Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 03, 2018 FBO #6097
AWARD

Y -- Smithville Svc. Bridge Crack and Spall Concrete Repair

Notice Date
8/1/2018
 
Notice Type
Award Notice
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Kansas City, Attn: CENWK-CT, 635 Federal Building 60l East 12th Street, Kansas City, Missouri, 64106-2896, United States
 
ZIP Code
64106-2896
 
Solicitation Number
W912DQ-18-B-1016
 
Archive Date
8/15/2018
 
Point of Contact
Willie E. Hodges, Phone: 8163893469
 
E-Mail Address
willie.e.hodges@usace.army.mil
(willie.e.hodges@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912DQ-18-C-1062
 
Award Date
7/31/2018
 
Awardee
Boone Construction Company, 5611 BROWN STATION RD<br />, COLUMBIA , Missouri 65202, United States
 
Award Amount
34926.25
 
Line Number
CLIN 0001
 
Description
Contract award notification. The Kansas City District has developed plans to repair concrete spalls and cracks at the Service Bridge pier at Smithville Lake, MO. All existing spalled and delaminated concrete shall be removed and replaced at the designated Center Pier of the Service Bridge. The work shall consist of furnishing all labor, equipment, materials, and services required to remove and replace a portion of the existing concrete in accordance with specifications. The existing concrete defects to be repaired are identified in the plans. Approximately 6 cubic feet of concrete shall be removed and replaced. The work shall also consist of furnishing all labor, equipment, and services required to repair existing concrete cracks with epoxy injection adhesive after removal of all loose concrete. Approximately 10 linear feet of epoxy crack injection shall be performed. This quantity is approximate and should be verified by the contractor and the COR prior to crack repair. Extents shall be documented prior to the start of the repair. The quantity of crack injection shall be approved by the COR prior to the contractor performing the crack injection.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA41/Awards/W912DQ-18-C-1062.html)
 
Record
SN05015303-W 20180803/180801230846-772dcae3d534405ff0b72f90006e561a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.