C -- Project 613-19-103 AE Services Design - Renovate/Upgrade Nutrition & Food Service Kitchen, Building 500 Basement - Attachment

Notice Date
10/29/2018
 
Notice Type
Attachment
 
NAICS
541310 — Architectural Services
 
Contracting Office
Department of Veterans Affairs;VAMC (613);VISN 5 Contract Satellite Office;510 Butler Avenue, Building 306A;Martinsburg WV 25405
 
ZIP Code
25405
 
Solicitation Number
36C24519R0009
 
Response Due
11/30/2018
 
Archive Date
1/29/2019
 
Point of Contact
Shari M Kesecker
 
E-Mail Address
3-0811
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Page 1 of 10 ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD. NAICS Code: 541 -- Professional, Scientific, and Technical Services; 541310 - Architectural The Department of Veterans Affairs Medical Center (VAMC); VISN 5 Contracting, 510 Butler Avenue, B306A, Martinsburg, WV 25405 is advertising for Architectural/Engineering Services to provide Schematic Design, LCCA, Design Development, Construction/Bid Documents, Specifications, Construction Cost Estimates, and Construction period services for the renovation and upgrade of the main kitchen in the basement of Building 500 at the VAMC, 510 Butler Avenue, Martinsburg, WV 25405. This acquisition is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. Any subsequent award will require firms to be registered in System for Award Management (SAM) (www.sam.gov) as a small business as well as VETBIZ (www.vetbiz.gov) registered/verified Service Disabled Veteran Owned Business. Eligible AE firms must have a working office location within 0-500 miles of the VA Medical Center, 510 Butler Avenue, Martinsburg, WV 25401. This distance is determined according to www.randmcnally.com and will be included as an evaluation factor for technical evaluation. The selected A/E firm shall be in accordance with FAR Part 2.101 definition of Architect-engineer services as defined in 40 U.S.C. 1102 and FAR Part 36.6 to provide professional A/E services for the project as required. The SDVOSB Architectural firm must employ the principle Architect responsible for design of this project, i.e. and be involved heavily in all aspects of the design, stamping drawings along with the other team disciplines. A/E(s) signing drawings must be licensed in the State of West Virginia. The license(s) are required at the time of an award to prospective A/E(s). The following A/E disciplines are expected to be required for this design effort: architecture, structural, civil, mechanical, plumbing, electrical, fire protection, industrial hygiene, interior design, surveyors, cost estimators, certified physical security specialist or other types of A/E services as defined by FAR Part 36.6 that may be necessary. Upon award, the scope may include, but is not limited to: This project will engage an (A/E) architectural/engineering firm to provide Schematic Design, LCCA, Design Development, Construction/Bid Documents, Specifications, Construction Cost Estimates, and Construction period services for the renovation and upgrade of the main kitchen in the basement of Building 500. Priorities of Work: This project provides a complete demolition of the approximately 16,000 s.f. kitchen, food storage, walk-in freezers, dishwashing, and kitchen administration area to provide a more efficient layout and resolve infection control issues. The project includes the design of a new kitchen and administration areas of approximately 12,000 s.f. (rooms GB100-GB122). In the 15% concept design submission, a minimum of three (3) alternate, preliminary design layouts will be submitted for consideration and VA comments to alter any of the preliminary design layouts will done at no additional cost to the Government. Also, to keep the kitchen operational during demolition and construction, in the 15% design submission will be a minimum of three (3) alternate phasing proposals. The possible alternate considerations may include the following individually or in combination. A budget cost analysis will accompany each scenario for construction phasing so the most appropriate and least expensive method may be chosen, but is not guaranteed. Demolition of an additional 6,800 s.f. office swing space area to utilize for the new kitchen for phasing purposes (rooms GA106-GA137). To relocate the occupants of these rooms, and as a first phase, renovation will be required of approximately 2900 s.f. of existing building 500 warehouse space in the basement (west end of GD100). The new space will be offices for the staff displaced from the swing space adjacent to the kitchen (rooms GB100-GB122). The warehouse mechanical unit does not have cooling. Evaluate the existing mechanical systems in the basement to determine which system will support the new swing space office area, and design an extension to that system to service the area. Utilize the former dining area in the Nursing Home 501 C for cooking. Some of the cooking equipment in the basement kitchen can be easily moved to this location. Replace the existing cook-chill-reheat methods, eliminating the retherm unit and reheat carts with a new system. Utilize the kitchen in Domiciliary 502 E for dish washing. Provide for the leasing of a mobile or modular kitchen. Provide an extensive phasing plan to maintain operations in the kitchen s present location. The Nutrition and Food Service Kitchen has numerous operational and condition deficiencies that will be corrected by this project. Deteriorated finishes lead to potential food contamination, old, failing mechanical systems lead to generation of mold, plumbing and floor drains continually back up, lighting is insufficient in many areas, built in equipment (refrigeration and freezers, etc.) has exceeded its useful life, and the current space arrangement is not conducive to efficient work flows. Additionally, there are issues with the HVAC system that prevent proper pressure control between the Kitchen and surrounding areas of the medical center. The electrical infrastructure exceeded its useful life. Last, this project will address removal of asbestos containing material. Replace air handling unit AC-1, and its associated equipment which services the kitchen spaces. Replace HVAC equipment including, but is not limited to SF-1, SF-24 (MUAU), RF-1, EF-1, EF-50, EF-51, EF-52 & EF-53. The make-up unit, SF-24, is near failure, as are the SF-1 cooling coils. Additionally, remedy the total exhaust in the kitchen which is imbalanced against supply, causing the pressure in hallway between the Kitchen and SPS/SPD to continually go negative with respect to the surrounding areas. The air terminal units are failed or failing, pressure dependent, and no longer accurately controlled. Replace mechanical room ventilation. Demolish old pneumatic controls and actuators and replace with electric. Replace the failing pneumatic controls with DDC. Demolish and replace all remaining pneumatic controls and panels, except for the 100-TR dedicated chiller for OR. That will be addressed on another project. The original, existing steam distribution system needs to be evaluated and repaired/replaced as necessary, particularly PRV-7A/B and PRV-8A/8 to point of connection for all N&FS equipment and isolate valve for domestic hot water. Do not replace PRV-7 and PRV-8. Proper would be PRV-12 and PRV-13. Both in failed/failing condition with missing insulation, leaks, and demolished bypass. Replace existing original chilled water secondary pumps, 500-P15 and 16, and install VFD s. Replace all floors, ceiling tiles, and lights with kitchen grade and durable quality materials. Revise drain system in entire kitchen, slope finished floors downward to drains. Demolish abandoned pulping system and provide new. Provide facilities needed for the composting operation, to include segregated, ventilated storage. Install variable speed automatic sensor hoods with a wash down system. Use a Commercial Kitchen Ventilation system, comparable with Me Link. Update intercom system so it can be heard in the kitchen. Add a card reader system with automatic sensing that will alarm if a door is open for more than 5 min. Disassemble present tray line and revise electric for two pod assembly stations, including cart dock plug ins. This contract will require a Commercial Kitchen Design/Consultant with at least five years experience designing hospital kitchens. An integrated design approach is expected. Provide for the purchase and installation of permanent energy efficient cook serve equipment: induction burners, grill, ovens, blast chiller replacements, etc. Recommend which new cook serve carts the VA should purchase. Provide for a new retherm box about half the size of the existing. Provide for a large volume grease trap suitably located for cleaning and that will be large enough for the new kitchen and the first-floor canteen. This will require a pumped system to discharge to gravity lines in the interstitial space above the basement. Add a supervisor office in tray line area and dish room area, both with large windows toward the work areas. Reconfigure administrative office area to include chief s office in the grouping. The new training room shall be larger. Refer to the SEPS space program. The new storage space in kitchen shall be larger. Refer to the space program. The new employee lounge area shall accommodate 3 computer cubicles, a microwave, and a full-size refrigerator. Replace dish machine and tray scrapping table/trough. Add automatic cart wash in dish room. Improve the guarding for the building expansion joints to prevent leakage, and install a draining pan system. Provide for all new walk-in coolers and freezers and cooling equipment. Add a pull thaw compartment to the refrigeration system. All lighting, including that in the cooler/freezers, shall be DLC listed LED lighting. Design new offices (ingredient control, etc.). Perform a condition assessment of the main hood exhaust system including the exhaust fan on the penthouse roof to determine if it needs to be refurbished and or a new fan installed. At a minimum the A/E shall reference the VA design guide plates located at http://www.cfm.va.gov/til/dGuide.asp for comprehensive architectural and engineering requirements for each space listed. Functional and space programs shall be developed using VA Space and Equipment Planning System (VA-SEPS). This information shall be defined by the A/E with VA input and assistance. The A/E will perform all surface and subsurface investigative work pertaining to foundations, geotechnical, structural, mechanical, electrical, plumbing, fire alarm, sprinkler, telecommunication, public address system and their associated appurtenances located in other areas of the work area as deemed necessary to provide a complete and constructible design. In addition to design of required new work areas the A/E will design the required rerouting, relocation, and/or extension of all existing utilities electrical, plumbing, etc. which may pass thru the proposed design area servicing surrounding spaces and future expansions. The A/E will incorporate Sustainability philosophies with the current VA design guides, space planning criteria, and technical criteria. The heating, ventilation, and air conditioning (HVAC) design shall comply with the VA HVAC Design Manual. Controls will be compatible with existing Johnson Metasys Building Automation System. Design shall also include recommendation of at least three energy savings alternatives for consideration. Commissioning will be performed by third party contract directly with the VA. The A/E will be responsible for incorporating commissioning specifications in accordance with the VA Whole Building Commissioning Process Manual, dated 5/1/ 2013. Fire and Life Safety requirements will be designed under the Governing Codes of NFPA 101 Life Safety Code (2018 Edition) and the Department of Veterans Affairs Fire Protection Design Manual (2015 Edition), or most current edition in publication. A/E will perform a Life Cycle Cost Analysis (LCCA) to investigate and provide recommendations for sustainability and energy saving alternatives, which will include the following: The VA Sustainable Design Manual, current edition, is applicable. Included shall be the requirements of section 01 81 13.11, Sustainability Certification Requirements - LEED HC V3, or 01 81 13.21, Sustainability Certification Requirements - Green Globes. The design shall utilize ASHRAE 90.1-2016. Master Construction Specification 01 81 11, Sustainable Design Requirements, shall be used. For LED lighting applications, Design Light Consortium (DLC) listing is preferred. The A-E will prepare and submit application for the West Virginia business incentive, lighting for business program. This program is managed by the electrical service provider First Energy. Details, spreadsheet, application form, and information are available at http://www.energysavewv-business.com The design shall include use of Energy Star, FEMP-designated (Federal Energy Management Program, and EPA Water Sense products where applicable. Design shall incorporate Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings. At paragraph 40, the A-E will be responsible for arc flash analysis and labeling. Please copy same verbiage as already provided from VA Electrical Design Manual. The A/E shall perform all calculations, studies, analysis and reports as detailed under the VA Electrical Design Manual, paragraphs 1.10.1, 1.10.21.10.3, and 1.10.4. The A/E shall not consider this as authority for sole source. Calculations will be based on basis of design provided by the A/E, and revised during the submittal review process. These studies will be used to update the existing Wiley & Wilson 2016 Electrical Deficiencies Study using SKM Power Tools. A/E is responsible for creating and applying arc flash labels in compliance with NFPA 70E-2018. The A-E will correct all electrical deficiencies within project area as identified by the 2016 Electrical Deficiencies Study, Section 7.4. A CD copy will be provided. Each item listed under item B above will be reviewed during the Schematic, Design Development and Construction and Bid Document stages and evaluated for probable cost. II. PROJECT INFORMATION: Background Information: The VA Facilities Management Department drawing files shall be made available to the A/E team for reference and duplication. All VA facility as-built drawings are provided to the A/E for informational purposes only. All documents provided portraying existing conditions shall be checked for accuracy. AutoCAD (version 2014) files, site plans and utilities will be provided in electronic format as available. The Architect/Engineer shall use the following standards when developing the design. VA information may be downloaded from http://www.va.gov/facmgt/standard/ VA Master Construction Specifications VA Standard Details VA Design and Construction Procedures VA Design Manuals A/E Submission Instructions for Minor and NRM Construction Program Guide, PG-18-15, Volume C (http://www.cfm.va.gov/til/aeDesSubReq.asp). Site Development Design Manual, PG -18 -10. Energy Independence & Security Act (EISA), 2007, section 438. VAMC Martinsburg Storm Water Management Plan (SWMP). The Architect/Engineer shall take minutes of all meetings, conferences, and site visits. A copy of the minutes shall be provided, within (7) days of the occurrence, to the Contracting Officer for concurrence. Auto CAD Requirements: All drawings shall be created in AutoCAD 2014. Drawings shall be D size, using the VA standard title block Note: a six percent (6%) A/E limitation imposed by law exists for the preparation of contract drawings and specifications portion of the contract per 48 CFR, Chapter 8, Part 836.606-73 Project Funds Limitation- Construction Cost Budget $6,588,000. PROPOSED SCHEDULE (Subject to change due to final determination of Pre- design Meeting date, but durations will remain the same). The A/E shall perform the work required by this contract within the limits of the following schedule and shall provide professional architects and engineers as directed by the Contracting Officer who are familiar with the work to attend the Design Reviews which may be scheduled at the time of each design submission. All days listed are calendar days. Award of Design: Program Verification Meeting: 14 Calendar Days Preliminary Design 15% - 21 Calendar Days VA Design Comments 14 Calendar Days Schematic Design 30% - 45 Calendar Days VA Design Comments 14 Calendar Days Design Development 60% - 60 Calendar Days VA Design Comments 14 Calendar Days Construction Documents 95% - 60 Calendar Days VA Design Comments 14 Calendar Days Final Documents 100% - 28 Calendar Days VA Design Comments 14 Calendar Days Bid Documents 7 Calendar Days III. PRELIMINARY DESIGN REQUIREMENTS: 15% The A/E shall evaluate all the items listed in the scope of work above and determine severity with a recommended priority for correction. Include a site visit for key team members to interview staff/users. At least three preliminary plan solutions shall be presented at the 15% review meeting for evaluation and selection/ direction by the VA. The A/E shall determine what if any additional support documentation shall be provided at this presentation to present and convey each of the solutions. Provide 1 set of full size drawings, 3 sets of half size drawings, 2 sets of binders for support documentation and 2 compact disks of entire submission. IV. SCHEMATIC DESIGN REQUIREMENTS: 30% A. Per the schedule above, the A/E shall provide 30% Schematic Design documents for review. B. Provide 1 set of full size drawings, 3 sets of half-size drawings, 2 sets of binders for specifications and support documentation and 2 compact disks of entire submission. Submission requirements at a minimum shall match items listed under Schematic in A/E Submission Instructions for Minor and NRM Programs (PG-18-15) for the varying disciplines and deliverable requirements. The A/E with the assistance of the VA shall identify items of work that will be bid alternates in the amount of approximately 10% of the estimated construction cost. Include a Site Visit for this submission with key team members to interview staff for comments. Provide a 3D model in REVIT, AutoCAD drawings, drawings in Adobe pdf, specifications in Word in the tracking mode, and specifications in pdf. IV. DESIGN DEVELOPMENT REQUIREMENTS: 60% A. Per the schedule above, the A/E shall provide 60% Design Development documents for review. B. Provide 1 set of full size drawings, 3 sets of half-size drawings, 2 sets of binders for specifications and support documentation and 2 compact disks of entire submission. Submission requirements at a minimum shall match items listed under DD in A/E Submission Instructions for Minor and NRM Programs (PG-18-15) for the varying disciplines and deliverable requirements. The A/E with the assistance of the VA shall identify items of work that will be bid alternates in the amount of approximately 10% of the estimated construction cost. Include a Site Visit for this submission with key team members to interview staff for comments. Provide a 3D model in REVIT, AutoCAD drawings, drawings in Adobe pdf, specifications in Word in the tracking mode, and specifications in pdf. V. CONSTRUCTION DOCUMENTS REQUIREMENTS: 95% A. Per the schedule above, the A/E shall provide 95% Construction Documents for review. B. Provide 1 set of full size drawings, 3 sets of half-size drawings, 2 sets of binders for specifications and support documentation and 2 compact disks of entire submission. Submission requirements at a minimum shall match items listed under CD in A/E Submission Instructions for Minor and NRM Programs (PG-18-15) for the varying disciplines and deliverable requirements. The A/E with the assistance of the VA shall identify items of work that will be bid alternates in the amount of approximately 10% of the estimated construction cost. Include a Site Visit for this submission with key team members to interview staff for comments. Provide a 3D model in REVIT, AutoCAD drawings, drawings in Adobe pdf, specifications in Word in the tracking mode, and specifications in pdf. VI. FINAL DOCUMENTS REQUIREMENTS: 100% A. Per the schedule above, the A/E shall provide 100% Construction Documents for review. B. Provide 1 set of full size drawings, 3 sets of half-size drawings, 2 sets of binders for specifications and support documentation and 2 compact disks of entire submission. Submission requirements at a minimum shall match items listed under CD in A/E Submission Instructions for Minor and NRM Programs (PG-18-15) for the varying disciplines and deliverable requirements. The A/E with the assistance of the VA shall identify items of work that will be bid alternates in the amount of approximately 10% of the estimated construction cost. Provide a 3D model in REVIT, AutoCAD drawings, drawings in Adobe pdf, specifications in Word in the tracking mode, and specifications in pdf. VII. BID DOCUMENTS REQUIREMENTS. A. Per the schedule above, the A/E shall provide Bid Documents for review. B. Provide 2 sets of full size drawings, 5 sets of half-size drawings, 3 sets of binders for specifications and support documentation and 3 compact disks of entire submission. Hard copies shall be made from the CD so there is assurance the print copies and digital copies are the exact same. Submission requirements at a minimum shall match items listed under CD in A/E Submission Instructions for Minor and NRM Programs (PG-18-15) for the varying disciplines and deliverable requirements. The A/E with the assistance of the VA shall identify items of work that will be bid alternates in the amount of approximately 10% of the estimated construction cost. If any changes have been made, provide the updated 3D model in REVIT, AutoCAD drawings, drawings in Adobe pdf, specifications in Word in the final accepted changes mode, and specifications in pdf. Note: AE shall not proceed with any subsequent submission or anticipated design work without the expressed written permission of the Contracting officer. VIII. DESIGN PERIOD SERVICES REQUIREMENTS: The A/E shall provide submissions as listed above. The electronic submission of drawings shall be both in the AutoCAD CAD format as well as Adobe PDF. The PDF format shall be a combined set. Word, Excel, PowerPoint, etc. shall all be in the latest format as used by the VAMC-Martinsburg, WV as well as PDF copies. The A/E shall maintain a secure web based repository e.g. FTP, to allow for the file transfer to the VA by the COR of all submission stages as well as providing the ability for the COR to upload any reference files required by the A/E. Access to this site shall adhere to VA standards for information security and protection of data. During the bidding period the A/E shall incorporate all addendum modifications resulting from RFI s, clarifications, corrections, and etc. into the contract documents using revision clouds on the drawings and revision dated footers into the specifications. Before construction contract award the A/E shall resubmit 3 compact disks of electronic copies of the revised drawings and specifications for use during the construction period. Architect/Engineer to provide in fee proposal the following site visits Pre- Design Kick Off Meeting with Users Review of Preliminary Design 15% Review of Schematic Design 30% Review of Design Development 60% Review of Contract Documents 95% Review of Final Documents 100% IX. CONSTRUCTION PERIOD SERVICES REQUIREMENTS: Note: VA will perform daily construction administration and inspection including issuing change orders and answering RFI s. A/E shall answer RFI s when requested by the VA. A/E team to perform review (for approval or revisions) of all construction submittals. A/E team to provide 1 set of D s -size as-builts at the completion of the project from marked-up construction drawings within 30 days of construction completion. A Compact Disk will also compliment with as-built information will be provided to the VA for archive. A/E team shall participate in Pre-Construction Conference (TBD) 5 Construction Site Visits (TBD) Final Inspection The Government anticipates award of a firm-fixed price Architectural Services contract. (Note: The Government reserves the right to cancel the contract(s) at any time if it is in the best interest of the Government.) The North American Industry Classification System (NAICS) Codes that apply to this solicitation are 541310 Architectural Services (Small Business size standard of $7.5 million dollars average annual gross revenues for the past three fiscal years). The A/E selection criteria shall include the following elements (I) through (VII), listed in order of importance or merit. FAILURE TO CLEARLY ADDRESS ALL LISTED EVALUATION CRITERIA AND INFORMATION REQUIRED BY THE SUBMISSION REQUIREMENTS BELOW MAY RESULT IN REJECTION OF SF 330. The AE interview scoresheet (table) reflected below shows the evaluation factors that will be used to evaluate each firm (as a team) for both shortlist SF330 s and upon completion of all interviews. The table shows the posted Weights for each factor and the evaluators will assign a raw score, that raw score will be multiplied to the Weighted value to arrive at a weighted score. These scores will then be totaled for a total weighted score. It is anticipated that at least 3-5 AE firms will be granted an interview (this number could be reduced or expanded if it is determined to be in the best interest of the Government. Eligible AE firms must have a working office location within 0-500 miles of the VA Medical Center, 510 Butler Avenue, Martinsburg, WV 25401. This distance is determined according to www.randmcnally.com and will be included as an evaluation factor for technical evaluation. I - PROFESSIONAL QUALIFICATIONS 15 1. Resume of each team member   2. Designers of record and their discipline   3. Reputation and standing of the firm principal officials   with respect to professional performance, general   management philosophy.   4. Specific experience and qualification of personnel/team   proposed for assignment to the project and their   record of working together as a team.   5. Proposed management plan and design development process.   6. Proposed approach to estimating construction costs.         II - SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE 20 1. Narrative of up to 10 relevant projects completed   within the last five years that illustrates overall team   experience.   2. General list of healthcare projects in last 5 years by team members.   3. Experience in hospital kitchen design, renovation, associated workflow   4. Experience in energy conservation/sustainability   III- PAST PERFORMANCE 20 1. Specific cost control measures utilized in Factor II submitted projects.   2. Quality control process(es) utilized in Factor II submitted projects.   3. Performance schedules challenges and compliance in Factor II projects.   4. List relevant projects constructed within last 10 years with   original budget, final budget, final estimate, construction contract, total   change orders   5. Projects demonstrating experience working with Government entities   6. Copy of performance evaluations and owner points of contact.   7. Included evaluations for projects in Factor II.1.&2 above.   IV - ORGANIZATION, MANAGEMENT AND QUALITY CONTROL 20 1. Firm's organization and management process for this contract   2. Quality control program for this contract with name of person responsible   for QA/QC and person responsible for technical/constructability   review (provide examples, checklists).   3. Ability to handle other projects for multiple clients with varying types   of project requirements and technical challenges   4. Team's organization for this contract (provide organization chart that   identifies overall relationship and lines of authority of the team)   V - CAPACITY 15 1. Available resources to accomplish task orders on time sensitive schedules   2. Process controls proposed for keeping team members on schedule.   3. Describe experience in delivery of projects on a time sensitive schedule   4. Current contracts greater than $20,000   5. Current workload and availability of the team   VI - LOCATION     10 1. Geographical location from West Virginia Veterans Affairs hospitals and knowledge   of locality           VII - LITIGATION AND INSURANCE 10 1. Record of significant claims against the firm and team members       THIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330's Architect/Engineer Qualifications packages only. Any requests for a solicitation will not receive a response. No material will be issued and no solicitation package or bidder/plan holder list will be issued. The socio-economic set-aside associated with this advertisement is 100% Total Service Disabled Veteran Owned Small Business (SDVOSB) Set Aside. Therefore, this acquisition is open to all prime firms meeting the qualifications of SDVOSB under the associated NAICS code as registered in SAM and VETBIZ. Qualified A/E firms are required to submit THREE (3) hard copies and ONE (1) electronic copy via CD of their entire completed SF Form 330 packages; SF 330 forms are available on-line at: http://www.gsa.gov/portal/forms/type/SF. Submission of information incorporated by reference is not allowed. Submissions are limited to 75 pages, no photographs. Information shall be submitted no later than November 30, 2018 by 4:30pm (close of business EST). Telephone inquiries will not be honored. No faxed or emailed forms/submissions will be accepted. Mailed submissions sent to: Department of Veterans Affairs Medical Center, Attn: Shari M. Kesecker, SAO East/VISN 5 Contracting, 613/90C, 510 Butler Avenue, B306A, Martinsburg, WV 25405 on the date and time specified above. This acquisition is for Architect/Engineer (A/E) services, and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. All submissions will be evaluated in accordance with the evaluation criteria. A "short listing" of 3-5 (more or less) firms deemed most highly rated after initial source selection (shortlisted) will be chosen for interviews. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. NOTE: UPON AWARD, THE FOLLOWING WILL APPLY: The A/E disciplines include, but are not limited to, the following: Architectural, Civil, and Mechanical/Electrical/Plumbing (MEP) which includes the following disciplines: estimating, structural, mechanical (HVAC), electrical, plumbing, geotechnical, design, certified physical security specialist and engineering services related to healthcare facilities. Award is contingent upon the availability of funds. Contracting Office Address: Department of Veteran Affairs Shari M Kesecker, CO 613/90C 510 Butler Avenue, Building 306A Martinsburg, WV 25405 Point of Contact(s): Shari M. Kesecker, Contracting Officer, email address: shari.kesecker@va.gov
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/MaVAMC613/MaVAMC613/36C24519R0009/listing.html)
 
Document(s)
Attachment
 
File Name: 36C24519R0009 36C24519R0009.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4657467&FileName=36C24519R0009-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4657467&FileName=36C24519R0009-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN05137472-W 20181031/181029230719-467a85065391e089b881058b57a3af56 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.