Y -- Bridge Subcontractors for WY NPS YELL 13(11), East Entrance Road, Fishing Bridge to Indian Pond - Sources Sought Notice

Notice Date
11/1/2017
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, Washington, 98661-3801
 
ZIP Code
98661-3801
 
Solicitation Number
690567-18-SS-0001
 
Point of Contact
Contracts G. Office, Phone: (360)619-7520
 
E-Mail Address
WFL.Contracts@dot.gov
(WFL.Contracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Sources Sought Notice This is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email or fax no later than the date specified in the response section. This intent of this sources sought is for solicitation refinement and market research on qualified bridge subcontractors with sufficient capability to perform all or a portion of the requirements below.. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Requirement: The proposed contract action is for a firm-fixed-priced task order construction contract ordered from our Yellowstone & Grand Teton National Park MATOC. The project contains two major bridge portions: • Pelican Creek Bridge replacement: 1,483 foot, 9 span weathering steel girder superstructure with cast in place concrete deck, deep foundation (open ended steel pipe piles), structural steel fabrication/erection, structural concrete, reinforcing steel, bridge rail. The work includes the removal of the Existing Bridge and road embankment material of the causeway. • Fishing Bridge Rehabilitation: removal of asphalt wearing surface, install Fiber Reinforced Polymer (FRP) bridge deck panels, excavate and backfill west approach with Geosynthetic Reinforced Soil (GRS), repair abutment, and install FRP jackets on timber piles. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $36.5 million. Estimated Price Range: More than $20 million. Additional information on the requirement is available at: https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH7017R00013/listing.html Response: Responses to this notice shall include the following: (a) Company Name (b) Address (c) Point of contact (d) Phone, fax, and email (e) DUNS number (f) Type of business, e.g. Large Business, Small Business, Services Disabled Veteran Owned Small Business,, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business HUBZone business: (h) Listing of your bridge construction experience within the last 6 years where you were the prime or subcontractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts. In addition, answer the five questions below: • Within the past 5 years, have you successfully completed 1 cast-in- place concrete deck with 5 or more individual concrete pours?. • Within the past 5 years, have you successfully completed 1 or more projects where driving of steel pipe piles was greater than or equal to 30" diameter, a minimum of 60' in length, and with at least one splice? • Within the past 6 years, have you successfully installed and worked from a work bridge over wetlands/rivers or other environmentally sensitive areas? • Within the past 6 years, have you successfully completed 1 vehicular bridge 750' or longer with span lengths greater than 150' and the superstructure consisted of steel girders with a cast in place deck? • Within the past 6 years, have you successfully completed 1 bridge construction project with 250 CY of concrete, where the concrete supply was 60 miles or more from the concrete batch location or where a running mobile concrete batch plant was at the project site? The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. Any offeror capable of providing this service shall respond to this sources sought by e-mail to wfl.contracts@dot.gov or by FAX to 360-619-7932 no later than November 15, 2017, 1400 PT.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/WFL/690567-18-SS-0001/listing.html)
 
Place of Performance
Address: Yellowstone National Park, Wyoming, United States
 
Record
SN04728917-W 20171103/171101231132-806d72532f23e68a285b38268505268d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.