Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 18, 2018 FBO #5990
MODIFICATION

Y -- NE FLAP 7136(1), Montrose Bridge Repair - Solicitation 1

Notice Date
4/16/2018
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF-18-B-000010
 
Archive Date
5/31/2018
 
Point of Contact
Donald Peters, Phone: 7209633347, Sheri Muehl, Phone: 7209633351
 
E-Mail Address
CFLCFLHD@dot.gov, CFLCFLHD@dot.gov
(CFLCFLHD@dot.gov, CFLCFLHD@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Site Visit 6982AF18B000010 Montrose Bridge Hydro Report 6982AF18B000010 Montrose Bridge Geotechnical Report 6982AF18B000010 Montrose Bridge Plans 6982AF18B000010 Montrose Bridge Solicitation 6982AF18B000010 Montrose Bridge THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE. Montrose Bridge is in Sioux County, Nebraska approximately 25 miles northeast of Harrison Nebraska. The bridge is on Montrose Road and crosses over Hat Creek. Montrose Road is owned and maintained by Sioux County. The road provides access to Oglala National Grasslands. This project consists of replacing the existing bridge with a new prefabricated steel bridge with structural steel decking and aggregate wearing surface. The existing abutment piles and wingwalls will be reused, to the maximum extent possible, with additional piles being added to provide adequate support. Bridge transition railing will be added, which the original bridge did not have. The existing roadway approaches will be widened to match the new bridge width and the existing roadway width. Additionally, the widening will allow the installation of the transition railing and end terminals. The road will be closed during construction and the project is expected to take 3 months. Items worth noting: Sioux County will be performing work as part of the match, so coordination between the County and the Contractor will be critical. Bridge submittals and manufacturing will be a long duration item; therefore, they may need to be addressed before NTP is given. Principal Work Items 20304-2000 Removal of Bridge (Partial Substructure) 20304-4000 Removal of Bridge Superstructure 20420-0000 Embankment Construction 55104-1000 Steel H-Pile, 14x89, In Place 55201-0200 Structural Concrete, Class A(AE) 55401-2000 Reinforcing Steel, Epoxy Coated 55504-0000 Pre-Fabricated Steel Bridge (104'x20', 1-Lane) The anticipated range for the project is $500K to $1Million A pre-bid meeting notice is being posted to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will provide a site visit information on Monday April 23, 2018, from 1:00 p.m. Mountain time to approximately 3:00 p.m. Mountain time.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF-18-B-000010/listing.html)
 
Place of Performance
Address: Sioux County, Nebraska, Harrison, Nebraska, 69346, United States
Zip Code: 69346
 
Record
SN04889904-W 20180418/180416230538-c87fe8b967a77da898fafd6f78e646bb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.