Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 22, 2018 FBO #5935
DOCUMENT

J -- UNINTERRUPTED POWER SUPPLY (UPS) PREVENTATIVE MAINTENANCE - Attachment

Notice Date
2/20/2018
 
Notice Type
Attachment
 
NAICS
811219 — Other Electronic and Precision Equipment Repair and Maintenance
 
Contracting Office
Department of Veterans Affairs;NCO 16 (90C/NLR);Central Arkansas Veterans HCS;2200 Fort Roots Drive, Bldg 41, Room 221;North Little Rock AR 72114 1706
 
Solicitation Number
36C25618Q9177
 
Response Due
2/20/2018
 
Archive Date
4/21/2018
 
Point of Contact
Jacqueline Simpson
 
E-Mail Address
7-1039<br
 
Small Business Set-Aside
N/A
 
Description
This is not a solicitation announcement. This is a sources sought synopsis only. The purpose of this is to gain knowledge of potential qualified sources and their size relative to NACIS 811219, Standard Size $25.0 Million. Responses will be used by the Government to make appropriate acquisition decisions. Responses are not considered responses to any potential solicitation announcement. Scope of Work Central Arkansas Veterans Healthcare System requires corrective and preventive maintenance services to maintain the Uninterrupted Power Supply Systems (UPS) at the Little Rock / North Little Rock, AR, Campuses. Maintenance the Input/output electrical switchgear, valve-regulated lead-acid (VRLA) Batteries, and Battery Management System. All interested firms shall provide the following information: company name, address, point of contact, phone number, email address, capability statement, and business size pursuant to the NAICS code 811219, Standard Size $25.0 Million. Responses to this notice shall be e-mailed to Jacqueline.Simpson3@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than Friday, February 23, 2018 at 12pm CST. This notice is to assist the VA in determining sources only. A solicitation is not currently available. If a solicitation is issued it will be announced at a later date, and all interested parties must respond to that solicitation announcement separately from the responses to this announcement. Responses are not a request to be added to a prospective bidders list or to receive a copy of the solicitation. PERFORMANCE WORK STATEMENT The Department of Veterans Affairs (VA), Central Arkansas Veterans Health System(CAVHS), Engineering Maintenance and Operations, Equipment Repair, requires corrective and preventative maintenance for the following brand named Uninterruptible Power Supply (UPS) Systems, Input/output electrical switchgear, valve-regulated lead-acid (VRLA) Batteries, and Battery Management System located at 2200 Fort Roots Dr., North Little Rock, AR., Building 102 and John L McClellan Medical Center, West 7th Street, Little Rock, AR, Room GD-123. PERIOD OF PERFOMANCE Period of Performance: Base Year + 3 Option Years Contract Type: Firm Fixed-Price Restriction on Submission and Use of Equal Products (NOV 1986) of this solicitation which prohibits proposing equivalent products. Description Part # Quantity Valve Regulated Lead Acid Batteries UPS12-490MR 240 Valve Regulated Lead Acid Batteries UPS12-350MR 80 Powerware 9315 300KvA s/n; EV414ZXX01 UPS; Powerware 9315 1 w/ (2) strings associated VRLA battery systems. Located in Little Rock JLM VA Medical Center Rm GD123 Powerware 9395 500KvA s/n EG366BAA14 UPS; w/ Powerware 9395 1 (3) strings associated VRLA battery system. Located on North Little Rock, Bldg. 102 Powerware 9395 500KvA s/n EG366BAA15 UPS; w/ Powerware 9395 1 (3) strings associated VRLA battery system. Located on North Little Rock, Bldg. 102 Requirements: 1.1 On Call Maintenance: The contractor shall provide corrective and preventive maintenance to include parts and labor for all routine and emergency repairs. The response time shall be no more than four (4) hours from the time a call is placed to the time a Field Service Engineer arrives on-site. The contractor shall have a local on staff representative (local means within fifty miles of site) who is factory trained to work on parallel series 9315-300 and 9395-500 UPS modules and factory authorized to access the proprietary XCP maintenance software service tool. All maintenance shall be performed in accordance with the manufacturer s equipment technical manual recommended service. The battery maintenance shall be performed in accordance with Institute of Electrical and Electronics Engineers (IEEE) standard 450, IEEE Recommended Practice for Maintenance, Testing, and Replacement of VRLA Storage Batteries for Generating Stations and Substations, 1.2 Four- Hour Load Tests - Twice Yearly: During the four-hour generator load test performed by VA twice per year the contractor shall perform standby monitoring of the UPS system to ensure proper operation with emergency generator power. Load tests typically take place in February and August, however actual dates to be provided by the COR. Upon completion of each load test the contractor shall provide a detailed written report to the Contracting Officer s Representative (COR) to include the following information: 1) Observed voltage, current, power regulation, and describe any abnormalities 2) Performance of UPS battery discharge 3) Performance of critical load switching 1.3 Monthly Performance Checks: The contractor shall complete monthly performance checks of the UPS module and provide a detailed report to the COR to include the following information while also making specific recommendations toward future remedial action, upgrades, or sparing: Environmental Parameters: A. UPS area ambient temperature and humidity B. Operating condition of ventilating equipment and cooling equipment C. General Cleanliness of UPS Power Module D. General Cleanliness of UPS area E. Replace air filters, as needed F. Clean outside of UPS including control panel/CRT screen Battery System Checks: A. General appearance of Battery System (external batteries) B. General cleanliness of Battery System area C. Battery System area ambient temperature and condition of ventilating equipment D. Inspect jars/cells for physical case abnormalities (external batteries) E. Inspect all DC power interconnections for abnormalities (external batteries) Monitoring System Parameters: A. Download, print and review of alarm history/event B. Download print and review of present front panel metering values C. System Input Voltages, Currents, and Frequency D. Rectifier Input Voltages, Currents, and Frequency E. DC Charging Voltages and Current F. Inverter Output Voltages, Currents, and Frequency G. System Output Voltages, Currents, and Frequency H. System Bypass Voltages and Currents (all phases) I. Download print and review of battery self-test data J. Download and print of unit configuration report K. Operating status or remote monitor status panels Following the Performance Check, a written report will be provided detailing the results of the inspection, and making specific recommendations toward future remedial action, upgrades, or sparing. Deliverables: a) Monthly Performance Check inspection report 1.4 Power Distribution Unit (PDU) and Remote Power Panels (RPP) Preventative Maintenance Checks Twice Yearly The contractor shall perform preventative maintenance checks semi-annually with exact dates to be approved by the COR (may possibly take place on a Sunday) to include the services below. All checks are designed to be performed during normal operation with no danger to the operating condition of the equipment or to the critical load. All checks or processes may not be applicable to all equipment models. Following the Preventative Maintenance checks, a written report will be provided detailing the results of the inspection, and making specific recommendations toward future remedial action, upgrades, or changes in spare part. NOTE: For safety purposes PDU/RPP PM s shall be performed by two (2) certified UPS contractors. 1.0 Visual Inspection 1.1. Inspect all power connections for signs of overheating or discoloration. 1.1.1. Using a non-contact temperature probe. 1.2. Inspect all AC capacitors for signs of leakage. 1.3. Inspect all EMI, FCC, and TVSS filtering components. 1.4. Inspect and inventory all customer owned spare parts. 1.5. Inspect for and note any open engineering changes. 2.0 Operating Parameters 2.1. Systems primary input measurements (volts, amps, frequency, and power). 2.2. Systems secondary input measurements (volts, amps, frequency, and power). 2.3. System output measurements (volts, amps, frequency, and power). 2.4. Percentage of output voltage regulation as compared to target value. 2.5. Output load balance between phases. 2.6. Power Supply voltages and waveforms. 3.0 Environmental Parameters 3.1. Areas ambient temperature and percent humidity. 3.2. Operating condition of ventilating equipment and cooling equipment. 3.3. General Cleanliness of equipment. 3.4. General Cleanliness of area around equipment. 3.5. Clean control panel and display screen. 3.6. Replace air filters. 4.0 Monitoring System Parameters 4.1. Download, print, and review alarm \ event history queue. 4.2. Verify all monitoring functions, displayed values, and lamp tests (local and remote). Following the Preventative Maintenance, a written report will be provided detailing the results of the inspection, and making specific recommendations toward future remedial action, upgrades, or changes in spare parts. Deliverables: Preventative Maintenance inspection report 1.5 Input/output Switchgear (Energized) Twice Yearly 1. The projected months to perform these tasks are February and August (February inspection to be coordinated with annual, see below). 