Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 13, 2017 FBO #5864
SOLICITATION NOTICE

A -- Partnership Opportunity Document (POD) With NASA Goddard Space Flight Center (GSFC) For A Main Electronics Box (MEB) and/or Mechanism Control Electronics (MCE) - POD

Notice Date
12/11/2017
 
Notice Type
Cancellation
 
NAICS
54171 — Research and Development in the Physical, Engineering, and Life SciencesT
 
Contracting Office
NASA/Goddard Space Flight Center, Code 210.S, Greenbelt, Maryland, 20771, United States
 
ZIP Code
20771
 
Solicitation Number
NASA-GSFC-POD_For_A_Main_Electronics_Box_(MEB)_And_Or_Mechanism_Control_Electronics_(MCE)
 
Point of Contact
Keith Walyus, Phone: 301-286-0834, Shana Faris, Phone: 301-286-8274
 
E-Mail Address
keith.d.walyus@nasa.gov, shana.n.faris@nasa.gov
(keith.d.walyus@nasa.gov, shana.n.faris@nasa.gov)
 
Small Business Set-Aside
N/A
 
Description
POD For A Main Electronics Box (MEB) and/or Mechanism Control Electronics (MCE) Partnership Opportunity Document (POD) With NASA Goddard Space Flight Center (GSFC) For a Main Electronics Box (MEB) and/or Mechanism Control Electronics (MCE) December 2017 General Information Procurement supplied Contracting Office Address NASA's Goddard Space Flight Center, Code 210.S, Greenbelt, MD 20771 1.0 Introduction and Scope This proposal opportunity is for a NASA Second Stand Alone Missions of Opportunity Notice (SALMON-2) for a 2016 Astrophysics Explorer Mission of Opportunity (MoO), under Announcement of Opportunity (AO) NNH12ZDA006O. NASA's GSFC is seeking a partner to provide a flight and engineering version Main Electronics Box (MEB) and a flight and engineering version Mechanism Control Electronics (MCE) to be used with a telescope for a Step 2 proposal. The potential GSFC MoO instrument is designed to meet the science goals of the Explorer Program, as currently understood. The vendor has a choice of submitting a proposal for the MEB, for the MCE, or for both. The government reserves the right to select a single vendor for the MEB, a single vendor for the MCE, a single vendor for the MEB and MCE, separate vendors for the MEB and MCE, or no selection. The International Space Station Transient Astrophysics Observatory (ISS-TAO) was selected in the first step of a two-step process in July 2017. The following key dates are from the AO: Concept Study Reports Due 24 May 2018 Site Review Fall 2018 Final Selection Late 2018 This partnership opportunity is issued to select a teaming partner for the preparation of the GSFC Explorer candidate MoO instrument concept for the proposal submittal. The major flight system component GSFC is interested in finding partners for is an MEB and a MCE. There will be no exchange of funds between the teaming partners for the portion of this partnership opportunity dealing with the preparation of the initial proposal submission to the Explorer Program Element Appendix (PEA). Full funding will be available for subsequent phases should the MoO instrument/mission be competitively selected for those additional phases. Additionally, release of this POD does not commit GSFC to enter into a partnership. 2.0 Mission Overview Desired telescope flight system - GSFC is interested in finding a partner for a MEB and a MCE for the referenced Astrophysics Explorer MoO. No other subsystems of the instrument are part of this POD. Detailed information on the mission parameters of potential Explorer missions will be provided to those responding with a Notice of Interest. A Notice of Interest (it is intentionally not called a notice of intent) does not obligate an organization to provide a POD response. 3.0 Pre-selection Support 3.1 Initial Proposal Support SOW: It is expected that the selected respondent will provide support using their own resources to help develop and write the Mission proposal in response to the PEA in the area of the MEB and MCE design, related subsystems, and mission implementation. This will involve meeting with scientists and the overall mission engineering team to: (a) help define the end-to-end performance and interface requirements; (b) identify study topics; and (c) predict performance. This will include cost estimation for all mission phases. The period of performance for this interval is expected from POD selection to Step 2 proposal submission (~10 months), starting approximately January 2018. 3.2 Phase A Study and Phase A Proposal Support POD Response Instructions for Pre-Selection Support 1. Demonstrate understanding and demonstrated experience in the design, fabrication, integration and testing of the MEB and MCE under consideration: a. Identify the means of addressing system requirements your team assumes are likely to exist and tasks the system is intended for, b. Highlight particularly critical or challenging areas for the design, c. Provide a technical summary/description of the proposed hardware including relevant heritage 2. Identify fabrication and testing facilities that will be required to support development and test of the MEB and MCE. 3. Indicate the level of resources to be allocated for the proposal phase. a. Discuss skills that will be provided, the appropriate level of conceptual design, and all relevant analyses and trade studies. 4. Identify the pertinent missions for whom they have previously provided support for proposal writing in the area of MEB and MCE design, fabrication, integration and testing: a. Provide data on scope of the MEB and MCE, the role that they played in the proposal process, and the portions of the proposal they have written or provided assistance in writing. Provide a customer reference POC. b. Describe how this proposal role mapped to their role in the end instrument development. If the scope changed, explain why. 5) The respondent will be expected to contribute to documenting and costing the MEB and MCE for inclusion in the final Concept Study Report. 4.0 Development Support SOW: If the mission is selected for development and launch, the respondent will be responsible for the design, development, and test of the MEB and MCE and for launch and early orbit check out leading to full scientific operations. The respondent is responsible for identifying the MEB and MCE requirements and providing all aspects of the MEB and MCE (either directly, or through purchasing or teaming arrangements). The period of performance for this interval is expected to last approximately 16-24 months, starting in early 2019. This date may change depending upon selection timelines and budget allocations. POD Response Instructions for Development Support The respondent shall: 1) Identify available design and modeling capabilities required to support development of the MEB and MCE. Describe the level of experience with similar MEB and MCEs for relevant personnel. 2) Identify fabrication and testing facilities that will be required to support development and test of the MEB and MCE. 3) Identify the use of any parts that are not already space rated that are incorporated into the design. 4) Proposers must have experience of flying MEB and MCEs on the International Space Station (ISS). Identify previous MEB and MCEs provided that have flown on ISS missions • Identify which missions they have successfully supported in this capacity and provide a customer reference POC. • Provide information on recent similar MEB and MCE designed and delivered, and describe how that experience is applicable to this mission. This shall include basic information on scope of work, how well the fielded MEB and MCE met the cost and technical requirements, and how well the fielded MEB and MCE met the proposed schedules. 5) Provide a Rough Order of Magnitude (ROM) cost estimate and timeline for the scope of the design, fabrication, and testing of the MEB and MCE. Neither ROM nor timeline will be considered a binding commitment, but will serve as a consideration during the partnership evaluation. In consideration of the rigid cost cap for Explorer missions, the cost ROM for the MEB and MCE will be an important consideration. The respondent is invited to comment on the reasonableness of the ROM cost estimate, and whether the contract will be a firm fixed price contract or a cost plus contract. 6) Present ideas and methods of keeping costs low and the risk of cost growth low, including how they would utilize existing open market hardware to minimize costs and provide a more robust system. 5.0 Additional Information For pre-selection or development support, the respondent can provide any additional information on any other pertinent missions for which his/her establishment, and any partners/vendors proposed, have provided MEBs and MCEs, and identify the relevant details of similar systems. The respondent may also identify any other ideas and related activities, which your organization is or has been involved with, and the significance of that activity to this mission. 6.0 General Instructions for POD Response Potential respondents are asked to contact the GSFC Explorer team by 5 PM EST on December 15th, 2017 with a Notice Of Interest (intentionally not called a notice of intent). This Notice of Interest does not create an obligation to respond to the POD, but allows the GSFC Explorer team to disseminate additional details on the mission parameters and to provide answers to questions from potential partners. Notice of Interest respondents will receive a document containing additional details on the proposed mission, which can be used to facilitate a focused response to the partnership opportunity. These details are competition sensitive and are not to be shared outside the team necessary to prepare a response. After receipt of the mission document, respondents may send questions to the GSFC Explorer Team at the E-mail address listed below. All questions and answers will be made available to all those who respond to the Notice of Interest. The source of the questions shall be held confidential. Questions and answers that contain information unique to a respondent's proprietary approach will not be shared if they are identified as such. Notice of Interest shall be sent to Keith Walyus (keith.d.walyus@nasa.gov) via email with ‘Notice of Interest' in the subject line, a simple sentence or two expressing interest and an email address to send further information. For purposes of this partnership opportunity, the GSFC contact is Keith Walyus, keith.d.walyus@nasa.gov, 301-286-0834. Responses to the POD shall: 1) Be in a PowerPoint presentation format or word document format that shall not exceed 25 pages. The font size for the text shall be no smaller than 12 point. Proposals can be submitted as.pdf files. 2) Be as specific as possible about the proposed MEB and MCE. 3) Address all requirements noted in sections 3.0 through 7.0 of this document. Responses will be treated as proprietary information and controlled as such. Final presentation packages must be received via email by 5 PM (EDT) on December 21st, 2017. Provide the presentation to the GSFC contact listed above. Highly ranked proposers may be asked to participate in an informational telecon with the GSFC instrument team. The telecon would be for clarification of proposal information and may be held prior to award, if deemed necessary by the Government. The telecons would be between the GSFC instrument team and each proposer individually. 7.0 Selection Criteria for Awarding Partnership Opportunity Selection criteria will be consistent with the desire to encourage cost effective partnerships between the Government and Industry. The information requested in Section 7.0 will allow the evaluators to determine how appropriate the respondent's MEB and MCE is to this Explorer mission. Selection Criteria Proposal/Pre-selection Support (25 points) • Experience, team skills and past performance in proposal phases. • Resource commitment during proposal phase. • Identification and description of key critical areas. • Understanding and addressing general requirements and needs for the proposed MEB AND MCE. • Recommended design studies. Development Support (75 points) • Cost of the MEB AND MCE. • Reasonableness of cost and schedule estimates with supporting information from similar previous missions • Experience and past performance in development phases. • Experience and past performance with respect to similar space flight MEBs and MCEs. Experience developing and implementing similar space flight MEBs and MCEs is a minimum requirement. • Completeness of identification of functions by mission phase. • Reasonableness of design and modeling capabilities to support the effort. • Reasonableness of fabrication and testing facilities to support the effort. • Mass of the MEB AND MCE. • Power and thermal control for the MEB AND MCE. • Ability to survive and operate in the target environment. 8.0 Acronyms List AO Announcement of Opportunity EDT Eastern Daylight Savings Time GSFC Goddard Space Flight Center ISS International Space Station ISS-TAO International Space Station Transient Astrophysics Observatory MCE Mechanism Control Electronics MEB Main Electronics Box MoO Mission of Opportunity PEA Program Element Appendix POC Point of Contact POD Partnership Opportunity Document ROM Rough Order of Magnitude SALMON-2 Second Stand Alone Mission Of Opportunity SOW Statement Of Work
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/00d9c4b1116251253413851e6aaefb18)
 
Record
SN04763724-W 20171213/171211231906-00d9c4b1116251253413851e6aaefb18 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.