Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 01, 2016 FBO #5426
AWARD

Z -- Renovate Barracks 267, Fort Irwin, CA

Notice Date
9/29/2016
 
Notice Type
Award Notice
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Los Angeles, 915 Wilshire Blvd, Suite 930, Los Angeles, California, 90017-3401, United States
 
ZIP Code
90017-3401
 
Solicitation Number
W912PL-16-R-0064
 
Archive Date
10/13/2016
 
Point of Contact
Lucia A. Carvajal, Phone: 2134523240
 
E-Mail Address
lucia.a.carvajal@usace.army.mil
(lucia.a.carvajal@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PL-16-C-0038
 
Award Date
9/28/2016
 
Awardee
MTM Builders, Inc., 1480 Frontage Road, Chula Vista, California 91911, United States
 
Award Amount
$4,637,146.00
 
Line Number
0001-0002
 
Description
Barracks 267 will be upgraded to meet current building codes and standards. Barracks 267 is a 3 story building. It is a CMU building with a stucco finish that is deteriorated, and needs to be removed and shall be covered with a new EIFS wall system. Current interior finishes are dated and worn, and need to be remodeled, including windows to meet ATFP, new paint, new ceiling, new floor finish (epoxy matrix), new plumbing, vanities as well as replace finishes in bathroom and some fixtures. All power and lighting within the building envelope will be demolished and replaced. Existing lighting is antiquated and in varying states of functionality as well as existing power receptacles and will need upgrading. Main service equipment is undersized. A new Fire Alarm/Mass Notification System was installed in 2013. The existing system will be protected in place with minimal modifications to integrate with the new Fire protection (suppression) system to be installed under this project including underground utilities. The contractor will be responsible for the system components five feet and greater from the building. This includes coordination, connection to the distribution main, cathodic protection requirements, supervised post indicating valve, hydrant spacing, and backflow preventer. Sleeping Unit rooms are heated and cooled by individual two pipe fan coil units which will need upgrading.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA09/Awards/W912PL-16-C-0038.html)
 
Record
SN04292204-W 20161001/160929234700-1a7073d00c4484b10e37062e878d28a1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.