FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 19, 2016 FBO #5475
MODIFICATION

J -- WATER TREATMENT SYSTEMS

Notice Date
11/17/2016
 
Notice Type
Modification/Amendment
 
NAICS
221310 — Water Supply and Irrigation Systems
 
Contracting Office
Department of the Army, Army Contracting Command, MICC, MICC - Yuma Proving Ground, ATTN: CCMI-CHD-YP, Bldg 2364, 301 C Street, Yuma, Arizona, 85365-9498, United States
 
ZIP Code
85365-9498
 
Solicitation Number
W9124R-17-T-0001
 
Archive Date
12/3/2016
 
Point of Contact
Karen F. Davis, Phone: 9283286124, Tejae Craig, Phone: 9283286903
 
E-Mail Address
karen.f.davis.civ@mail.mil, tejae.craig.civ@mail.mil
(karen.f.davis.civ@mail.mil, tejae.craig.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment 0005 - is to add the following Questions and Answers: 1) There appears to be changes in this RFP from the previous contract, most importantly that Purchase Requests (PR) for supplies, chemicals, etc. Are to be included in our proposal cost and not be reimbursable, please confirm that this is correct. This is correct. Technical Exhibit 3 provides estimate costs averaged for historical data concerning operations, maintenance and repair costs. 2) Will the service orders (SO) be reimbursed to the contractor or will the contractor have to assume the cost risk for repairs to the treatment plants? This is a Firm Fixed Price contract. All cost associated with the daily operations, maintenance and repairs of the Water Plants, associated equipment and RO's are the contractor's responsibility as outlined in the PWS. DPW will be responsible for repairs to items such as structural (building components not associated with the water processing equipment), grounds (such as berm erosion, brine pond liners) to name a few. 3) The Purchase Requests (PR) costs listed on Technical Exhibit 3 appear to be considerably low, can you please confirm that these are actually costs? Technical Exhibit 3 has been updated to reflect current PR and SO expenditures. 4) Who handles the compliance sampling? DPW Environmental Division 5) Will we be billing a single lump sum cost with 4 option years to include materials costs in Exhibit 3? Yes, all labor and materials need to be included under the CLIN for Operations and Maintenance. (Technical Exhibit 3 has been updated to reflect current/updated PR and SO expenditures.) 6) Will contractor be responsible for catastrophic failure of major equipment items not covered by Exhibit 3 values? Natural catastrophic failures, such as fire, electrical surge, and storm and so on, not caused by contractor negligence will be the responsibility of DPW. Catastrophic failure of any level if determine to be caused by contractors negligence will be deemed the contractor fault and responsibility. 7) Who is responsible for brine paid liner repairs? Have historic repairs been repaired? All three brine ponds, KFR, WCA and HCA, have had issues with the liners tearing and have been repaired at DPW expense. We have an existing tear at the HCA brine pond on the North West corner which will require the brine pond to be drained by Water Plant operators divert water flow, DPW will then coordinate sludge removal and liner repair.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/85eb63bcf849a2d246b814bbeb65a2f7)
 
Place of Performance
Address: U.S. Army Yuma Proving Ground, AZ, Yuma, Arizona, 85365, United States
Zip Code: 85365
 
Record
SN04330441-W 20161119/161117233954-85eb63bcf849a2d246b814bbeb65a2f7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.