Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 08, 2018 FBO #6102
SOLICITATION NOTICE

Z -- FLFO-REPLACE HORNBEK WILDLIFE LOOP BRIDG

Notice Date
8/6/2018
 
Notice Type
Presolicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
NPS, IMR - Lakewood MABO 12795 W Alameda Parkway Lakewood CO 80228 US
 
ZIP Code
00000
 
Solicitation Number
140P1218Q0091
 
Response Due
9/18/2018
 
Archive Date
8/21/2018
 
Point of Contact
Rogers-Bailey, Shawna
 
Small Business Set-Aside
Total Small Business
 
Description
Description: The Work includes installation of a pedestrian bridge and foundations on the Hornbek Trail Loop. The bridge will have steel beams with wood deck and wood railing. Wood from the recently demolished bridge will be stored at the parking lot and requires disposal. Project Location: Hornbek Homestead located in Florissant Fossil Beds National Monument, on (Teller) County Road #1, approximately 1.5 miles south of Florissant Colorado. Hornbek Trail Loop Bridge is west of the homestead site approximately 1 / 4 mile and is accessed by foot trail. B.Work of this project may begin as approved by the Contracting Officer beginning any date on or after August 15, 2018. C.Definition of Contract Line Items: Contractor proposal shall list each line item. 1.Item No. 1 Disposal of Wood Bridge: Work includes loading and disposal of the demolished materials from the wood bridge that has been disassembled and stockpiled in the homestead parking lot. a.Measurement for payment will be on a lump sum basis as a single item of work. b.Payment will be made at the contract price per lump sum price. 2.Item No. 2 Bridge Construction: This item consists of work to construction cast in place concrete foundations, embedded accessories, bridge beams, wood railings, wood decking, applied wood protection, accessories, foundation stone veneer, compacted backfill, trail surfacing of granular fines and stone steps on the trail. a.Measurement for payment will be on a lump sum basis as a single item of work. b.Payment will be made at the contract price per lump sum price. 3.Item No. 3 Revegetation : This item consists of work to grade, rake and seed adjacent to the trail and disturbed areas using native grass seed. a.Measurement for payment will be on a lump sum basis as a single item of work. b.Payment will be made at the contract price per lump sum price. (10) Period of Performance: Estimated Period of performance is September 24, 2018 to November 30, 2018. (11) a. A description of the procedures to be used in awarding the contract: Request for Quotation b. The anticipated award date: September 20, 2018 (12) The Request for Quotation will be posted on www.fbo.gov and www.fedconnect.net Questions can be emailed to Shawna_Rogers-Bailey@nps.gov.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/140P1218Q0091/listing.html)
 
Record
SN05021825-W 20180808/180806230913-432ba47bcc1ad9118ce9ba76139cc586 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.