Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 24, 2018 FBO #5906
MODIFICATION

Z -- Installation of Lateral Lines, Riverside West Campground, Burlington, KS - Amendment 1

Notice Date
1/22/2018
 
Notice Type
Modification/Amendment
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Tulsa, Attn: USACE, CESWT- CT, 2488 E. 81st Street, Tulsa, Oklahoma, 74137-4290, United States
 
ZIP Code
74137-4290
 
Solicitation Number
W912BV18Q0025
 
Point of Contact
Pun Chittchang,
 
E-Mail Address
punnie.chittchang@usace.army.mil
(punnie.chittchang@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Appendix A Amendment 0001 ** The due date is extended indefinitely due to the government shutdown. A future amendment will set the new due date.** ** A site visit is scheduled for 1:00PM CST, 9 January 2018 at Riverside West Campground, John Redmond Lake, KS.** All questions regarding this project must be submitted by email to punnie.chittchang@usace.army.mil. The status of the solicitation and award of this project can be found on fbo.gov. Any questions regarding the status of the project will be directed to check fbo.gov. Construction services needed for Installation of properly sized lateral field. The contractor shall provide labor, equipment, and materials needed to efficiently install a properly sized lateral field on to the existing 1000 gallon concrete cased septic vault as specified by USACE and KDHE recommendations. The work site for removal and installation will be located at the Camp Host Camping Area of Riverside West Camp Ground at John Redmond Reservoir Burlington, Kansas in Coffee County. Work includes all aspects of septic system installation-including but not limited to; tree and root removal, trenching, grading, and backfilling. The estimated price is under $25,000. A site visit is scheduled for 1:00PM CST, 9 January 2018 at Riverside West Campground, John Redmond Lake, KS. Directions: To Riverside West Campground - From New Strawn, KS Travel south on HWY-75 to 13th Rd(just south of Neosho River), turn west traveling on 13th Rd until Lynx Rd, turn north traveling on Lynx Rd. Lynx Rd. will turn west at 14th Rd, travel west on 14th Rd. 14th Rd will turn northeast at the toe road below John Redmond Dam, travel northeast until Riverside West Campground is reached. Directions: To Riverside West Campground - From Burlington, KS Travel north on HWY-75 to 13th Rd(just south of Neosho River), turn west traveling on 13th Rd until Lynx Rd, turn north traveling on Lynx Rd. Lynx Rd. will turn west at 14th Rd, travel west on 14th Rd. 14th Rd will turn northeast at the toe road below John Redmond Dam, travel northeast until Riverside West Campground is reached. Please see the solicitation for details and any amendments for updates on time and location. This acquisition is being competed as 100% Total Small Business Set-aside. The NAICS code is 237110.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV18Q0025/listing.html)
 
Place of Performance
Address: Riverside West Campground, Burlington, Kansas, 66839, United States
Zip Code: 66839
 
Record
SN04796066-W 20180124/180122231010-48a0b3604a7e5fd049960dabcc499a19 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.