DOCUMENT
99 -- VA786-17-0154 | Massachusetts NC, | For: Non-Hazardous Waste Removal Services. | Previous contract VA786-12-C-0112 (NEIE Medical Waste Services, LLC) - Attachment
- Notice Date
- 1/5/2017
- Notice Type
- Attachment
- NAICS
- 562111
— Solid Waste Collection
- Contracting Office
- Department of Veterans Affairs;NCA Contracting Service;75 Barrett Heights Rd. Suite 309;Stafford VA 22556
- ZIP Code
- 22556
- Solicitation Number
- VA78617R0154
- Response Due
- 1/23/2017
- Archive Date
- 2/22/2017
- Point of Contact
- Eric.Washington@va.gov
- E-Mail Address
-
Eric.Washington@va.gov
(Eric.Washington@va.gov)
- Small Business Set-Aside
- Service-Disabled Veteran-Owned Small Business
- Description
- SUPPLIES OR SERVICES & PRICES / COSTS PRICE SCHEDULE: The Contractor shall furnish (F.O.B. Destination within consignee s premises) all personnel, equipment, supplies, materials, vehicles and other items / services necessary and incident to the provision NON-HAZARDOUS WASTE (TRASH) COLLECTION & REMOVAL SERVICES at the Massachusetts National Cemetery, Off Connery Avenue, Bourne, MA 02532. Services shall be provided on a weekly scheduled and as needed / as requested basis. SITE VISIT: Offerors or quoters are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. If you plan to conduct a site visit / inspection of the Massachusetts National Cemetery, YOU MUST CONTACT one of the following personnel to make arrangements: John Spruyt, Cemetery Director................................................... (508) 563-7113 Theresa Souza, Program Assistant. (508) 563-7113 FAX.............................................................................................. (508) 563-3702 Duration: The term of the contract January 2017 (or date of award whichever is sooner) thru September 30, 2017 with four (4) one year renewal options. Type of Contract: This is a firm-fixed price type contract for the supplies / services specified and effective for the period stated in the Schedule. The unit price is all-inclusive and covers complete trash removal per line item. Quantities of services specified in the Price Schedule are estimates only and are not purchased by this contract. Evaluated via FAR 15.101-2 Lowest Price Technically Acceptable (LPTA) Rates: If the landfill used by the Contractor for disposal of waste / trash picked-up under this contract adjusts its tonnage fee for disposal, that fact shall not constitute the basis for an equitable price adjustment. Base Year: January 2017 or From Date of Award thru September 30, 2017 CLIN DESCRIPTION EST QTY UNIT UNIT COST TOTAL EST COST 0001 One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area. Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year). MO 12 $ _________ $ ___________ 0002 Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area. MO 12 $ _________ $ ___________ 0003 Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 0002 above. Services to be provided on an On-Call as-needed basis. EA 12 $ _________ $ ___________ 0004 Landfill Tonnage Fee to empty Container in CLIN 0002 above (estimated @ 36 tons for Base Year Period). TON 36 $ _________ $ ___________ 0005 Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America 2 Ea. $ _________ $ ___________ GRAND TOTAL ESTIMATED COST: $___________ Option Year I: October 1, 2017 thru September 30, 2018 CLIN DESCRIPTION EST QTY UNIT UNIT COST TOTAL EST COST 1001 One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area. Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year). MO 12 $ _________ $ ___________ 1002 Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area. MO 12 $ _________ $ ___________ 1003 Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 1002 above. Services to be provided on an On-Call as-needed basis. EA 12 $ _________ $ ___________ 1004 Landfill Tonnage Fee to empty Container in CLIN 1002 above (estimated @ 36 tons per year). TON 36 $ _________ $ ___________ 1005 Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America 2 Ea. $ _________ $ ___________ GRAND TOTAL ESTIMATED COST: $___________ Option Year II: October 1, 2018 thru September 30, 2019 CLIN DESCRIPTION EST QTY UNIT UNIT COST TOTAL EST COST 2001 One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area. Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year). MO 12 $ _________ $ ___________ 2002 Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area. MO 12 $ _________ $ ___________ 2003 Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 2002 above. Services to be provided on an On-Call as-needed basis. EA 12 $ _________ $ ___________ 2004 Landfill Tonnage Fee to empty Container in CLIN 2002 above (estimated @ 36 tons per year). TON 36 $ _________ $ ___________ 2005 Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America 2 Ea. $ _________ $ ___________ GRAND TOTAL ESTIMATED COST: $___________ Option Year III: October 1, 2019 thru September 30, 2020 CLIN DESCRIPTION EST QTY UNIT UNIT COST TOTAL EST COST 3001 One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area. Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year). MO 12 $ _________ $ ___________ 3002 Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area. MO 12 $ _________ $ ___________ 3003 Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 3002 above. Services to be provided on an On-Call as-needed basis. EA 12 $ _________ $ ___________ 3004 Landfill Tonnage Fee to empty Container in CLIN 3002 above (estimated @ 36 tons per year). TON 36 $ _________ $ ___________ 3005 Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America 2 Ea. $ _________ $ ___________ GRAND TOTAL ESTIMATED COST: $___________ Option Year IV: October 1, 2020 thru September 30, 2021 CLIN DESCRIPTION EST QTY UNIT UNIT COST TOTAL EST COST 4001 One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area. Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year). MO 12 $ _________ $ ___________ 4002 Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area. MO 12 $ _________ $ ___________ 4003 Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 4002 above. Services to be provided on an On-Call as-needed basis. EA 12 $ _________ $ ___________ 4004 Landfill Tonnage Fee to empty Container in CLIN 4002 above (estimated @ 36 tons per year). TON 36 $ _________ $ ___________ 4005 Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America 2 Ea. $ _________ $ ___________ GRAND TOTAL ESTIMATED COST: $___________ (End of Price Schedule)
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VANCA/VANCA/VA78617R0154/listing.html)
- Document(s)
- Attachment
- File Name: VA786-17-R-0154 VA786-17-R-0154_2.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3196299&FileName=VA786-17-R-0154-000.docx)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3196299&FileName=VA786-17-R-0154-000.docx
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: VA786-17-R-0154 VA786-17-R-0154_2.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3196299&FileName=VA786-17-R-0154-000.docx)
- Place of Performance
- Address: Massachusetts National Cemetery;Off Connery Avenue;Bourne, MA 02532.
- Zip Code: 02532
- Zip Code: 02532
- Record
- SN04364045-W 20170107/170105234136-07ce2e0f8829e153691c3080b56216d8 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |