SWPP plan and implementation is provided complete by others. Government Response: SWPPP is in place 8. Please confirm that quality control is provided complete by others. Government Response: Quality Control other then required submittals related to the guard rail materials will be in place. The contractor to supply shop drawings, Certificates of Compliance, etc, to Force Account at least two weeks prior to installation for approval. 9. Reference Section L.8.4 of the ¿Construction Clauses ¿ document on Page 63 of 89. Please confirm that offerors may submit past performance evaluations through the CPARS in lieu of Past Performance Relevancy Questionnaires. Government Response: Questionnaires is preferred, because CPARS is fairly new and does not provide detail reference. 10. Reference Section L.8.4 on Page 63 of 89 and Section M.3.1.2 on Page 69 of 89of the ¿Construction Clauses ¿ document. Please confirm offerors can use references from within the past eight years as stated in Section L.8.4 rather than just within the past three years as stated within Section M.3.1.2. Government Response: Within three years is recommended. 11. Please confirm the page limit of 10 pages described in Section L.8.2.1 does NOT include resumes. Government Response: Provide your resumes add an additional 10 pages. Total pages 20. No more questions will be accepted. Thank you
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/A16PS00833/listing.html)
 
Record
SN04195018-W 20160727/160726000122-2d252715a8063c6b00f346acdfd8c282 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.