Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 14, 2016 FBO #5409
SOLICITATION NOTICE

Y -- HI STP H1(1) HALONA STREET BRIDGE

Notice Date
9/12/2016
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6816B00029
 
Archive Date
11/24/2016
 
Point of Contact
Agnes Rysz, Phone: 3039633500, Joseph Wilson, Fax: 7209633360
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS SEPTEMBER 26, 2016. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. The Halona Street Bridge project is located on Halona Street, M.P. 20.21, adjacent to the Interstate Route H-1 on ramp from Vineyard Boulevard, on the island of Oahu, Hawaii. Work consists of demolition and reconstruction of the Halona Street Bridge and roadway approaches. The replacement bridge consists of a three-span structure with a total length of approximately 131 feet, and a deck width of 39 feet. New Geosynthetic Reinforced Soil-Integrated Bridge System ( GRS-IBS) abutments will be constructed behind the existing abutments, and the existing bridge piers will be removed and replaced with new bridge piers founded on driven, pre-cast/pre-stressed piles. The superstructure consists of pre-cast / pre-stressed slab girders with a cast in place concrete deck, sidewalk and bridge railing. Additional incidental work includes but is not limited to survey and staking, placement of aggregate base, asphalt paving, utility relocations (overhead lighting, waterline, gas, and storm sewer), cofferdam construction and dewatering, erosion control, contractor quality control and testing, structural excavation, shoring and bracing, and permanent and temporary traffic management. Construction Duration: Construction is anticipated from late November. The contracting range for this project is $4 to $7 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00029/listing.html)
 
Place of Performance
Address: Island of Oahu, Hawaii, 96817, United States
Zip Code: 96817
 
Record
SN04267426-W 20160914/160912235454-22c289b10d57af77cf226b03d1f68af5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.