Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 29, 2017 FBO #5789
AWARD

Z -- DTRA Bldg. 20676 Motion Detectors

Notice Date
9/27/2017
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP17T0104
 
Archive Date
10/11/2017
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP17P0097
 
Award Date
9/26/2017
 
Awardee
Unified Contractor Inc., 609 Broadway Blvd. NE Suite 228, Albuquerque, New Mexico 87102, United States
 
Award Amount
$149088.43
 
Line Number
0001
 
Description
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20676 Motion Detector, Fiber Drops and Paint. 2. SPECIFIC REQUIREMENTS: a.Contractor shall install 22 new fiber SIPR Drops in the locations identified in the drawing. Fiber to be 4 strand OM3 50um to each location with LC connectors. b.New fiber shall be Red c.All old, unused wiring shall be left in place. d.Contractor shall install 8 new motion detectors in the locations identified in the drawing. e.Contractor shall create a new zone for each detector. f.Contractor shall run new power to each motion detector. Install (1) ea 48strand OM3 50um fiber optic cable in inner duct from Room 120 to upstairs work area. Terminate with LC connectors and land in new fiber shelves. g.Install (1) 48 strand OM3 50um fiber optic cable from the SIPR safe to the existing cabinet in Room 120. Terminate with LC connectors and land in new fiber shelves. h.Install a new slim line wall cabinet for termination passive fiber optic equipment in the upstairs work area. i.Provide an additive/alternate price to install an additional (1) 48 strand OM3 50um fiber optic cable from the SIPR safe to the existing cabinet in Room 120. Terminate with LC connectors and land in new fiber shelves. j.Provide 1 meter patch cords for each fiber pair in both the upstairs wall cabinet and the existing cabinet in Room 120. k.Provide 3 meter patch cords for each work area outlet location. l.Contractor shall refinish the floor in room 137 with epoxy paint coating as shown on the drawing. m.Contractor shall prep the floor area and provide a smooth surface n.Contractor shall remove the existing vinyl cove base on the perimeter of the room o.Contractor shall install new vinyl cove base on the perimeter of the room. p.Contractor shall remove the welds from the inside of the existing door to allow the door to become usable. q.Contractor shall replace the door hardware and install the new hardware currently used in DTRA facilities.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP17P0097.html)
 
Record
SN04697461-W 20170929/170927232616-08a40b43000df6985d56f076e94a64b6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.