MODIFICATION
71 -- CHAPEL PEWS and installation (possible removal of old Pews) - CHAPEL LAYOUT (MAP)
- Notice Date
- 8/22/2018
- Notice Type
- Modification/Amendment
- NAICS
- 337127
— Institutional Furniture Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, AFTC/PZIO - Eglin, 308 West D. Ave, Bldg 260, Suite 130, Eglin AFB, Florida, 32542-5418, United States
- ZIP Code
- 32542-5418
- Solicitation Number
- FA2823-18-Q-3044
- Archive Date
- 9/13/2018
- Point of Contact
- Stella D. Cayer, Phone: 8508820346
- E-Mail Address
-
stella.cayer.1@us.af.mil
(stella.cayer.1@us.af.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- CHAPEL LAYOUT (MAP) This requirement is for purchase and installation of 43 chapel pews with vanity rails and kneelers. Also possible removal of existing pews proposed as a separate CLIN. Please read full description in the attached Statement of Work (SOW). -Vendor Questions are in process of being answered, the Due Date is being extended from 8/15/18 to 8/17/18 at 2PM Central Standard Time. -Vendor Questions are in process of being answered, the Due Date is being extended from 8/17/18 to 8/23/18 at 2PM Central Standard Time. -8/22/18 Due Date is being extended from 8/23/18 to 8/29/18 by 2pm CST QUESTIONS AND ANSWERS: 1.Please provide a floor plan in order to fully understand the layout of existing pews. Answer: See attachments for layout. All of the pews pictured (including the balcony) need to be removed. 2. With regard to schedule, is there a timeframe set for this project? Answer: Planning and ordering must begin before 30 Sep 2018, installation can be done within the contract Period of Performance. Monday through Wednesday is ideal for construction due to regularly scheduled programs. 3. At the proper time, can we schedule to have our guys show up to do the removal and then immediately start the installation? Answer: Yes, government must have removal and installation done close together in order to minimally disturb the events scheduled at that chapel. 4. Explain the term "Turn-in" ? Answer: "Turn in" is a process done on military base to turn in the existing pews to our reutilization center. The government will provide the dumpster or means of transporting the pews and will be responsible for disposal.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/dfa6fb9420afc75e1a1b9643a93e27dd)
- Place of Performance
- Address: West Chapel at Eglin AFB, FL, Eglin, Florida, 32542, United States
- Zip Code: 32542
- Zip Code: 32542
- Record
- SN05051276-W 20180824/180822231442-dfa6fb9420afc75e1a1b9643a93e27dd (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |