Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 24, 2018 FBO #5906
AWARD

Y -- Building 595 Repair Labs 109 and 110

Notice Date
1/22/2018
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP18Q0004
 
Archive Date
1/27/2018
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP18P0006
 
Award Date
1/12/2018
 
Awardee
QA Engineering, LLC, 4700 Lincoln Road NE, Albuquerque , New Mexico 87109, United States
 
Award Amount
$149960.22
 
Line Number
0001
 
Description
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 595 Repair Labs 109 and 110. a.Demolition 1.Contractor shall remove existing door and hardware, as indicated on drawings. 2.Contractor shall remove existing rubber wall base, as indicated on drawings. 3.Contractor shall remove existing duplex receptacles, as indicated on drawings. 4.Contractor shall remove existing lighting, as indicated on drawings. 5.Contractor shall remove existing crane, as indicated on drawings. 6.Contractor shall remove existing metal fencing, as indicated on drawings. 7.Contractor shall remove existing comm, as indicated on drawings. b.Construction 1.Contractor shall provide and install new level 2 BMS, as indicated on drawings. 2.Contractor shall provide and install government provided door and hardware, as indicated on drawings. 3.Contractor shall install government provided advantor panel, as indicated on drawings. 4.Contractor shall provide and install new motion detectors, as indicated on drawings. 5.Contractor shall provide and install new duplex receptacle, as indicated on drawings. 6.Contractor shall provide and install new rubber wall base, as indicated on drawings. 7.Contractor shall perform new scope of work on existing walls, as indicated on drawings. 8.Contractor shall tape, float, texture and paint walls, as indicated on drawings. 9.Contractor shall provide and install new man bars, z-ducts, and view ports, as indicated on drawings. 10.Contractor shall provide and install new emergency light, as indicated on drawings. 11.Contractor shall fill existing penetrations, as indicated on drawings. 12.Contractor shall provide and install new SAR line, as indicated on drawings.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP18P0006.html)
 
Record
SN04795977-W 20180124/180122230926-fb3e345082dd604ee5f8ca2340316a7c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.