MODIFICATION
Y -- UT FTNP Zion 13(1), Kolob Canyon - Solicitation 1
- Notice Date
- 3/6/2018
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- 6982AF18B000004
- Response Due
- 4/5/2018 2:00:00 PM
- Archive Date
- 4/20/2018
- Point of Contact
- Donald Peters, Phone: 7209633347, Ryan Phillips, Phone: 7209633566
- E-Mail Address
-
donald.peters@dot.gov, ryan.d.phillips@dot.gov
(donald.peters@dot.gov, ryan.d.phillips@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- Final_Hyd_Rpt Geotechnical Report 6982AF18B00004_UT_FTNP_ZION_13(1)_Kolob Canyon Plans 6982AF18B00004_UT_FTNP_ZION_13(1)_Kolob Canyon Solicitation 6982AF18B00004_UT_FTNP_ZION_13(1)_Kolob Canyon This is an Invitation for Bid, final plans and specs are available. Representatives from the Federal Highway Administration (FHWA) conducted a site visit and pre-bid meeting, on Wednesday November 29, 2017. Another site visit will not be conducted. All interested bidders are encouraged to view the area on their own. PROJECT DETAILS: UT FTNP Zion 13(1), Kolob Canyon The project is located in Zion National Park, Washington County, UT. The proposed project includes road and pavement rehabilitation of 6.2 miles of Zion Canyon Scenic Drive. Kolob Canyon Road construction includes but is not limited to pulverizing of existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curbing, replacement of CMP culverts, and riprap placement. Zion Canyon Scenic Drive construction includes but is not limited to milling of the existing pavement, overlay with asphalt concrete paving, reconstruct one intersection with Portland cement concrete paving. This project consists of: Schedule A: Reconstruction of 5.3 miles of Kolob Canyon Road, by pulverizing and paving. Significant Items for Schedule A Include: 92,000 SY of existing pavement pulverization, 17,600 tons of hot asphalt concrete paving, 14,000 LF of concrete curb, and 1,400 LF of pipe culvert placement. Potential landslide mitigation may include excavation and stabilization work. Option V - Kolob Canyons Road Comfort Stations (Restroom Facilities) Option W: Zion Canyon Scenic Drive/Zion Lodge Intersection Option X: Zion Canyon Scenic Drive Option Y: Rehabilitation of 6.2 miles of Zion Canyon Scenic Drive by milling and overlaying the existing pavement. Significant Items for Option Y Include: 93,000 SY of milling existing asphalt pavement, 7,500 tons of hot asphalt concrete paving. Option Z: Reconstruction of the Zion Canyon Scenic Drive and Zion Lodge entrance intersection with Portland cement concrete paving. Significant Items for Option Z Include: Removal of 950 CY of existing pavement and construction 1,400 SY of PCCP. Solicitation will be full and open competition. Estimated total cost is $5 million to $10 million.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF18B000004/listing.html)
- Place of Performance
- Address: Washington County, Zion National Park, Utah, 84767, United States
- Zip Code: 84767
- Zip Code: 84767
- Record
- SN04844349-W 20180308/180306231259-0979dda34bdec853f2ee085ed2bbb3ee (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |