Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 25, 2018 FBO #5907
SOURCES SOUGHT

Y -- Replace Primary Electrical Infrastructure - Sources Sought Notice

Notice Date
1/23/2018
 
Notice Type
Sources Sought
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Interior, National Park Service, NPS - All Offices, 12795 West Alameda Parkway, Post Office Box 25287, Denver, Colorado, 80225-0287
 
ZIP Code
80225-0287
 
Solicitation Number
CAVE-169636_Replace_Primary_Electrical
 
Point of Contact
Frank Camacho, Phone: (303) 969-2344
 
E-Mail Address
frank_camacho@nps.gov
(frank_camacho@nps.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Sources Sought Notice This project will replace park-owned electrical infrastructure that is unreliable and unsafe due to age, increasing load, and improper installation. Components to be replaced include underground 2400 volt primary conductors, transformers, high voltage switches, and protective devices such as fuses and breakers. 1000943-Replace Electrical Distribution equipment 1691833-Electrical Primary from Substation to VC 1691859-Replace 2.4 KV with 12.4 KV cable from VC to Super's 5879298-Replace Incoming Utility Feeder (A and E) 6824401-Replace 2.4KV with 12.4 KV Cable from Super's to Maintenance. The proposed trenching will be within the existing electrical alignment. Temporary wiring will be installed prior to installation of the new to accommodate demolition of the old wire and installation of the new components. All power to the park must be maintained. The proposed trench is within a steep draw with walls and infrastructure within the proposed trench alignment. Demolition of the existing switchgears and transformers as well as the existing wiring is included. Wiring will be upgraded to a 12.4kVW from the existing 2.4 kVW. Xcel can bypass their existing substation and provide 12.4 kVW with primary metering directly to the park. The substation is located approximately 2,000 feet from the visitor center. From the VC the Primary Circuit travels in a very shallow trench (3-inchesto 8-inches) through the swale - then up and over to the Superintendent Building Electrical Room. As the Primary leaves the Superintendent Electrical Room it runs under a roadway and then turns and extends next to a walking path up to the Maintenance Building Electrical Room. Refer to Exhibit - Existing Primary Route (this page). Also refer to the Schematic Diagram of Existing Primary Distribution
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/CAVE-169636_Replace_Primary_Electrical/listing.html)
 
Place of Performance
Address: Carlsbad Caverns National Park, Carlsbad, New Mexico, 88220, United States
Zip Code: 88220
 
Record
SN04797349-W 20180125/180123231530-a7e8a24f8dbddac68c1a2838ff10173b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.