Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 16, 2018 FBO #5929
AWARD

58 -- Enhanced Polar System Recapitalization (EPS-R) - Redacted JA 17-26

Notice Date
2/14/2018
 
Notice Type
Award Notice
 
NAICS
334220 — Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Space Command, SMC - Space and Missile Systems Center, 483 North Aviation Blvd, El Segundo, California, 90245-2808
 
ZIP Code
90245-2808
 
Archive Date
3/17/2018
 
Point of Contact
Ryan Kittle, Phone: 310-653-9768, Henry Shen, Phone: 3106539824
 
E-Mail Address
ryan.kittle@us.af.mil, henry.shen.2@us.af.mil
(ryan.kittle@us.af.mil, henry.shen.2@us.af.mil)
 
Small Business Set-Aside
N/A
 
Award Number
FA8808-18-C-0002
 
Award Date
2/6/2018
 
Awardee
Northrop Grumman Systems Corporation Aerospace Systems, 1 Space Park Blvd, Redondo Beach, California 90278-1001, United States
 
Award Amount
$428,806,926.00 NTE
 
Line Number
CLIN 0001 – EPS Payloads (P6, P7) SE&I, Design, Build, Test & On-Orbit Checkout / CLIN 0002 - Reserved / CLIN 0003 - Special Studies
 
Description
Redacted J&A 17-26. This is a notice of award for contract FA8808-18-C-0002 IAW FAR 5.301(a)(1)(ii). The attached Justification & Approval (J&A) authorized the non-competitive award of contract FA8808-18-C-0002 and is being made publicly available within 14 days of contract award IAW FAR 5.301(d)(1) and FAR 6.305(a). The J&A will remain publicly available on FedBizOpps for 30 days IAW FAR 6.305(d)(1, 3). A previous Notice of Contract Action was posted on 15 September 2017 for sole source solicitation FA8808-18-R-0002. The Contractor shall provide the necessary personnel, material, services, and facilities to produce, integrate, and test the payloads. The Contractor shall define and document the required specifications, interfaces, design features and constraints, hardware and software elements, and data products necessary to support the Government's acquisition, Integration and Test (I&T), launch, and on-orbit operation of the EPS-R payload. The Contractor shall provide program management, business and scheduling management, subcontracts management, mission assurance, material acquisition management, and processes management. The period of performance is from Feb 2018 to Dec 2023.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFSC/SMCSMSC/Awards/FA8808-18-C-0002.html)
 
Record
SN04822680-W 20180216/180214231223-c75102dbae64c4d5d883738eef31319e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.