Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 21, 2018 FBO #5903
DOCUMENT

S -- New Contract - base + 4 options. RENTAL OF DUMPSTER AND DISPOSAL OF GARBAGE FOR THE WEST VIRGINIA NATIONAL CEMETERY LOCATED AT 42 VETERANS MEMORIAL LANE, GRAFTON, WV SUBJECT FOR AVAIL FY 18 FUNDS - Attachment

Notice Date
1/19/2018
 
Notice Type
Attachment
 
NAICS
562111 — Solid Waste Collection
 
Contracting Office
Department of Veterans Affairs;NCA Contracting Service;75 Barrett Heights Rd. Suite 309;Stafford VA 22556
 
ZIP Code
22556
 
Solicitation Number
36C78618R0112
 
Response Due
1/22/2018
 
Archive Date
3/23/2018
 
Point of Contact
Iris Chen
 
E-Mail Address
1-3787
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Solicitation 36C78618R0112 Amendment 00001 Questions and Answers: Please clarify dumpster size as there is no 24 cubic yard open top roll off available. Only open roll off available are 20, 30, and 40. Answer: The dumpster size is hereby changed to 20-yard. Can you provide waste profile as far as some historical on the tonnage for past containers? Answer: Usually from 2 (two) to 3 (three) tons per call, about 9-12 times per year. About 28 tons last FY. This is not an all-inclusive tonnage and the answer above will not guarantee that this will be the tonnage in the future nor the Government will be liable for any tonnage changes. In the solicitation price matrix is states that we should estimate 12 loads per year, but in the Est quantity is say 8. How should we bid it 8 or 12? Answer: Submit a price in accordance to the quantity requested every year in the pricing schedule. The base year is prorated at 8 jobs because by the time of award, we will be in the middle of the year. Is this a new requirement, or is there an incumbent contractor? If existing, can you provide me the contractor and award amount? Answer: New contract. The Statement of Work for this posting specifies in "Hours of Operation"...Monday through Friday between the hours of 8:00 a.m. - 4:00p.m. Is there some flexibility with this? Answer: NO. Due to the container location and safety issues, pick up is available only during cemetery s operating hours. Is the Contractor required to have a performance bond for this solicitation? Answer: For this type of procurement, probably no, but the Government retain it s right to ask for it.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VANCA/VANCA/36C78618R0112/listing.html)
 
Document(s)
Attachment
 
File Name: 36C78618R0112 00001 36C78618R0112 00001.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4027825&FileName=36C78618R0112-00001000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4027825&FileName=36C78618R0112-00001000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: West Virginia National Cemetery;Route 2 Box 127;Grafton, West Virginia
Zip Code: 26354
 
Record
SN04794901-W 20180121/180119231220-7fff5db0639447798baa8422629cb658 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.