Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 11, 2018 FBO #6166
SOLICITATION NOTICE

Y -- NM FLAP 100(1) Soledad Canyon Road

Notice Date
10/9/2018
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
698219B000026
 
Point of Contact
Sheri Muehl, Phone: 7209633351
 
E-Mail Address
sheri.muehl@dot.gov
(sheri.muehl@dot.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS ON OR ABOUT 23 OCTOBER, 2016. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. This project is located to the east of Las Cruces, New Mexico in Doña Ana County on Soledad Canyon Road. The project begins at the intersection of Dripping Springs Road and continues to Organ Mountains - Desert Peaks National Monument. This is a desert environment located over a mile above sea level. The intent of this project is to improve access to the Organ Mountains - Desert Peaks National Monument for vehicles, pedestrians, and cyclists. The proposed project improvements will enhance Federal Lands, visitor access, improve multi-modal use, and improve drainage and sediment control. These improvements include roadway widening and resurfacing, introduction of a multi-use path, drainage improvements (arroyo improvements), parking lot improvements, signing, and new pavement markings. This project consists of Schedule A, Schedule B and Option Y. Schedule A and Schedule B begins at Dripping Springs Road and stops at the Organ Mountains - Desert Peaks National Monument boundary. Option Y continues from the end of Schedule A (or Schedule B) to and including the National Monument's parking lot. SIGNIFICANT QUANTITIES (Schedule B): 20401-0000, Roadway Excavation: 21,557 CUYD 30101-0000, Aggregate Base, Method 2: 24,792 TON 30402-1000, Full Depth Reclamation, Method 1: 73,071 SQYD 40101-5600, Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 21,188 TON 60901-1700, Curb, Concrete, 18-Inch Depth: 6,500 LNFT Soledad Canyon Road is located in a residential area. There are numerous driveways and side streets throughout the project that will need to remain open during construction. The project template utilizes the majority of the 60' right of way on this project. There are temporary easements for the side roads. There is limited room for any material or equipment storage outside the designated staging area. The current roadway alignment will be shifted during construction of the new pavement. Existing utilities may be relocated during construction and coordination will be required during these times. Anticipated Advertisement is at the end of October 2018 Anticipated bid opening end of November 2018 Anticipated Award in early December 2018 Anticipated Notice to Proceed in December 2018 Cross sections, pavement design report, and hydraulics report will be made available to perspective bidders.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/698219B000026/listing.html)
 
Place of Performance
Address: Organ Mountains - Desert Peaks National Monument in Dona Ana County NM, Dona Ana County, New Mexico, United States
 
Record
SN05118271-W 20181011/181009230539-3df3f5cc277f23ddf1c481c3aa641a7a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.