65 -- Cleveland Rethermalization System Solicitation Questions and Answers - Attachment

Notice Date
9/17/2018
 
Notice Type
Attachment
 
NAICS
333415 — Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
 
Contracting Office
Department of Veterans Affairs;Network Contracting Office 10;3140 Governor ™s Place Blvd. Suite 210;Kettering OH 45409-1337
 
ZIP Code
45409-1337
 
Solicitation Number
36C25018Q9612
 
Archive Date
10/17/2018
 
Point of Contact
Myron J Carson
 
Small Business Set-Aside
N/A
 
Description
Cleveland Rethermalization System Questions/Answers The following questions were submitted by potential contractors for the Cleveland Rethermalization System. Answers to questions are highlighted below each question (Government). All questions focused on Government/Contractor responsibilities. All questions were submitted by the deadline indicated in the solicitation. 1. Contractor Uncrate and sanitize dishware and serviceware. Government This will be the responsibility of Nutrition and Food Service. 2. Contractor Obtain all necessary building permits and approvals. Government The contractor will be responsible for obtaining all required permits and approvals for work performed. 3. Contractor Normal working hours/conditions. Government Work is to be performed during hours indicated in the SOW under normal working conditions. 4. Contractor Provide personnel for access to installation areas. Government Nutrition and Food Service and/or Engineering personnel will be available to allow Contractor personnel entry to installation areas. 5. Contractor All patching and painting work where CRIII equipment and anchoring hardware are removed (walls and floors) to be the responsibility of the facility. Government VA is responsible for this requirement. 6. Contractor Facility to ensure the floor is level and walls/floors clear of any obstructions in docking station installation area. Government VA is responsible for this requirement. 7. Contractor Facility to provide water line whips from shut-off valves (supply and return) to each docking station.   Whip connection to docking station will be a ¾ Garden Hose Thread (GHT) female connection.   If chilled water is being used, then the facility will need to insulate the (whip) lines.  . Government VA is responsible for this requirement. 8. Contractor Trash removal from facility property (with exception of CRIII docking stations and carts). Government VA is responsible for this requirement. 9. Contractor The facility will remove all of the branch refrigerant line circuits from the CRIII docking stations back to the (existing equipment) outdoor parallel refrigeration condensing unit.  The facility will remove and dispose of the refrigerant lines and any refrigerant line covers.  The (existing equipment) parallel refrigeration condensing unit should have a receiver size adequate enough to pump all the refrigerant into it during the deconstruction process.  If it does not, the facility will be responsible for recovering the refrigerant. Government VA is responsible for this requirement. 10. Contractor Facility to ensure the floor area for the docking stations and carts are level. Government VA is responsible for this requirement. 11. Contractor Clean and sanitize equipment locations. Government VA is responsible for this requirement. 12. Contractor Temporarily store equipment and/or purchased supplies prior to installation, if needed. Government VA is responsible for this requirement. 13. Contractor Provide a representative to ensure all equipment and accessories are accounted for upon receiving shipment of goods. Government VA and the Contractor are responsible for this requirement. 14. Contractor Any asbestos removal (where applicable) shall be the responsibility of the facility. Government VA is responsible for this requirement should it become necessary. 15. Contractor Provide adequate receiving time for staged shipment of (Contractor) provided equipment, at facility loading dock.  Delivery times to be coordinated with (Contractor) Project Manager. Government VA is responsible for this requirement. 16. Contractor Facility will make all reasonable efforts to adhere to (Contractor) provided construction schedule.   Any facility-initiated delays that result in a cost increase to (Contractor) may result in an extra charge to the facility. Government VA will make every effort to coordinate Contractor work schedule based on the SOW. All cost increases must be verified, reasonable, allocable, and allowable. 17. Contractor Could you please confirm for me what exactly you are wanting installed on this bid, and exactly what existing equipment you need removed and disposed of? Also, for the smallwares portion, (mugs, bowls, etc.) do those need to be delivered by the person doing the installation, or can they be drop shipped directly to you? Government The items listed in the solicitation attachment (Salient Characteristics List) that comprise the Food Service Meal Delivery Tray and POD Systems are to be installed per SOW. There was a site visit scheduled on Sep 10, 2018 in order for all potential contractors to see the existing equipment, and familiarize themselves with what the requirements are for the work to be completed. Unfortunately, I do not have a list of all existing equipment, so am unable to provide a specific answer to your question. With respect to the service ware, the installers do not need to deliver these items; however, the items must be in place in order to test the equipment upon installation.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/DaVAMC552/DaVAMC552/36C25018Q9612/listing.html)
 
Document(s)
Attachment
 
File Name: 36C25018Q9612 0001 36C25018Q9612 0001.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4595614&FileName=36C25018Q9612-0001000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4595614&FileName=36C25018Q9612-0001000.docx

 
File Name: 36C25018Q9612 0001 S05 - Cleveland Rethermalization System Questions and Answers.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4595615&FileName=36C25018Q9612-0001001.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4595615&FileName=36C25018Q9612-0001001.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN05092319-W 20180919/180917231158-7562cec520f86ae67782cc22c101c0b8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.