MODIFICATION
Y -- Reach H Levee Improvement Construction Project - Solicitation 1
- Notice Date
- 11/5/2018
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Sacramento, 1325 J. Street, Sacramento, California, 95814, United States
- ZIP Code
- 95814
- Solicitation Number
- W9123819B0001
- Response Due
- 12/7/2018 10:00:00 AM
- Archive Date
- 12/22/2018
- Point of Contact
- Gregory L. Treible, Phone: 9165576718, Leah Caldwell, Phone: (916) 557-7467
- E-Mail Address
-
Greg.L.Treible@usace.army.mil, Leah.M.Caldwell@usace.army.mil
(Greg.L.Treible@usace.army.mil, Leah.M.Caldwell@usace.army.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Exhibit E CLIN 2002 - Maintenance Road Construction (Vertical Chain Trenching quantities) Exhibit D CLIN 2001 - I-80 Seepage Berm and Ramp Construction (Vertical Chain Trenching quantities) Exhibit C CLIN 1002 - Maintenance Road Construction (Open Trench quantities) Exhibit B CLIN 1001 - I-80 Seepage Berm and Ramp Construction (Open Trench quantities) Exhibit A CLIN 0001 Vertical Chain Trenching Method Exhibit A CLIN 0001 Open Trench Method Attachment 05 Wage Determination Attachment 04 Technical Specifications Attachment 03 Reach H Supplementary Condition Requirements Attachment 02 Reach H Plans Attachment 01 List of Drawings Invitation for Bid ***FOR SUBCONTRACTOR OPPORTUNITIES ONLY*** In accordance with the solicitation process identified in Sources Sought Number W91238-18-S-1618, dated 13 April 2018, the following solicitation is posted for subcontractor opportunities only. This solicitation is proceeding as a 100% Total Small Business Set Aside for those prequalified small business concerns identified on the Prequalified Sources List (PSL) dated 18 May 2018 and revised on 22 June 2018. Only those small business concerns identified on the PSL are eligible to submit a bid for this project. Reach H Levee Improvement Construction Project: The Natomas East Main Drainage Canal west levee requires cutoff wall improvements from the pumping station just upstream of Dry Creek downstream (south) to Arden-Garden Connector Bridge. The length of this reach is approximately 4.0 miles. The general improvements include improving the existing levee by fix in-place construction, and installation of a seepage cutoff wall with a depth of approximately 30-70 feet, and flattening the landside levee slope. There are two pump-stations which will require the discharge pipes to be raised. Installation of a landside maintenance road is also required. The cutoff wall construction may be performed by applying either the vertical chain trenching (also known as One Pass Trenching (OPT)) or open trench (conventional long-stick) method. In accordance with the DFAR 236.204(ii), the magnitude disclosure of this construction project is between $25M and $100M. This proposed contract action will be conducted using FSC Code: Y1LC and NAICS: 237990.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA05/W9123819B0001/listing.html)
- Record
- SN05143223-W 20181107/181105230550-904fd90cefe59584f511acb3891c1ec4 (fbodaily.com)