SOLICITATION NOTICE
Y -- AZ FTNP GRCA 11(4), Desert View Drive
- Notice Date
- 10/10/2017
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH6817B00017
- Point of Contact
- Ryan Phillips, , Joe Wilson,
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- AZ FTNP GRCA 11(4) Desert View Drive Synopsis: Location: Grand Canyon National Park South Rim County: Coconino, Arizona Set-aside: Full and open PROJECT DETAILS: This project in includes reconstruction of 7.47 miles of Desert View Drive, 1.1 miles of Yaki Point and Kaibab Trail Access Road, 3.59 South Entrance Road, 1.17 Village Loop Drive in Grand Canyon National Park. Type of Construction: subgrade grading, concrete paving, concrete curb, CMP culverts, concrete headwalls, and riprap, aggregate base course, asphalt pulverizing and paving, traffic control, public information. This project consists of: Schedule A: Phased Construction of 7.47 miles of Desert View Drive roadway reconstruction and paving. Significant Items for Schedule A include: 3,100 LF of fiber rolls; 2,000 CY of roadway excavation; 300 sub excavation; 300 CY of riprap; 3,200 tons of aggregate base; 28,500 tons of hot asphalt paving; 200 LF of pipe culvert placement; 600 LF of concrete curb; 70 miles of pavement markings; 2,600 flagger hours Option W: Phased Construction of 1.00 miles of Rowe Well Road roadway reconstruction and paving. Significant Items for Option W include: 3,070 tons of asphalt concrete pavement, 750 CUYD of subexcavation, 910 tons of roadway aggregate, 14,500 SQYD of full depth reclamation and 400 flagger hours. Option X: Phased Construction of.5 miles of roadway reconstruction and paving. Significant Items for Option X include: 2,900 LF of fiber rolls; 5,000 CY of roadway excavation; 300 CY sub-excavation waste; 50 CY of riprap; 3,400 tons of aggregate base; 10,645 SY minor concrete pavement; 200 LF of pipe culvert placement; 5 miles of pavement markings; 5,000 flagger hours. Option Y: Phased Construction of 3.52 miles of South Entrance Drive reconstruction and paving. Significant Items for Option Y include: 600 LF of fiber rolls; 3,000 CY of roadway excavation; 200 CY sub-excavation; 50 CY of riprap; 2,000 tons of aggregate base; 16,390 tons of hot asphalt paving; 30 LF of pipe culvert placement; 8 miles of pavement markings; 3,200 flagger hours. Option Z: Phased Construction of 1.15 miles of Village Loop Drive and Bypass reconstruction and paving. Significant Items for Option Y include: 900 LF of fiber rolls; 400 CY of roadway embankment; 200 CY sub-excavation; 60 CY of riprap; 2,500 tons of aggregate base; 6,000 tons of hot asphalt paving; 30 LF of pipe culvert placement; 2 miles of pavement markings; 3,200 flagger hours.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00017/listing.html)
- Place of Performance
- Address: Grand Canyon National Park, Arizona, United States
- Record
- SN04709935-W 20171012/171010231219-2fc8acae33f71b7634206718485f9062 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |