SOLICITATION NOTICE
Z -- Chetco River Bridge Rehabilitation
- Notice Date
- 5/10/2018
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-6 Contracting West - Rogue River-Siskiyou NF, 3040 Biddle Road, Medford, Oregon, 97504, United States
- ZIP Code
- 97504
- Solicitation Number
- 1204T018R0005
- Point of Contact
- Janet Paul, Phone: 541-750-7120, Vicky L Mugnai, Phone: 541-618-2020
- E-Mail Address
-
jpaul@fs.fed.us, vickymugnai@fs.fed.us
(jpaul@fs.fed.us, vickymugnai@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- *** THE FULL SOLICITATION ESTIMATED ISSUE DATE: Electronically in Federal Business Opportunities on or about May 25, 2018. *** This project is for the rehabilitation of an existing concrete vehicular bridge at milepost 1.0 of Forest Service Road 1376, as it crosses the Chetco River. The project is located on the Gold Beach RD, Rogue River-Siskiyou NF, approximately 9 miles northeast of Brookings in Section 12, T40S, R13W, Curry County, Oregon. The Contractor shall furnish all supplies, materials, labor, supervision and transportation required to complete the project. Work includes, but is not limited to: • Soil erosion and pollution control • Temporary traffic control • Clearing and grubbing • Construction of sliver fills along guardrail shoulders as required • Removal of existing approach guardrails • Removal of existing bridge rails (existing rail posts to remain unless noted otherwise) • Installation of new bridge rails and approach guardrail • Concrete patch repair of existing superstructure, bridge bearing, and pier column • Rehabilitation of existing deck joints • Installation of steel jacket with concrete fill at base of bridge pier • Preparation of existing concrete bridge deck for multi-layer polymer concrete overlay • Construction of multi-layer polymer concrete overlay on existing bridge deck • Construction of rock gabion retaining wall at bridge end • Placement of tapered asphalt surfacing at bridge ends The magnitude of construction for this acquisition is between $250,000 and $500,000. The Government intends to award a firm-fixed price contract. This project is set-aside for small business concerns. A bid bond (20 percent) is required for offers exceeding $150,000. A payment bond (100 percent) and a performance bond (100 percent) will be required after award. The estimated start work date is August 2018, contract time estimated at 400 days. The project is 100% set aside for Small Business concerns. Note: Prospective awardees shall be registered in the System for Award Management (SAM) data base prior to award. Information on registration may be obtained via the internet at: http://www.sam.gov. All registrations must be in an "Active status" for the government to download electronically prior to contract award. Location: The work is located on the Gold Beach Ranger District, Rogue River Siskiyou National Forest, Curry County, OR.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/04N7/1204T018R0005/listing.html)
- Place of Performance
- Address: The work is located on the Gold Beach Ranger District, Gold Beach, Oregon, 97444, United States
- Zip Code: 97444
- Zip Code: 97444
- Record
- SN04917867-W 20180512/180510230535-d6c49a392c2b0e9761b7bcae3411e19e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |