Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 16, 2020 SAM #6622
SOLICITATION NOTICE

Z -- Redmond Air Center Ramp Repair

Notice Date
1/14/2020 3:30:40 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
OCHOCO NATIONAL FOREST PRINEVILLE OR 97754 USA
 
ZIP Code
97754
 
Solicitation Number
1204N020Q0005
 
Archive Date
02/01/2020
 
Point of Contact
Cynthia B. Armour, Phone: 5414166662, Fax: 5414166661, Chad Houchin, Phone: 541-383-5546
 
E-Mail Address
cynthia.armour@usda.gov, chad.houchin@usda.gov
(cynthia.armour@usda.gov, chad.houchin@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This project consists of improvements to the aviation facilities at the Redmond Air Center (RAC) on the Deschutes National Forest.� The work will address existing deficiencies and deferred maintenance at the Airtanker Ramp (Work Area 1), Smokejumper Ramp (Work Area 2) and Airtanker Ramp Entry Road (Work Area 3).� Work at all three areas will require coordination with the Redmond Airport and/or the US Forest Service for security. The Airtanker Ramp is approximately 380,000 square feet of asphalt pavement and three existing concrete parking pads.� New work will include construction of a fourth concrete pad to support a parked Airtanker.� This will require demolition of some existing pavement and a new asphalt section around the pad to tie back to the existing asphalt.� Additional maintenance work on the Airtanker Ramp will include crack sealing, seal coating the entire surface and restriping. The Smokejumper Ramp is approximately 177,000 square feet of asphalt pavement.� Maintenance work on the Smokejumper Ramp will include crack sealing, seal coating the entire surface and restriping.� The Airtanker Entry Road is appoximately 31,000 square feet of asphalt.� �New work will consist of expanding the current asphalt vehicle parking area by adding two additional parking spaces and a construction of a 12� wide asphalt path.� Additional maintenance work on the Airtanker Entry Road will include crack sealing, seal coating the entire surface and restriping.� Contractors shall utilize products and material made from biobased materials and recovered materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a quality that conform to applicable Federal specifications and standards.� All supplies and materials to be used in performance of work described herein are subject to the approval of the technical representative (COR). � Formal advertisement of this project is anticipated in mid to early February, 2020.� For technical inquiries please contact:� Chad Houchin, COR, (541) 383-5546.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/61a5129f53554c0499546abf648ef7bd/view)
 
Place of Performance
Address: OR 97756, USA
Zip Code: 97756
Country: USA
 
Record
SN05534297-F 20200116/200114230136 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.