SOLICITATION NOTICE
J -- Repl. Water Supply Line, Bldg 8880 BH - W564KV-16-P-0091 Solicitation
- Notice Date
- 8/9/2016
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 221310
— Water Supply and Irrigation Systems
- Contracting Office
- Department of the Army, Army Contracting Command, ECC, 409th CSB (W564KV) TCC-Kaiserslautern, KO DIRECTORATE OF CONTRACTING UNIT 23156, APO AE, Non-U.S., 09227, Germany
- ZIP Code
- 00000
- Solicitation Number
- W564KV-16-T-0091
- Archive Date
- 10/1/2016
- Point of Contact
- Martina C. Honneffer, Phone: 3144835193, Brigitte Bryant, Phone: +49 (0) 631-411-5190
- E-Mail Address
-
martina.c.honneffer.ln@mail.mil, brigitte.f.bryant.civ@mail.mil
(martina.c.honneffer.ln@mail.mil, brigitte.f.bryant.civ@mail.mil)
- Small Business Set-Aside
- N/A
- Description
- Replacement of Water Supply Line near Bldg. No. 8880, Baumholder Military Community Job site for repair of water supply line is located within the Wetzel Kaserne in Baumholder This project includes the replacement of the defective water supply line within the area of Building # 8880, Baumholder Military Community Work comprises the complete earthwork, delivery and installation of piping material, disinfection and pressure test as well as all secondary work required. It is mandatory that all services, as well as all appertaining materials and components, comply with the German general technical provisions for construction services (VOB part C). The use of asbestos-containing material is prohibited. Significantly work requirements are as follows:: - Water supply line within the area of the pipelines shall be manually exposed or exposed by an excavator, exposure directly within the pipeline areas shall be carried out by carefully manual excavation - Pipe trenches shall be sheeted and pit edge be safeguarded - Construction site barriers shall be maintained, traffic lights shall be provided as required - Pump equipment for dewatering the pipe trenches shall be provided and operated - Water supply line shall be replaced - After completion of repair work, excavations shall be backfilled layerwise, be compacted, lacking backfill material shall be supplied - Lawn area shall be cleaned and lawn seed be sown - Broken up trench areas, possibly damaged or removed cable protection, cable marker tapes, sewers, shall be restored to original condition - Lacking materials shall be supplied - Construction site shall be cleaned and materials and site equipment be removed - Inspection
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/a813fddfa67594cfacfa91a2b0a05811)
- Place of Performance
- Address: Wetzel Kaserne, near Bldg. 8880, Baumholder Military Community, USAG Rheinland-Pfalz, Baumholder, Non-U.S., 55774, Germany
- Record
- SN04216080-W 20160811/160809235812-a813fddfa67594cfacfa91a2b0a05811 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |