Z -- Only those Contractors listed in RFP are allowed to Bid on this Solicitation... Demo building 548 and remove tanks Naval Submarine Base Groton CT.

Notice Date
2/22/2018
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N40085 NAVFAC Mid-Atlantic, ROICC New London Box 26 Naval Submarine Base - New London Groton, CT
 
ZIP Code
00000
 
Solicitation Number
N4008518R7307
 
Response Due
3/29/2018
 
Archive Date
4/13/2018
 
Point of Contact
Daniel Casserino 860-694-4528 Michael Giangregorio
 
E-Mail Address
<!--
 
Small Business Set-Aside
N/A
 
Description
The purpose of this project is the demolition of the following facilities at SUBASE New London: 1. Building 548 (Fuel Operations Facility, Approx. 640 sf) 2. Facility 548A (Fuel Load/unload Facility) with two outlets 3. OT14 (Oily Waste Tank, underground) Capacity-6K Gal, DOUBLE WALLED FIBERGLASS TANK WITH CATHODICALLY PROTECTED SINGLE WALLED STEEL PIPING 4. OT15 (Defuel Tank, underground) Capacity -25K Gal, DOUBLE WALLED FIBERGLASS TANK WITH CATHODICALLY PROTECTED SINGLE WALLED STEEL PIPING 5. OT16 (Defuel Tank, underground) Capacity “ 25K Gal, DOUBLE WALLED FIBERGLASS TANK WITH CATHODICALLY PROTECTED SINGLE WALLED STEEL PIPING 6. OWS2 (Oily Water Separator #2) Capacity -2K-Gal Total square footage of space to be demolished at Subase NLON = Approx. 640 SF of Building Remove hazardous materials prior to demolition. Remove/Cut/Cap utilities and reroute utilities as required to ensure continuity of utility services to buildings that are not being demolished. For water lines and sewer lines, remove lines that are no longer required back to the service main so that no dead ends are left in the ground. Remove all the aforementioned underground tanks. These tanks are empty and the piping is drained. Remove existing retaining wall and fence on the south and west side of the B548. Provide design for site restoration after demolition; site restoration will be: 1. Grading of the site to blend with the surrounding area and proposed grading for B20 site. B20 is demolished and the site area is to be graded to blend with the surrounding area. The final product shall result into a single paved area that will be accessible for parking from East or West side of the site. 2. Placement of asphalt pavement and markings. Section 01 11 00 Summary of work pg-1. Attached Specifications and drawing Work Order Number 1374906, Dated 11/15/2017.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62472NL/N4008518R7307/listing.html)
 
Record
SN04831588-W 20180224/180222231816-66d514141b852dc9a4ce2827097fc71d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.