SOURCES SOUGHT
Y -- Replace the Anacapa Stiff-Leg Derrick Crane with a Two-Crane System
- Notice Date
- 1/17/2018
- Notice Type
- Sources Sought
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of the Interior, National Park Service, DSC-CS-Contracting Services Group, 12795 West Alameda Parkway, Lakewood, Colorado, 80228, United States
- ZIP Code
- 80228
- Solicitation Number
- 140P2018R0014
- Archive Date
- 2/15/2018
- Point of Contact
- Dane Johnson, Phone: (303) 969-2398
- E-Mail Address
-
Dane_Johnson@nps.gov
(Dane_Johnson@nps.gov)
- Small Business Set-Aside
- N/A
- Description
- SOURCES SOUGHT ANNOUNCEMENT The National Park Service has a construction requirement for the following project: Project Location: Channel Islands National Park Park Abbreviation: CHIS Project Title: Replace Anacapa Stiff-Leg Derrick Crane with a Two-Crane System Project #: 185164 Estimated Range: $1,000,000 - $5,000,000 NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) Solicitation No.: 140P2018R0014 Estimated POP: 180 Calendar Days THIS IS NOT A REQUEST FOR PROPOSAL OR AN INVITATION FOR BID. THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT. RESPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT, OR ANY FOLLOW-UP INFORMATION REQUESTS. If you are interested in participating in this competitive requirement, please submit a detailed capabilities statement as described below to: dane_johnson@nps.gov no later than 5:00 p.m. (Mountain Time) on January 31, 2018. If you choose to submit a package, clearly identify the park and project (CHIS - 185164), Solicitation No. 140P2018R0014, your socioeconomic status (i.e. 8(a), HUBZone, Service Disabled Veteran Owned, WOSB, EDWOSB, Small), and your DUNS number. All firms must be certified in the System for Award Management (https://www.sam.gov) at the time of your submission. Analysis of the quantity and quality of responses to this sources sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement. Please refer to the current SBA rules regarding HUBZone firms, effective October 1, 2011. Your email capability information MUST be 8 pages or less and be SPECIFIC to the scope of work and capability information provided below. Submit a Capabilities Statement for your company, and for any subcontractors you would use on the project. The amount of interest, or lack thereof, will determine the possibility of a competitive set-aside, or a full and open competition (the size of a small business firm includes all parents, subsidiaries, affiliates, etc. - see 13 CFR 121.103 and 13 CFR 121.108. Misrepresentation of size status can result in penalties. All firms must be certified in the System for Award Management (https://www.sam.gov) at the time of your submission. Scope of Work Location: Channel Islands National Park, Ventura, CA This project would replace an eighty year old, non-functioning, obsolete, stiff-leg derrick crane located on Anacapa Island, and perform required modifications to the concrete landing it is mounted on. The crane system is required to transport equipment and materials from the vessel to the lower dock, then from the lower dock to the top of the island, a 100-foot vertical lift. The proposed replacement is a two-crane system, with one crane on the upper landing and the other on the lower landing. The two-crane system will include contemporary safety and efficiency features such as cable stops, live boom, and geared or hydraulic swing mechanisms that are in a closed case. The system will improve visual controls of the load lift, allowing a quick pick from the ship to the lower dock, and then a second lift from the lower dock to the top of the island. This maneuverability is essential for a safe, reliable operation with surging tides and heavy wave action in the open ocean setting. The dock and crane location and configuration at the Anacapa Island Landing Cove makes construction access difficult. Equipment will be lifted to the site by a heavy lift helicopter. After the new concrete and the new crane are assembled, the old crane and concrete rubble will be removed from the site and recycled on the mainland. The entire project will be constructed under a single prime contract. Independently, and not as an agent of the government, the contractor shall provide all services including labor, materials, facilities, tools, travel, and expertise (except as otherwise specified in the construction contract) necessary to construct the project described above. Capability Information: 1.Experience: Interested offerors shall submit up to five (5) examples of similar projects that include all individual project components described in scope and costs that occurred within the last five years. Provide sample projects with an approximate contract value of $1,000,000 to $5,000,000 that demonstrate completing the project on time and on budget, taking into account problems encountered on the identified contracts, and the offeror's corrective actions. Projects cited should demonstrate that the Contractor has the technical capability, skills, and experience necessary to construct this project. The Contractor shall have acted as the prime contractor. In particular, focus on the following criteria: Criterion A - Describe your experience working in marine environments. Criterion B - Describe your experience working in remote locations, oceanic islands specifically. Criterion C - Describe your experience working with maritime industrial freight machinery. Criterion D - Describe your experience in dock construction. Criterion E - Describe your experience with protection of historic structures and cultural and natural resources. Criterion F - Provide examples of your work that demonstrates you have successfully worked in environmentally sensitive marine locations (e.g. park, marine sanctuaries/preserves) within the past 5 years. 2.Financial Capability: Interested offerors shall have acted as the prime contractor on projects with an estimated range of $1,000,000 - $5,000,000 providing examples and a determination that your company possesses sufficient resources to successfully complete this project. Offerors shall also provide assurance that they can obtain sufficient bonding for the project. 3.Facility: The contractor shall demonstrate access to, either in-house or via rental, appropriate equipment necessary to complete this project. END SOURCES SOUGHT ANNOUNCEMENT
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/DSC-CS/140P2018R0014/listing.html)
- Place of Performance
- Address: Channel Islands National Park, Anacapa Island, Ventura, California, 93001, United States
- Zip Code: 93001
- Zip Code: 93001
- Record
- SN04792140-W 20180119/180117231449-41fe40a77efa6b686c61729054233a32 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |