Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 18, 2018 FBO #6020
MODIFICATION

Z -- Asbestos Abatement - Solicitation 1

Notice Date
5/16/2018
 
Notice Type
Modification/Amendment
 
NAICS
562910 — Remediation Services
 
Contracting Office
Department of Agriculture, Forest Service, R-2 White River National Forest, 900 Grand Ave., Glenwood Springs, Colorado, 81601, United States
 
ZIP Code
81601
 
Solicitation Number
1282D718Q0015
 
Point of Contact
Robert E. Hall, Phone: 9709453217
 
E-Mail Address
rehall@fs.fed.us
(rehall@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Attachment 12 - Fire Control Plan Attachment 11 - Wage Determination Attachment 10 - Sellars Park Area Map Attachment 9 - Sellars Park Photos Attachment 8 - Sellars Park ACM Report Attachment 7 - Tony Mine Area Map Attachment 6 - Tony Mine Photos Attachment 5 - Tony Mine ACM Partial Abatement Report Attachment 4 - Tony Mine ACM Report Attachment 3 - Meadow Mountain Area Map Attachment 2 - Meadow Mountain Photos Attachment 1 - Meadow Mountain ACM Report Return Form - This is the one you must fill in prices, sign and return. Solicitation The USFS R2 AQM office has issued a solicitation for asbestos abatement services. We plan to utilize simplified acquisition procedures to solicit and award a purchase order to satisfy the requirements below. - These structures have been inspected by a certified asbestos inspector and found to contain ACM that needs to be abated prior to demolition and disposal in local landfills. This is for abatement only. The demolition and hauling will be handled on a different project. - Project Locations - - 1. Meadow Mountain Chemical Storage Building - 24' x 16' - Township 5 South Range 81 West Section 22, 6th PM - Minturn, CO - 2. Tony Mine - ACM floor tile, gray caulk, gray cementious panesls, roofing materials, cementious pipe, black metal window glazing - 20' x 30' - Township 6 South, Range 76 West, Section 20, 6th PM - Note: some removal has been done since the original report in 2012. See the Partial abatement report. - 3. Sellar Park Cabin - ACM - black roofing tar - 17' x 10' building - Township 8 South, Range 82 West, Section 31, 6th PM - Contracting Requirements: 1. Active registration - www.sam.gov 2. Davis-Bacon Wage requirements for Eagle, Pitkin and Summit Countys 3. FAR Part 36 - Construction Clauses 4. FAR Part 13 - Simplified Procedures 5. IPP invoicing and Payment - www.ipp.gov - Pre-Bid Site Visit - A pre-bid site vist has been tentavively scheduled for 22 May at 12:00. Meet at the Holy Cross Ranger Station on 24747 US Highway 24, Minturn, CO. The Meadow Mountain Site is right across the street. Then we will travel to the Tony Mine near Breckenridge. You should have a high-clearance 4WD vehicle for this portion of the visit. There is no planned site visit for the Sellar Park location. - Required Vendor Actions. - 1. Print out, fill in your prices and send back the RFQ form. 2. Included your capabilities narrative, past peformance and references 3. Email to the POC prior to the close date. - Accept my apologies for putting the close date on a holiday, but we are attempting to have all obligations done by 1 Jun. Contract award will follow very quickly that week.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/0763b4fea0a3fa8e231b5e9fe9510098)
 
Place of Performance
Address: Various locations, Minturn, Colorado, United States
 
Record
SN04923768-W 20180518/180516230649-0763b4fea0a3fa8e231b5e9fe9510098 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.