2. Perform maintenance on each Input/output switchgear to include the following: a.) Open doors and inspect the following components to detect overheating: 1.) Fronts of circuit breakers. 2.) Protective and control relays (control wiring, not internals). 3.) Auxiliary devices, wiring, and terminal blocks (proper indicating lamps should light). 4.) Insulators and insulating materials 5.) Cable connections 6.) Batteries (if used) 7.) Loading (record loads) 8.) Cleanliness 9.) Dryness (evidence of condensation or water leaks) 10.) Rodents and reptiles 11.) Overheating of parts (discoloration or oxidation indicates possible problem. Deliverables: a) Air Break Circuit Breakers inspection report 1.5a Air Break Circuit Breakers (De-energized) Annual (Once per Year) 1.) Inspection and maintenance (circuit breakers withdrawn from switchgear and de-energized) 2.) This work shall be performed during a complete building electrical shut down and coordinated with the VA AITC Facilities staff. 3.) Perform maintenance on all Air Break circuit breakers to include the following: a.) Remove arc chutes and inspect-Adjust and clean as needed. b.) Main contacts-Inspect for pitting, spring pressure, overheating, alignment, overtravel, or wipe and for arc erosion. c.) Moving parts and linkages- Verify components have freedom of movement. d.) Closing mechanism- Verify has quick and positive closing action. e.) Tripping mechanism- Verify components have freedom of movement and reliability to open breaker contacts. f.) Interlocks and safety devices- Functionally test to prove proper operation. g.) Primary disconnect finger clusters- Verify proper alignment and spring pressure and ensure lubricated. h.) Closing and trip coils- Inspect general condition and evidence of overheating. i.) Spring charging motor and mechanism (stored energy type)-Verify proper operation and check for oil leaks from gear motor. j.) Shunt trip device- Verify has freedom of movement and functionally test. k.) Anti-single-phase or blown fuse lockout devices (fused breaker only) - Check general condition and functionally test with proper voltage to trip and lock out breaker. l.) Auxiliary contacts- Inspect for proper operation with closing and opening of breaker. m.) Closing (X and Y) relays (electrically operated breakers)- Inspect for contact erosion and dress and/or replace as required. n.) Current transformers Inspect general condition and check nameplate ratio. o.) Connection bolts- Inspect for tightness. p.) Structure or frame- Inspect for proper alignment and loose or broken parts. q.) Fuses and mountings- Inspect general condition and tightness. r.) Frame grounding device Connect before and disconnect after primary fingers. s.) Position Indicators Inspect for proper operation. t.) Auxiliary wiring Inspect general condition and tightness of terminal screws. u.) Arc chutes Inspect for broken parts, missing arc splitters, and amount of metal spatter and burning on interior surfaces. v.) Operation counter (if equipped) Inspect for proper operation and record number of operations. w.) Insulators and insulating materials- Inspect for cracks, breaks, and overheating. x.) Breaker auxiliary devices- Perform necessary repairs. y.) Test insulation resistance Test with 2500-volt megohmmeter on each main contact with breaker open and all other main contacts and frame grounded. Test with 1000-volt megohmmeter on auxiliary devices and controls and associated wiring, except solid state trip devices. z.) Contact conductivity or resistance- Use microhmmeter or determine voltage drop under test load conditions. aa.) Overcurrent (OC) trip devices (electromechanical, series type)- Pass specified currents from high-current test set through coils of series type OC trip devices. Trip devices should open breaker contacts within time limits per manufacturer s or specifically designed time-current coordination curves. Adjust trip devices as required to accomplish desired results. Test set should be equipped with cycle counter for accuracy of short-time and instantaneous trip results. Record results. bb.) Overcurrent trip devices (electromechanical, 5 amp CT type)- Test 5 amp, type OC trip devices in similar manner using reduced current proportional to ratio of CT s in switchgear that normally supply current to the OC trip coils. Record results. cc.) Overcurrent (OC) trip devices (Solid-state type)- Use manufacturer s instructions and test set specifically designed for solid-state trip device being tested, or use primary injection from high-current test set. Adjust trip device settings to obtain desired tripping times and currents to conform to applicable coordination curves. Record results (Do not use megohmmeter insulation resistance tester on solid-state trip devices or associated wiring. dd.) System testing (breaker installed) Electrically operated breaker After preceding maintenance and testing have been satisfactorily completed, install electrically operated breaker in proper switchgear cell and rack it into Test position. Operate closing control devices to ensure that breaker closes and latches without trip-free operations. Operate trip control devices to ensure that breaker trips open in a reliable manner. Functionally test all electrical interlock and safety devices. After satisfactorily passing all operational tests, the breaker can be racked into the Connected position and placed in normal service. Deliverables: Air Break Circuit Breakers inspection report 1.5b Input/output Switchgear (De-energized) Performance in Option Period 2 Only 1.) This work shall be performed during a complete building electrical shut down and coordinated with the VA OI&T Facilities staff. 2.) Perform maintenance on each Input/output switchgear including the following: a.) Major maintenance or overhaul Verify that no parts of the power or control circuitry are energized by back feed from alternate power or control sources. b.) Completely clean, inspect, tighten and adjust all components, components, and enclosure. c.) Ventilating louvers- clean as needed. d.) Buses, splices, and bolts- Check bolts for manufacturer recommended torque. e.) Insulators and insulating materials Clean and inspect for cracks. f.) Circuit breakers and circuit breaker disconnect studs, fingers, and clusters Inspect for proper adjustment and spring pressure and overheating. Inspect retainer rings for stress cracks in corners. Lubricate, unless manufacturer s instructions specify otherwise. g.) Cable connections Inspect for evidence of overheating. Check for tightness. h.) Draw-out breaker racking mechanisms- check for proper alignment and ease of operation. i.) Meters-Test for accuracy. j.) Controls, interlocks and closing power rectifiers-Perform functional tests and check voltages. k.) CT s, PT s and control power transformers Verify operational. l.) Fuse clips and fuses- Check clips for adequate spring pressure and proper fuse ratings. m.) Grounding components and conditions- Make necessary repairs. n.) Protective relays and overcurrent trip devices- Use high-current test equipment and adjust trips to operate in accordance with manufacturer s and specially prepared time-current coordination curves. Adjust for proper conformance. o.) Test conductivity of aluminum cable connections- Use microhmmeter or determine voltage drop under test load conditions. Deliverables: Input/output Switchgear (De-energized) inspection report 1.6 Battery Maintenance Twice Yearly 1. The projected months to perform these tasks are February and, August (February inspection to be coordinated with annual, see below). These dates may change and are dependent on approval by the COR and OI&T Facilities Management personnel (Bldg. 102) staff. 2. Perform maintenance on each battery and string per manufacturer specifications including but not limited to the following: a). Measure and record AC ripple voltage and AC ripple current on batteries. b). Measure and record DC float current on batteries. c). Measure and record battery room ambient temperature. d) Check and record the integrity of the battery jars and rack for each string. e) Check and record the general appearance and cleanliness of each battery string. Clean cell jars and racks as necessary in accordance with manufacturer s recommendations (see Battery Cleaning section of manufacturer s maintenance instruction). f) Measure and record open cell voltage of each cell. g) Measure and record float voltage each string. h) Using a calibrated digital micro-ohmmeter, measure and record (in micro-ohms) the resistance of each cell interconnection. The contractor shall note which interconnection is a jumper cable. i) Compare resistance readings to original installation resistance readings. The contractor shall note which cells exceed the allowable tolerance (less than 20% higher than the original installation readings). If the resistance reading is still out-of-tolerance, clean, re-coat, reassemble and re-torque the connections until the reading is within tolerance. Replace any connections as necessary to provide a connection within tolerance. j) Spot-check torque on 10% of intercell connections. The contractor shall record which cells were checked. Torque to 75 inch-pounds and re-measure any found out-of-tolerance. k) Provide a performance check of each battery string disconnect switch. l) Provide reports within 15 days of the completion of this work. m) Coordinate with OI&T facilities management personnel and generator contractor, using the contacts listed, and stand-by for a 4-hour full load test following completion of all items above. This will be completed in conjunction with UPS major inspections. n) Check Cellwatch Battery Management system and eliminate any nuisance alarms that were created during battery services. o) Operator training to be provided to staff when on-site. p) Wipe down and clean or vacuum all equipment listed in this contract. 1.7 Annual Maintenance 1. Visual Inspection a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary. b. Inspect all power connections for signs of overheating. c. Inspect all subassemblies, bridges and legs for signs of component defects or stress. d. Inspect all DC capacitors for signs of leakage. e. Inspect all AC capacitors for signs of leakage. f. Inspect and inventory all customer-owned spare parts. g. Inspect for, and perform as required, any open engineering changes. h. Inspect battery monitoring system. 2. Internal Operating Parameters. a. DC Ground Detection Offset. b. Inverter leg current average balance. c. Output filter current average phase balance. d. Rectifier bridge current average leg balance. e. AC Protection settings are checked. f. DC Protection settings are checked. g. Input and Output Frequency and Voltage Bandwidth settings are checked. h. Verify DC filter capacitance. i. Verify AC tank and trap filter capacitance. j. Power Supply voltages and waveforms. k. Update firmware as necessary with customer approval (parts if required are included at no charge under service agreements with full parts coverage. Evaluate Field Service Bulletins (FSBs) for potential updates (parts if required are included at no charge under service agreement with full parts coverage. 3. External Operating Parameters a. System Input Voltages (all phases). b. System Input Currents (all phases). c. DC Charging Voltages (float and equalize), record settings, adjust to nominal. d. Rectifier phase on and walk up. e. Inverter phase on and walk up. f. Adjust all panel meters to measured values. g. System Bypass Voltages (all phases). h. Manual and UV Transfer Testing, verify uninterrupted transfer waveform. i. Outage simulation, and battery capability testing, and verify charger current limit. j. Generator operation and interface verification. 4. Environmental Parameters a. UPS area ambient temperature and condition of ventilating equipment. b. General Cleanliness of UPS Power Module. c. General Cleanliness of UPS area. d. Replace air filters as applicable and necessary (parts if required are included at no charge under service agreements with full parts coverage. e. Clean outside of UPS including control panel/CRT screen. f. Flywheel only: Drain oil and change oil and filters. 5. Battery Cabinet Checks a. General appearance of Battery System (all types). b. General cleanliness of Battery System area (all types). c. Inspect cells for physical abnormalities. d. Inspect all DC connections for abnormalities. e. Battery System area ambient temperature and condition of ventilating equipment. f. For internal batteries only measure and record: i. Overall battery float voltage ii. Charger output current and voltage iii. Negative terminal temperature of one cell/battery per battery cabinet shelf or rack tier iv. Momentary load testing of cells < 100 watts (e.g. 9E, 9x55, not 9330) 6. Monitoring System Parameters a. Alarm archive review and printing. b. Alarm lamp test-local and remote. c. Replace all open monitor bulbs. d. Inspect battery monitoring system. e. Review Battery Test in history. 7. Provide infrared testing services (with follow up report) on all UPS modules, UPS Batteries, SBM, computer room PDU s/RPP s and all associated UPS and generator powered electrical panels. 8. General a. Customer Consultation. b. Verbal Recommendations. c. General Observations. Following the Preventive Maintenance inspection, a written report will be provided detailing the results of the inspection, and making specific recommendations toward future remedial action, upgrades, or sparing. Deliverables: Annual Maintenance inspection report 1.8 METHOD AND DISTRIBUTION OF DELIVERABLES The Contractor shall deliver documentation in electronic format, unless otherwise directed in Section B of the solicitation/contract. Acceptable electronic media include: MS Word 2000/2003/2007/2010, MS Excel 2000/2003/2007/2010, MS PowerPoint 2000/2003/2007/2010, MS Project 2000/2003/2007/2010, MS Access 2000/2003/2007/2010, MS Visio 2000/2002/2003/2007/2010, AutoCAD 2002/2004/2007/2010, and Adobe Postscript Data Format (PDF). Special Shipping Instructions: Prior to shipping, Contractor shall notify Site POCs, by phone followed by email, of all incoming deliveries including line-by-line details for review of requirements. Contractor cannot make any changes to the delivery schedule at the request of Site POC. The Contractor shall email a copy of all shipping receipts to the COR. Contractors must coordinate deliveries with Site POCs before shipment of hardware to ensure sites have adequate storage space. All shipments, either single or multiple container deliveries, will bear the VA Purchase Order number on external shipping labels and associated manifests or packing lists. In the case of multiple container deliveries, a statement readable near the VA PO number will indicate total number of containers for the complete shipment (ex. Package 1 of 2 ), clearly readable on manifests and external shipping labels. 1.9 INFORMATION SECURITY CONSIDERATIONS: The Assessment and Authorization (A&A) requirements do not apply and a Security Accreditation Package is not required. All VA sensitive information shall be protected at all times in accordance with local security field office System Security Plans (SSP s) and Authority to Operate (ATO s) for all systems/LAN s accessed while performing the tasks detailed in this Product Description. a. A prohibition on unauthorized disclosure: Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. See VA handbook 6500.6, Appendix C, paragraph 3.a. b. A requirement for data breach notification: Upon discovery of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access, the contractor/subcontractor shall immediately and simultaneously notify the COR, the designated ISO, and Privacy Officer for the contract. The term security incident means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. See VA Handbook 6500.6, Appendix C, paragraph 6.a. c. A requirement to pay liquidated damages in the event of a data breach: In the event of a data breach or privacy incident involving SPI the contractor processes or maintains under this contract, the contractor shall be liable to VA for liquidated damages for a specified amount per affected individual to cover the cost of providing credit protection services to those individuals. See VA handbook 6500.6, Appendix C, paragraph 7.a., 7.d. d. A requirement for annual security/privacy awareness training: Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall complete on an annual basis either: (i) the VA security/privacy awareness training (contains VA security/privacy requirements) within 1 week of the initiation of the contract, or (ii) security awareness training provided or arranged by the contractor that conforms to VA s security/privacy requirements as delineated in the hard copy of the VA security awareness training provided to the contractor. If the contractor provides their own training that conforms to VA s requirements, they will provide the COR or CO, a yearly report (due annually on the date of the contract initiation) stating that all applicable employees involved in the VA s contract have received their annual security/privacy training that meets VA s requirements and the total number of employees trained. See VA Handbook 6500.6, Appendix C, paragraph 9. e. A requirement to sign VA s Rules of Behavior: Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall sign on annual basis an acknowledgement that they have read, understand, and agree to abide by VA s Contractor Rules of Behavior which is attached to this contract. See VA Handbook 6500.6, Appendix C, paragraph 9, Appendix D. Note: If a medical device vendor anticipates that the services under the contract will be performed by 10 or more individuals, the Contractor Rules of Behavior may be signed by the vendor s designated representative. The contract must reflect by signing the Rules of Behavior on behalf of the vendor that the designated representative agrees to ensure that all such individuals review and understand the Contractor Rules of Behavior when accessing VA s information and information systems.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VACAHCS598/VACAHCS598/36C25618Q9177/listing.html)
 
Document(s)
Attachment
 
File Name: 36C25618Q9177 36C25618Q9177.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4096589&FileName=36C25618Q9177-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4096589&FileName=36C25618Q9177-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Central Arkansas Veterans Healthcare Sys (CAVHS);4300 W. 7th Street;2200 Fort Roots Drive;Little Rock, AR
Zip Code: 72205
 
Record
SN04828052-W 20180222/180220231242-76644948292078ba9253fe827e06ea74 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.