Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 26, 2017 FBO #5602
SOLICITATION NOTICE

F -- 2017 Inyo Fuels Reduction, Inyo National Forest

Notice Date
3/24/2017
 
Notice Type
Presolicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
Department of Agriculture, Forest Service, R-5, Central CA Acquisitions Service Area, Tahoe N.F., 631 Coyote Street, Nevada City, California, 95959-2250, United States
 
ZIP Code
95959-2250
 
Solicitation Number
AG-9JGP-S-17-0043
 
Archive Date
6/9/2017
 
Point of Contact
Raymond Garleb, Phone: 5304786162
 
E-Mail Address
rgarleb@fs.fed.us
(rgarleb@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Description of Work: The intent of this contract is to secure timber stand improvement (pre-commercial thinning) and fuels reduction (thinning or piling/covering piles or brush cutting or a combination there of), services on the Inyo National Forest, CA. Contractor Responsibility: The Contractor shall provide everything--including, but not limited to, all equipment, supplies, transportation, labor, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/9A63/AG-9JGP-S-17-0043/listing.html)
 
Place of Performance
Address: Location: Projects will be located within the boundaries of the Inyo National Forest, CA, on Mono Lake and Mammoth Ranger Districts., Description: The project areas are generally identifiable by changes in vegetation, roads, flagging, or through geographical information systems (GIS) data. The boundaries can be adjacent timber stands, recent harvest units, or other natural or manmade features that clearly define the boundary as noted on the project area maps. In most cases the interior and exterior boundaries of the project areas will be flagged with red or blue flagging or otherwise described below or by Contracting Officer’s Representative (from now on COR). If there is any discrepancy on the boundaries of individual work areas within units the COR must be contacted as soon as possible and no more work must take place until the discrepancy is resolved., Exclusions (non-work areas): Control areas, if present; and limitations on work performed will be noted in C.5 Restrictions on Work and delineated on the ground by orange and white candy cane flagging on the boundaries and/or pink tags stapled on vegetation at breast height facing away from the site., Accessibility: Access routes are shown on the project area maps. The project areas can and will be accessed from established highways and Forest system roads. Work vehicles and equipment will be parked on Forest Service land unless prior arrangements have been made by the Contracting Officer. In most cases project areas will be accessible by 2WD; however, some terrain may necessitate the use of a four-wheel drive, high-clearance vehicle., Mono Lake, California, United States
 
Record
SN04447181-W 20170326/170324234703-337c7fa6ddf39eff4551bbd1d2d2b907 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.