Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 30, 2017 FBO #5728
SOLICITATION NOTICE

83 -- Labor and Material for Tents to be Placed in Various Locations in Support of United Nations General Assembly 72 - RFQ

Notice Date
7/28/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
532299 — All Other Consumer Goods Rental
 
Contracting Office
Department of Homeland Security, United States Secret Service, Procurement Division, 245 MURRAY LANE SW, BLDG T-5, WASHINGTON, District of Columbia, 20223, United States
 
ZIP Code
20223
 
Solicitation Number
HSSS-17-Q-0248
 
Archive Date
8/18/2017
 
Point of Contact
Jane Paek, Phone: 2024069762
 
E-Mail Address
jane.paek@associates.usss.dhs.gov
(jane.paek@associates.usss.dhs.gov)
 
Small Business Set-Aside
N/A
 
Description
Labor and Materials for Tents in Support of United Nations General Assembly 72 (UNGA 72) - New York, NY Scope of Work Purpose: The Secret Service is in need of tents to lease on a temporary basis to support the United Nations General Assembly in New York, New York. Contractor is to furnish tents and labor to install at locations and time frames as stated below. Locations and Quantities are subject to change. Time frames are approximate and are subject to change. Further information will be given on actual locations and point of contact closer to the event. 1) 44th St. between 2 nd & 3 rd Ave POC: TBD Setup approximately 170' west of 2nd Avenue Purpose: Vehicle check point - Services UN perimeter Install by 04:00 AM on 9/18/2017 Remove by 06:00 PM on 9/23/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones 2) 49 th & 3 rd POC: TBD Purpose: Vehicle check point - Services the Waldorf, Palace, and Intercon Install by 04:00 AM on 9/18/2017 Remove by 06:00 PM on 9/25/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones 3) U.N. Garage at 48 th Street POC: TBD Purpose: Vehicle check point- Services UN perimeter Install by 04:00 AM on 9/18/2017 Remove by 06:00 PM on 9/23/2017 1 - 20ft X 40ft Engineered Kedered Frame Tent with 10' Tall Leg (preferably Anchor Navitrac, Olympic, or Comparable) 4 - 9ft X 20ft solid white walls 12 - 800lb cement weight stacks 2 - Halogen light with 50ft cords 12 - chairs 10 - Black Garbage Bags 1 - Power Strip 4) FDR Service Road - Between 48th& 49th POC: Myron Wade @ 646-265-9852 Purpose: Vehicle check point - Services UN perimeter Install by 04:00 AM on 9/18/2017 Remove by 06:00 PM on 9/23/2017 1 - 20ft X 40ft tent (10ft Tall Leg) (preferably Anchor Navitrac, Olympic or Comparable) Covering one lane 2 - 9ft X 40ft solid white walls 12 - 800lb cement blocks 2 - halogen light with 50ft cords 20 - chairs 10 - Black Garbage Bags 1 - Power Strip 5) 41 st St. between 1 st Avenue & FDR POC: TBD Purpose: Vehicle check point - Services UN perimeter and Motorcades Install 02:00 AM - 04:00 AM on 9/17/2017 Remove 12:00 PM - 02:00 PM on 9/25/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones 6) 7 th Ave. Between 54 th & 55 th (East side of 7 th Avenue mid-block) POC: TBD Purpose: Vehicle check point - Services the London Hotel Install 02:00 AM - 04:00 AM on 9/20/2017 Remove 01:00 PM - 03:00 PM on 9/25/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones 7) 6 th Ave. Between 54 th & 55 th (West side of 6 th Avenue mid-block) POC: TBD Purpose: Vehicle check point - Services the London/Peninsula Hotel Install 02:00 AM - 04:00 AM on 9/19/2017 Remove 01:00 PM - 03:00 PM on 9/25/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones 8) JFK Airport : A POC: TBD Install by 05:00 PM 09/12/2017 Remove at 10:00 AM 09/26/2017 1- 30ft X 30ft heavy duty kedered frame tent (with Clear top) with 10' Tall Leg (preferably Anchor Navitrac, Olympic or Comparable) 2 - 10ft X 30ft walls 12 - 800 lb cement weight stacks 9) JFK Airport : B POC: TBD Install by 05:00 PM 09/12/2017 Remove at 10:00 AM 09/26/2017 1- 30ft X 30ft heavy duty kedered frame tent (with Clear top) with 10' Tall Leg (preferably Anchor Navitrac, Olympic or Comparable) 2 - 10ft X 30ft walls 12 - 800 lb cement weight stacks 10) Sheraton 53 rd Street, Setup between 6 th and 7 th POC: TBD Install 05:00 PM - 07:00 AM on 09/18/2017 Remove at 12:01 AM on 09/22/2017 1 - 8ft X 25ft tent with 8' Leg Height 2 - 8ft X 25ft solid white sidewalls (with 15' sliding portion) 6 - 300lb cement blocks 1 - halogen light with 50ft cord 11) NY Palace - 455 Madison Avenue & 51 st Street POC: TBD Hotel Entrance: X-Ray Tent Install at 01:30 AM - 4:00 AM on 09/18/2017 Remove at 12:01 AM - 4:00 AM on 09/24/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - halogen light with 50ft cord 8 - chairs 2 - Pipe cross beams 4 - Pipe uprights 4 - Pipe base plates 6 - 10' x 5' Velour Drapes 12) NY Palace, 50 th St, Between Park Avenue & Madison Avenue POC: TBD Hotel Entrance: X-Ray Tent Install at 01:30 AM - 4:00 AM on 09/18/2017 Remove at 12:01 AM - 4:00 AM on 09/24/2017 1 - 4ft X 25ft Frame Tent 1 - 10ft X 20ft sliding white wall 1 - Additional vinyl to fill in around tent to sides of building 6 - 300lb Cement Blocks 13) NY Palace, 455 Madison Avenue Between trees in courtyard POC: TBD Hotel Entrance: X-Ray Tent Install at 01:30 AM - 4:00 AM on 09/18/2017 Remove at 12:01 AM - 4:00 AM on 09/24/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - halogen light with 50ft cord 8 - chairs 14) UNSG Residence, 3 Sutton Place China Premier Visit POC: TBD Install at 04:00 PM - 06:00 PM on 09/19/2017 Remove at 10:00 PM - 11:30 PM on 09/19/2017 1 - 10ft X 15ft x 10" Leg Height Frame Tent 2 - 15ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Battery Powered Light 15) Peninsula hotel, 700 5th Avenue Employee entrance on south side of W. 55th street, just west of 5th Avenue Turkey Visit POC: TBD Install at 05:00 AM - 07:00 AM on 09/19/2017 Remove at 06:00 AM - 08:00 AM on 09/23/2017 1 - 10ft X 10ft x 10" Leg Height Frame Tent 2 - 10ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Battery Powered Light 16) Turkey Park Ave Turkey Visit POC: TBD Install at 11:00 AM - 01:00 PM on 09/22/2017 Remove at 04:00 PM - 06:00 PM on 09/22/2017 1 - 6ft X 10ft x 10' Leg Height Frame Tent 2 - 10ft X 10ft solid white walls 4 - 300lb cement blocks 17) Israeli Prime Minster Richard Rogers Theater Richard Rogers Theater - Setup 46th Bet 7th & 8th POC: TBD Install at 02:30 PM - 04:00 PM on 09/24/2017 Remove at 11:30 PM - 01:00 AM on 09/24/2017 1 - 10ft X 10ft x 10" Leg Height Frame Tent 2 - 10ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Battery Powered Light 2 - 10' Pipe and Drape Sections 18) Pop Up Request 1 POC - TBD Install at 12:00 AM on 09/26/2017 Remove by 08:00 PM 09/30/2017 1 - 10' X 10' Pop Up 4 - Sand Bags 19) Pop Up Request 2 POC - TBD Install at 12:00 AM on 09/26/2017 Remove by 08:00 PM 09/30/2017 1 - 10' X 10' Pop Up 4 - Sand Bags 20) Pop Up Request 3 POC - TBD Install at 12:00 AM on 09/26/2017 Remove by 08:00 PM 09/30/2017 1 - 10' X 10' Pop Up 4 - Sand Bags 21) Pop Up Request 4 POC - TBD Install at 12:00 AM on 09/26/2017 Remove by 08:00 PM 09/30/2017 1 - 10' X 10' Pop Up 4 - Sand Bags 22) Pop up requirement 5 POC: TBD Install by 06:00 AM on 9/25/2017 Remove by 06:00 PM on 9/26/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones 23) Pop up requirement 6 POC: TBD Install by 06:00 AM on 9/25/2017 Remove by 06:00 PM on 9/26/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones 24) Pop up requirement 7 POC: TBD Install by 06:00 AM on 9/25/2017 Remove by 06:00 PM on 9/26/2017 1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy) 3 - 9ft X 10ft solid white walls 4 - 300lb cement blocks 1 - Halogen light with 50ft cord 8 - Chairs 10 - Black Garbage Bags 1 - Power Strip 6 - Orange Safety Cones Site Visit: A site visit can be arranged if required. Contractor Screening: The selected contractor will be required to provide the following information about the contractor's employees and subcontractors who may have direct or incidental access to information being provided by the U.S. Secret Service: a) Employee's full name; b) Employee's date and place of birth; c) Employee's social security number; and d) Employee's race and sex. The U.S. Secret Service will conduct a background check of all named personnel. The results of these checks will be used solely by the U.S. Secret Service in evaluating personnel. USSS Points of Contact : Joe Blevins Office 202-406-5884, Cell 202-355-3313 email - Joseph.Blevins@usss.dhs.gov VENDORS MUST BE ABLE TO WORK 24/7 DURING PEAK PERIODS OF MISSION OPERATIONS
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USSS/PDDC20229/HSSS-17-Q-0248/listing.html)
 
Place of Performance
Address: New York, NY, United States
 
Record
SN04603462-W 20170730/170728232530-b1d752e880fe6676602d3619f1f9c8cf (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.